Stuart, Florida Impact Fees

Stuart applies its own fee schedule: municipal fees plus the Martin County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $13,075.99 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Stuart Impact Fees by Project Type

Stuart: Single-Family Impact Fees

A new single-family home in Stuart pays at least $13,075.99 per unit in impact fees (rates sourced October 21, 2026). Of that, Martin County-levied fees account for $5,567.39 and municipal or utility fees for $7,508.60.

The largest line items are School Impact Fee (Martin County School District - Stuart) ($5,567.39), Sewer Availability Fee (City of Stuart) — 1.5 ERC × $2,092/ERC ($3,138.00) and City Impact Fee (City of Stuart) ($2,051.00).

Water Availability Fee (City of Stuart) — 1.2 ERC × $1,933/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Impact Fee (Martin County - Stuart) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Stuart Impact Fee Schedule
Water$2,319.60
  • Water Availability Fee (City of Stuart) — 1.2 ERC × $1,933/ERC
    City of Stuart Utilities
    City of Stuart water availability (impact) fee: $1,933 per equivalent residential connection for service inside the city ($2,416 outside the city), payable before building permit issuance. The city code defines one ERC as 250 gallons per day and rates a 3-bedroom home of 1,201 to 2,250 sq ft at 300 gallons per day.
    $2,319.60Requires confirmation
Sewer$3,138.00
  • Sewer Availability Fee (City of Stuart) — 1.5 ERC × $2,092/ERC
    City of Stuart Utilities
    City of Stuart sewer availability (impact) fee: $2,092 per equivalent residential connection inside the city ($2,615 outside), payable before building permit issuance. One ERC is 200 gallons per day; a 3-bedroom home of 1,201 to 2,250 sq ft is rated at 300 gallons per day (1.5 ERC), rounded up to the nearest 0.1 ERC.
    $3,138.00
City$2,051.00
  • City Impact Fee (City of Stuart)
    City of Stuart
    City of Stuart impact fee for a single-family home: $2,051 per unit (Parks $182, Multimodal $732, Public Safety $1,137), the '2026 and Beyond' rate effective January 1, 2026, the final step of the adopted schedule. The City may add an administrative charge of up to 3%.
    $2,051.00
County$5,567.39
  • School Impact Fee (Martin County School District - Stuart)
    1,101-2,300 sq ft
    Martin County School District
    The Martin County School District educational facilities impact fee is levied countywide, including within the City of Stuart, and is collected by the municipality at building permit (LDR Art. 6, Div. 2, §§ 6.41 and 6.47). Assessed by dwelling-unit size; the 1,101–2,300 sq ft tier (canonical house) is $5,567.39 per unit under the schedule effective October 1, 2008 (tiers $3,609.37–$5,756.12).
    $5,567.39
  • County Impact Fee (Martin County - Stuart)
    Martin County Board of County Commissioners
    Martin County's impact fee ordinance reaches incorporated areas to the extent the Florida Constitution allows, bars any municipality in the county from issuing a building permit until county impact fees are paid, and places incorporated areas inside its fire rescue, law enforcement, public buildings, library, parks and conservation benefit districts (LDR Art. 6, Secs. 6.3, 6.7 and 6.8). The City of Stuart's impact fee page states that properties in the city may owe both City of Stuart and Martin County impact fees. The City also levies its own impact fee.
    Requires confirmation
Total (Stuart): $13,075.99
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Martin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Stuart: Multifamily Impact Fees

A new multifamily unit in Stuart pays at least $10,144.48 per unit in impact fees (rates sourced October 21, 2026). Of that, Martin County-levied fees account for $5,355.08 and municipal or utility fees for $4,789.40.

The largest line items are School Impact Fee (Martin County School District - Stuart, MF) ($5,355.08), Sewer Availability Fee (City of Stuart, MF) — 1.0 ERC × $2,092/ERC ($2,092.00) and City Impact Fee (City of Stuart, MF) ($1,151.00).

