IMPACTFEES.ORG

Callahan, Florida Impact Fees

Callahan applies its own fee schedule. Nassau County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $2,600.00 per unit (rates sourced July 17, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Callahan impact fees by project type

Callahan: Single-Family Impact Fees

A new single-family home in Callahan pays at least $2,600.00 per unit in impact fees (rates sourced July 17, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Charge (Town of Callahan) ($1,300.00) and Sewer (Wastewater) Connection Charge (Town of Callahan) ($1,300.00).

Municipal Impact Fee (Town of Callahan) — none identified is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,300.00
  • Water Connection Charge (Town of Callahan)
    Town of Callahan
    $1,300.00 per water connection inside Town limits — CONFIRMED 7/13/2026. Source: Town of Callahan Code Ch. 190 (Water and Sewers), Art. II (Connection Charges), § 190-3(A), adopted 6-17-2019 by Ord. No. 2019-O04. The Town makes the water main connection, service line and meter installation within public ROW/easements 'at a minimum cost to the customer of $1,300 for each water connection'. OUTSIDE Town limits the fee is $1,625 plus a $325 surcharge = $1,950 total. The charge is a MINIMUM: if the connection costs more due to site characteristics or distance from existing lines, the actual cost is charged. Prior audits had this at $0 ‘not published online’ — in fact the Town posts its full code book chapter-by-chapter at townofcallahan-fl.gov/code. Basis is PER CONNECTION, not per dwelling unit. Contact: 904-879-3801 ext. 201 / water@townofcallahan-fl.gov.
    $1,300.00
Sewer$1,300.00
  • Sewer (Wastewater) Connection Charge (Town of Callahan)
    Town of Callahan
    $1,300.00 per wastewater connection inside Town limits — CONFIRMED 7/13/2026. Source: Town of Callahan Code Ch. 190 (Water and Sewers), Art. II, § 190-3(A), Ord. No. 2019-O04 (6-17-2019): '$1,300 for each water connection and $1,300 for each wastewater connection within the Town's limits.' OUTSIDE Town limits: $1,625 + $325 surcharge = $1,950. Stated as a MINIMUM cost — actual cost applies if the connection is more expensive due to site conditions or distance. Basis is per CONNECTION, not per dwelling unit. Contact 904-879-3801 ext. 201.
    $1,300.00
City$0.00
  • Municipal Impact Fee (Town of Callahan) — none identified
    Town of Callahan
    $0 — UNCONFIRMED. AUDIT 7/13/2026: walked the Town's full posted code book (townofcallahan-fl.gov/code). There is no impact-fee chapter; Ch. 73 (Building Construction), Ch. 160 (Subdivision of Land) and Ch. 195 (Zoning) carry no development impact fee. The Town's one-time development charges are the water and sewer connection charges in Ch. 190 §190-3 ($1,300 each, in-town). CORRECTION to a prior note: it cited '§25-43 utility impact fees' — Callahan Ch. 25 is Code Enforcement, so that citation was wrong. OPEN: Ch. 102 (Fees) is posted only as a scanned image PDF (SKM_C450i23080308190.pdf) with no text layer and would not render through the Google Docs viewer — it may contain a municipal fee schedule. Re-attempt, or request from the Clerk: clerk@townofcallahan-fl.gov / 904-879-3801 ext. 203. Separately CONFIRMED: Callahan collects NO Nassau County impact fees.
    Requires confirmation
County$0.00
  • Callahan — No Nassau County Impact Fees
    Nassau County Board of County Commissioners
    Callahan does not collect any Nassau County impact fees (including mobility). Per nassaucountyfl.com/1494/Impact-Fees: 'Callahan and Hilliard do not collect any County impact fees and are not required to in the future.'
    $0.00
Total (Callahan): $2,600.00
Sources last checked July 17, 2026Official fee schedules:Town of Callahan Nassau County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Nassau County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Callahan: Multifamily Impact Fees

Callahan has no published impact fee amounts for a new multifamily unit (rates sourced July 17, 2026). The schedule below documents the status of each fee.

