Callahan applies its own fee schedule. Nassau County does not currently add county-level impact fees inside city limits. A new single-family home pays $6,300.00 per unit (rates sourced ). The full breakdown is below.

Callahan impact fees by project type

Callahan: Single-Family Impact Fees

A new single-family home in Callahan pays $6,300.00 per unit in impact fees (rates sourced August 5, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Municipal Impact Fee (Town of Callahan) ($3,700.00), Water Connection Charge (Town of Callahan) ($1,300.00) and Sewer (Wastewater) Connection Charge (Town of Callahan) ($1,300.00).

View the full Callahan impact fee schedule
Water$1,300.00
  • Water Connection Charge (Town of Callahan)
    Town of Callahan
    Town of Callahan water connection charge: $1,300 per connection inside town limits (a minimum — actual cost applies if higher); $1,950 outside town limits. Charged per connection, not per dwelling unit. Set by Town Code §190-3, Ordinance 2019-O04.
    $1,300.00
Sewer$1,300.00
  • Sewer (Wastewater) Connection Charge (Town of Callahan)
    Town of Callahan
    Town of Callahan sewer (wastewater) connection charge: $1,300 per connection inside town limits (a minimum — actual cost applies if higher); $1,950 outside town limits. Charged per connection, not per dwelling unit. Set by Town Code §190-3, Ordinance 2019-O04.
    $1,300.00
City$3,700.00
  • Municipal Impact Fee (Town of Callahan)
    Town of Callahan
    The Town of Callahan does levy its own new development impact fee. A new home inside the town limits pays $3,700 per dwelling unit, made up of $3,000 for water and wastewater infrastructure, $200 for streets and $500 for parks and recreational infrastructure. New residential development served by the town but located outside the town limits pays $4,500 per unit instead. The fee is due before the building permit is issued, is refundable less an administrative charge if the permit expires without construction, and is separate from the town's water and wastewater connection charges.
    $3,700.00
County$0.00
  • Callahan — No Nassau County Impact Fees
    Nassau County Board of County Commissioners
    The Town of Callahan does not collect Nassau County impact fees (including the mobility fee). Per the county, Callahan and Hilliard collect no county impact fees and are not required to.
    $0.00
Total (Callahan): $6,300.00
Sources last checked Official fee schedules:Town of Callahan Nassau County Board of County Commissioners

Where in Nassau County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Callahan: Multifamily Impact Fees

A new multifamily unit in Callahan pays $3,700.00 per unit in impact fees (rates sourced August 5, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Municipal Impact Fee (Town of Callahan, MF) ($3,700.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Callahan impact fee schedule
Water$0.00
  • Water Connection Charge (Town of Callahan, MF)
    Per connection (not per unit)
    Town of Callahan
    The Town of Callahan sets its water connection charge per service connection rather than per dwelling unit, so there is no published per-unit multifamily water connection fee. The minimum charge is $1,300.00 for each water connection inside the town limits and $1,950.00 outside them, with any cost above the minimum billed at actual cost and lines larger than two inches charged at actual cost in addition. Treatment capacity may also be reserved in advance at $1 per 300 gallons.
    $0.00
Sewer$0.00
  • Sewer (Wastewater) Connection Charge (Town of Callahan, MF)
    Per connection (not per unit)
    Town of Callahan
    The Town of Callahan sets its wastewater connection charge per service connection rather than per dwelling unit, so there is no published per-unit multifamily sewer connection fee. The minimum charge is $1,300.00 for each wastewater connection inside the town limits and $1,950.00 outside them, with any cost above the minimum billed at actual cost. Wastewater treatment capacity may also be reserved in advance at $1 per 300 gallons.
    $0.00
City$3,700.00
  • Municipal Impact Fee (Town of Callahan, MF)
    Per unit
    Town of Callahan
    The Town of Callahan does levy its own new development impact fee, and it is charged per dwelling unit. Multiple dwellings within a single structure are counted as multiple units, so each apartment in a multifamily building is assessed the full residential fee of $3,700 inside the town limits, made up of $3,000 for water and wastewater infrastructure, $200 for streets and $500 for parks and recreational infrastructure. Residential development served by the town but located outside the town limits pays $4,500 per unit. The fee does not vary with unit size and is due before the building permit is issued.
    $3,700.00
County$0.00
  • Callahan — No Nassau County Impact Fees — MF
    Per unit
    Nassau County Board of County Commissioners
    The Town of Callahan does not collect Nassau County impact fees (including the mobility fee). Per the county, Callahan and Hilliard collect no county impact fees and are not required to.
    $0.00
Total (Callahan): $3,700.00
Sources last checked Official fee schedules:Town of Callahan Nassau County Board of County Commissioners

Where in Nassau County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Callahan: Commercial Impact Fees

Commercial development in Callahan pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (Town of Callahan) ($1,300.00 one-time) and Sewer (Wastewater) Connection Charge (Town of Callahan) ($1,300.00 one-time).

View the full Callahan impact fee schedule
Water$1,300.00 one-time
  • Water Connection Charge (Town of Callahan)
    Town of Callahan
    Minimum charge per water connection inside town limits ($1,950 outside); the actual cost applies where a connection is more expensive. One schedule covers all customer classes.
    $1,300.00 one-time
Sewer$1,300.00 one-time
Total (Callahan): $2,600.00 one-time (≈ $2,600.00 at 50,000 sq ft)
Sources last checked Official fee schedule:Town of Callahan

Where in Nassau County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Callahan: Industrial Impact Fees

Industrial development in Callahan pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (Town of Callahan) ($1,300.00 one-time) and Sewer (Wastewater) Connection Charge (Town of Callahan) ($1,300.00 one-time).

View the full Callahan impact fee schedule
Water$1,300.00 one-time
  • Water Connection Charge (Town of Callahan)
    Town of Callahan
    Minimum charge per water connection inside town limits ($1,950 outside); the actual cost applies where a connection is more expensive. One schedule covers all customer classes.
    $1,300.00 one-time
Sewer$1,300.00 one-time
Total (Callahan): $2,600.00 one-time (≈ $2,600.00 at 50,000 sq ft)
Sources last checked Official fee schedule:Town of Callahan

Where in Nassau County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Callahan: Office Impact Fees

Office development in Callahan pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).

For a 25,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (Town of Callahan) ($1,300.00 one-time) and Sewer (Wastewater) Connection Charge (Town of Callahan) ($1,300.00 one-time).

View the full Callahan impact fee schedule
Water$1,300.00 one-time
  • Water Connection Charge (Town of Callahan)
    Town of Callahan
    Minimum charge per water connection inside town limits ($1,950 outside); the actual cost applies where a connection is more expensive. One schedule covers all customer classes.
    $1,300.00 one-time
Sewer$1,300.00 one-time
Total (Callahan): $2,600.00 one-time (≈ $2,600.00 at 25,000 sq ft)
Sources last checked Official fee schedule:Town of Callahan

Where in Nassau County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Callahan impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Callahan impact fee FAQs

What are the total impact fees for a single-family home in Callahan, Florida?

A new single-family home in Callahan pays $6,300.00 per unit in combined impact fees (rates sourced August 5, 2026).

How much are commercial impact fees in Callahan?

Commercial development in Callahan pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees.

Does Callahan charge its own impact fees?

Yes. Callahan levies its own municipal impact or utility fees. Nassau County does not currently add county-level impact fees inside Callahan. The schedule on this page shows every fee that applies to development in Callahan.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Nassau County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000