Water Availability Fee (City of Stuart, MF) — 0.8 ERC × $1,933/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Impact Fee (Martin County - Stuart, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Stuart Impact Fee Schedule
Water$1,546.40
  • Water Availability Fee (City of Stuart, MF) — 0.8 ERC × $1,933/ERC
    City of Stuart Utilities
    City of Stuart water availability (impact) fee: $1,933 per equivalent residential connection inside the city ($2,416 outside), payable before building permit issuance. The city code defines one ERC as 250 gallons per day and rates a 2-bedroom unit of 751 to 1,200 sq ft at 200 gallons per day.
    $1,546.40Requires confirmation
Sewer$2,092.00
  • Sewer Availability Fee (City of Stuart, MF) — 1.0 ERC × $2,092/ERC
    City of Stuart Utilities
    City of Stuart sewer availability (impact) fee: $2,092 per equivalent residential connection inside the city ($2,615 outside), payable before building permit issuance. One ERC is 200 gallons per day; a 2-bedroom unit of 751 to 1,200 sq ft is rated at 200 gallons per day (1.0 ERC).
    $2,092.00
City$1,151.00
  • City Impact Fee (City of Stuart, MF)
    City of Stuart
    City of Stuart impact fee for a multifamily unit (2 or more units per structure): $1,151 per unit (Parks $98, Multimodal $439, Public Safety $614), the '2026 and Beyond' rate effective January 1, 2026, the final step of the adopted schedule. Applies to all multifamily regardless of building height. The City may add an administrative charge of up to 3%.
    $1,151.00
County$5,355.08
  • School Impact Fee (Martin County School District - Stuart, MF)
    801-1,100 sq ft
    The Martin County School District educational facilities impact fee is levied countywide, including within the City of Stuart, and is collected by the municipality at building permit (LDR Art. 6, Div. 2, §§ 6.41 and 6.47). Assessed by dwelling-unit size; the 801–1,100 sq ft tier (canonical unit) is $5,355.08 per unit under the schedule effective October 1, 2008 (tiers $3,609.37–$5,756.12).
    $5,355.08
  • County Impact Fee (Martin County - Stuart, MF)
    Martin County Board of County Commissioners
    Martin County's impact fee ordinance reaches incorporated areas to the extent the Florida Constitution allows, bars any municipality in the county from issuing a building permit until county impact fees are paid, and places incorporated areas inside its fire rescue, law enforcement, public buildings, library, parks and conservation benefit districts (LDR Art. 6, Secs. 6.3, 6.7 and 6.8). The City of Stuart's impact fee page states that properties in the city may owe both City of Stuart and Martin County impact fees. The countywide school impact fee applies separately.
    Requires confirmation
Total (Stuart): $10,144.48
Sources last checked Official fee schedules:City of Stuart Utilities City of Stuart Martin County Board of County Commissioners
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Martin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Stuart: Commercial Impact Fees

Commercial development in Stuart pays $2.87 per square foot in impact fees, plus $4,025.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $147,675.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Availability Fee (City of Stuart) — 1 ERC, inside city ($1,933.00 one-time) and City Impact Fee (City of Stuart, Commercial) ($2.87/sq ft).

Sewer Availability Fee (City of Stuart) — 1 ERC, inside city is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Impact Fee (Martin County - Stuart, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Stuart Impact Fee Schedule
Water$1,933.00 one-time
  • Water Availability Fee (City of Stuart) — 1 ERC, inside city
    City of Stuart Utilities
    City of Stuart water availability fee, charged per ERC for each new connection to the city water system: $1,933 per ERC inside the city and $2,416 per ERC outside. One ERC equals 250 gallons/day; the ERC count comes from the Code's flow table by use, so the total scales with the use's design flow. Paid before the building permit is issued.
    $1,933.00 one-time
Sewer$2,092.00 one-time
  • Sewer Availability Fee (City of Stuart) — 1 ERC, inside city
    City of Stuart Utilities
    City of Stuart sewer availability fee, charged per ERC for each new connection to the city sewer system: $2,092 per ERC inside the city and $2,615 per ERC outside. One ERC equals 200 gallons/day of water use; the ERC count comes from the Code's flow table by use and is rounded up to the nearest 0.1 ERC. Paid before the building permit is issued.
    $2,092.00 one-timeRequires confirmation
City$2.87/sq ft
  • City Impact Fee (City of Stuart, Commercial)
    City of Stuart
    Effective for permits in 2026 and later; this is the terminal rate with no further scheduled increases. Charged per 1,000 sq ft of gross floor area. A 3% administrative fee may be added. Assessed on the net increase over the prior use of the site.
    $2.87/sq ft
County$0.00
  • County Impact Fee (Martin County - Stuart, Commercial)
    Martin County Board of County Commissioners
    The City of Stuart levies its own impact fees for parks, multimodal transportation and public safety. Martin County's impact fee ordinance reaches incorporated areas to the extent permitted by the Florida Constitution, so county components the City does not levy may also apply.
    Requires confirmation
Total (Stuart): $2.87/sq ft + $4,025.00 one-time (≈ $147,675.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Stuart Utilities City of Stuart Martin County Board of County Commissioners
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Martin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Stuart: Industrial Impact Fees

Industrial development in Stuart pays $0.48 per square foot in impact fees, plus $4,025.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $27,875.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Availability Fee (City of Stuart) — 1 ERC, inside city ($1,933.00 one-time) and City Impact Fee (City of Stuart, Industrial) ($0.48/sq ft).