Sewer (Wastewater) Connection Charge (Town of Callahan, MF) and Water Connection Charge (Town of Callahan, MF) are set by the utility and not published online. Municipal Impact Fee (Town of Callahan, MF) — none identified is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Charge (Town of Callahan, MF)
    Town of Callahan
    $0 — UNCONFIRMED per-unit basis. AUDIT 7/13/2026: Callahan's water connection charge IS codified — Code Ch. 190 (Water and Sewers), Art. II, §190-3(A), Ord. No. 2019-O04: $1,300 for EACH WATER CONNECTION inside Town limits ($1,625 + $325 surcharge = $1,950 outside). The charge is per CONNECTION, not per dwelling unit, and §190-3 contains no multifamily/per-unit clause, so the SFR $1,300 is not copied onto this MF row. Confirm whether each MF unit requires a separate connection (and therefore a separate $1,300) with the Town: 904-879-3801 ext. 201 / water@townofcallahan-fl.gov.
    Requires confirmation
Sewer$0.00
  • Sewer (Wastewater) Connection Charge (Town of Callahan, MF)
    Town of Callahan
    $0 — UNCONFIRMED per-unit basis. AUDIT 7/13/2026: codified at Callahan Code Ch. 190, Art. II, §190-3(A) (Ord. 2019-O04) — $1,300 for EACH WASTEWATER CONNECTION inside Town limits ($1,950 outside). Per connection, not per dwelling unit; no MF/per-unit clause in the chapter, so the SFR figure is not copied here. Confirm the MF basis with the Town: 904-879-3801 ext. 201.
    Requires confirmation
City$0.00
  • Municipal Impact Fee (Town of Callahan, MF) — none identified
    Town of Callahan
    $0 — UNCONFIRMED. AUDIT 7/13/2026: walked the Town's full posted code book. No impact-fee chapter; Ch. 73 (Building Construction), Ch. 160 (Subdivision) and Ch. 195 (Zoning) carry none. The Town's one-time development charges are the Ch. 190 §190-3 water/sewer connection charges. OPEN: Ch. 102 (Fees) is posted only as a scanned image PDF with no text layer and could not be rendered — it may hold a municipal fee schedule. Request from the Clerk: clerk@townofcallahan-fl.gov / 904-879-3801 ext. 203. Separately CONFIRMED: Callahan collects no Nassau County impact fees.
    Requires confirmation
County$0.00
  • Callahan — No Nassau County Impact Fees — MF
    Nassau County Board of County Commissioners
    Callahan does not collect any Nassau County impact fees (including mobility). Per nassaucountyfl.com/1494/Impact-Fees: 'Callahan and Hilliard do not collect any County impact fees and are not required to in the future.'
    $0.00
Total (Callahan): $0.00
Sources last checked July 17, 2026Official fee schedules:Town of Callahan Nassau County Board of County Commissioners
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Nassau County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Callahan: Commercial Impact Fees

Commercial development in Callahan pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (Town of Callahan) ($1,300.00 one-time) and Sewer (Wastewater) Connection Charge (Town of Callahan) ($1,300.00 one-time).

View the full fee schedule
Water$1,300.00 one-time
  • Water Connection Charge (Town of Callahan)
    Town of Callahan
    Town of Callahan Code Ch. 190 Art. II §190-3(A), Ord. 2019-O04 (6-17-2019): $1,300 minimum per water connection inside town limits ($1,625 + $325 surcharge = $1,950 outside). Charged PER CONNECTION (not per dwelling), one shared schedule for all customer classes so nonres = $1,300. Stated as a MINIMUM — actual cost applies if the connection is more expensive due to site/distance. Confirmed. Contact 904-879-3801 ext. 201.
    $1,300.00 one-time
Sewer$1,300.00 one-time
  • Sewer (Wastewater) Connection Charge (Town of Callahan)
    Town of Callahan
    Town of Callahan Code Ch. 190 Art. II §190-3(A), Ord. 2019-O04 (6-17-2019): '$1,300 for each wastewater connection' inside town limits ($1,950 outside). Per CONNECTION (not per dwelling), one shared schedule for all customer classes so nonres = $1,300. Stated as a minimum — actual cost applies if more expensive. Confirmed. Contact 904-879-3801 ext. 201.
    $1,300.00 one-time
City$0.00
  • Municipal Impact Fee (Town of Callahan, Commercial) — none
    Town of Callahan
    $0 CONFIRMED — Callahan levies no municipal impact fees (none in Town Code; residential pass confirmed 'none identified'). Per Nassau County's Impact Fees page, Callahan collects NO county impact fees and is not required to. Town water/sewer connection charges are in the W/S table.
    $0.00
Total (Callahan): $2,600.00 one-time (≈ $2,600.00 at 50,000 sq ft)
Sources last checked July 17, 2026Official fee schedule:Town of Callahan

Where in Nassau County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Callahan: Industrial Impact Fees

Industrial development in Callahan pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (Town of Callahan) ($1,300.00 one-time) and Sewer (Wastewater) Connection Charge (Town of Callahan) ($1,300.00 one-time).

View the full fee schedule
Water$1,300.00 one-time
  • Water Connection Charge (Town of Callahan)
    Town of Callahan
    Town of Callahan Code Ch. 190 Art. II §190-3(A), Ord. 2019-O04 (6-17-2019): $1,300 minimum per water connection inside town limits ($1,625 + $325 surcharge = $1,950 outside). Charged PER CONNECTION (not per dwelling), one shared schedule for all customer classes so nonres = $1,300. Stated as a MINIMUM — actual cost applies if the connection is more expensive due to site/distance. Confirmed. Contact 904-879-3801 ext. 201.
    $1,300.00 one-time
Sewer$1,300.00 one-time
  • Sewer (Wastewater) Connection Charge (Town of Callahan)
    Town of Callahan
    Town of Callahan Code Ch. 190 Art. II §190-3(A), Ord. 2019-O04 (6-17-2019): '$1,300 for each wastewater connection' inside town limits ($1,950 outside). Per CONNECTION (not per dwelling), one shared schedule for all customer classes so nonres = $1,300. Stated as a minimum — actual cost applies if more expensive. Confirmed. Contact 904-879-3801 ext. 201.
    $1,300.00 one-time
City$0.00
Total (Callahan): $2,600.00 one-time (≈ $2,600.00 at 50,000 sq ft)
Sources last checked July 17, 2026Official fee schedule:Town of Callahan

Where in Nassau County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Callahan: Office Impact Fees

Office development in Callahan pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to about $2,600.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (Town of Callahan) ($1,300.00 one-time) and Sewer (Wastewater) Connection Charge (Town of Callahan) ($1,300.00 one-time).

View the full fee schedule
Water$1,300.00 one-time
  • Water Connection Charge (Town of Callahan)
    Town of Callahan
    Town of Callahan Code Ch. 190 Art. II §190-3(A), Ord. 2019-O04 (6-17-2019): $1,300 minimum per water connection inside town limits ($1,625 + $325 surcharge = $1,950 outside). Charged PER CONNECTION (not per dwelling), one shared schedule for all customer classes so nonres = $1,300. Stated as a MINIMUM — actual cost applies if the connection is more expensive due to site/distance. Confirmed. Contact 904-879-3801 ext. 201.
    $1,300.00 one-time
Sewer$1,300.00 one-time
  • Sewer (Wastewater) Connection Charge (Town of Callahan)
    Town of Callahan
    Town of Callahan Code Ch. 190 Art. II §190-3(A), Ord. 2019-O04 (6-17-2019): '$1,300 for each wastewater connection' inside town limits ($1,950 outside). Per CONNECTION (not per dwelling), one shared schedule for all customer classes so nonres = $1,300. Stated as a minimum — actual cost applies if more expensive. Confirmed. Contact 904-879-3801 ext. 201.
    $1,300.00 one-time
City$0.00
Total (Callahan): $2,600.00 one-time (≈ $2,600.00 at 25,000 sq ft)
Sources last checked July 17, 2026Official fee schedule:Town of Callahan

Where in Nassau County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Callahan

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Callahan, Florida?

A new single-family home in Callahan pays at least $2,600.00 per unit in combined impact fees (rates sourced July 17, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Callahan?

Commercial development in Callahan pays no per-square-foot impact fees, but owes $2,600.00 in one-time water and sewer connection fees.

Does Callahan charge its own impact fees?

Yes. Callahan levies its own municipal impact or utility fees. Nassau County does not currently add county-level impact fees inside Callahan. The schedule on this page shows every fee that applies to development in Callahan.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Nassau County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000