Sewer Availability Fee (City of Stuart) — 1 ERC, inside city is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Impact Fee (Martin County - Stuart, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Stuart Impact Fee Schedule
Water$1,933.00 one-time
  • Water Availability Fee (City of Stuart) — 1 ERC, inside city
    City of Stuart Utilities
    City of Stuart water availability fee, charged per ERC for each new connection to the city water system: $1,933 per ERC inside the city and $2,416 per ERC outside. One ERC equals 250 gallons/day; the ERC count comes from the Code's flow table by use, so the total scales with the use's design flow. Paid before the building permit is issued.
    $1,933.00 one-time
Sewer$2,092.00 one-time
  • Sewer Availability Fee (City of Stuart) — 1 ERC, inside city
    City of Stuart Utilities
    City of Stuart sewer availability fee, charged per ERC for each new connection to the city sewer system: $2,092 per ERC inside the city and $2,615 per ERC outside. One ERC equals 200 gallons/day of water use; the ERC count comes from the Code's flow table by use and is rounded up to the nearest 0.1 ERC. Paid before the building permit is issued.
    $2,092.00 one-timeRequires confirmation
City$0.48/sq ft
  • City Impact Fee (City of Stuart, Industrial)
    City of Stuart
    Effective for permits in 2026 and later; this is the terminal rate with no further scheduled increases. Charged per 1,000 sq ft of gross floor area. A 3% administrative fee may be added. Assessed on the net increase over the prior use of the site.
    $0.48/sq ft
County$0.00
  • County Impact Fee (Martin County - Stuart, Industrial)
    Martin County Board of County Commissioners
    The City of Stuart levies its own impact fees for parks, multimodal transportation and public safety. Martin County's impact fee ordinance reaches incorporated areas to the extent permitted by the Florida Constitution, so county components the City does not levy may also apply.
    Requires confirmation
Total (Stuart): $0.48/sq ft + $4,025.00 one-time (≈ $27,875.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Stuart Utilities City of Stuart Martin County Board of County Commissioners
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Martin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Stuart: Office Impact Fees

Office development in Stuart pays $1.53 per square foot in impact fees, plus $4,025.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 25,000 sq ft building, that comes to at least $42,350.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Availability Fee (City of Stuart) — 1 ERC, inside city ($1,933.00 one-time) and City Impact Fee (City of Stuart, Office) ($1.53/sq ft).

Sewer Availability Fee (City of Stuart) — 1 ERC, inside city is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

County Impact Fee (Martin County - Stuart, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Stuart Impact Fee Schedule
Water$1,933.00 one-time
  • Water Availability Fee (City of Stuart) — 1 ERC, inside city
    City of Stuart Utilities
    City of Stuart water availability fee, charged per ERC for each new connection to the city water system: $1,933 per ERC inside the city and $2,416 per ERC outside. One ERC equals 250 gallons/day; the ERC count comes from the Code's flow table by use, so the total scales with the use's design flow. Paid before the building permit is issued.
    $1,933.00 one-time
Sewer$2,092.00 one-time
  • Sewer Availability Fee (City of Stuart) — 1 ERC, inside city
    City of Stuart Utilities
    City of Stuart sewer availability fee, charged per ERC for each new connection to the city sewer system: $2,092 per ERC inside the city and $2,615 per ERC outside. One ERC equals 200 gallons/day of water use; the ERC count comes from the Code's flow table by use and is rounded up to the nearest 0.1 ERC. Paid before the building permit is issued.
    $2,092.00 one-timeRequires confirmation
City$1.53/sq ft
  • City Impact Fee (City of Stuart, Office)
    City of Stuart
    Effective for permits in 2026 and later; this is the terminal rate with no further scheduled increases. Charged per 1,000 sq ft of gross floor area. A 3% administrative fee may be added. Assessed on the net increase over the prior use of the site.
    $1.53/sq ft
County$0.00
  • County Impact Fee (Martin County - Stuart, Office)
    Martin County Board of County Commissioners
    The City of Stuart levies its own impact fees for parks, multimodal transportation and public safety. Martin County's impact fee ordinance reaches incorporated areas to the extent permitted by the Florida Constitution, so county components the City does not levy may also apply.
    Requires confirmation
Total (Stuart): $1.53/sq ft + $4,025.00 one-time (≈ $42,350.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Stuart Utilities City of Stuart Martin County Board of County Commissioners
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Martin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Stuart Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Stuart Impact Fee FAQs

What are the total impact fees for a single-family home in Stuart, Florida?

A new single-family home in Stuart pays at least $13,075.99 per unit in combined impact fees (rates sourced October 21, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Stuart?

Commercial development in Stuart pays $2.87 per square foot in impact fees, plus $4,025.00 in one-time water and sewer connection fees, at least $147,675.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Stuart charge its own impact fees?

Yes. Stuart levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Stuart, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Martin County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000