Impact fees in Osceola County depend on where you build. This page details the rates for unincorporated Osceola County: $47,660.86 per single-family unit as of . Unincorporated communities such as Buenaventura Lakes and Celebration pay these county rates rather than a city schedule. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Osceola County Impact Fees by Project Type

Where in Osceola County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Unincorporated Osceola County$47,660.86this page
Kissimmee$29,860.95St. Cloud$42,804.14

Unincorporated Osceola County: Single-Family Impact Fees

A new single-family home in unincorporated Osceola County pays $47,660.86 per unit in impact fees (rates sourced July 17, 2026). Of that, Osceola County-levied fees account for $37,717.86 and municipal or utility fees for $9,943.00.

The largest line items are Mobility Fee (Transportation) (Osceola County) ($21,710.14), School Impact Fee (Osceola County School District) ($12,923.00) and Water System Development Charge (SFR - Toho Water Authority) ($6,650.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Osceola County Impact Fee Schedule
Water$6,650.00
  • Water System Development Charge (SFR - Toho Water Authority)
    3/4"
    Toho Water Authority
    Toho Water Authority water system development charge, single-family (3/4" meter): $6,650, effective May 5, 2025. Adopted steps: $7,336 on January 1, 2027 and $8,022 on January 1, 2028. Toho serves developed unincorporated Osceola; rural parcels outside the Toho service area are on private wells (no SDC). Larger meters pay more (1" $11,106; 1.5" $22,145; 2" $35,445).
    $6,650.00
Sewer$3,293.00
  • Wastewater System Development Charge (SFR - Toho Water Authority)
    3/4"
    Toho Water Authority
    Toho Water Authority wastewater system development charge, single-family (3/4" meter): $3,293, effective May 5, 2025. Toho serves developed unincorporated Osceola; rural parcels outside the Toho service area are on private septic (no SDC). Larger meters pay more (1" $5,499; 1.5" $10,966; 2" $17,552).
    $3,293.00
City$0.00
  • Municipal Impact Fees (Osceola County - Unincorporated)
    Osceola County
    Unincorporated Osceola County has no municipal government, so no city-level impact fee applies. Development in the unincorporated area pays the county overlay fees (Mobility, School, Park, Fire) and Toho water/sewer SDCs, which are recorded separately.
    $0.00
County$37,717.86
  • Mobility Fee (Transportation) (Osceola County)
    Standard Area
    Osceola County
    Osceola County mobility fee (unincorporated), single-family: $21,710.14 per unit in the Standard Area, the highest of 4 rate districts, rates effective June 20, 2025. Lower Comp-Plan area rates: East of Lake Toho $20,653.74; South Lake Toho $20,013.76; Alligator Chain of Lakes $21,347.00. Applies in the unincorporated area only. A separate county administrative fee is charged on top.
    $21,710.14
  • School Impact Fee (Osceola County School District)
    Osceola County School District
    Osceola County School District educational impact fee, single-family detached: $12,923 per unit, effective June 20, 2025 (unchanged from FY25). Applies countywide. Other categories: townhouse $8,262; mobile home $8,740.
    $12,923.00
  • Park Impact Fee (Osceola County)
    Osceola County
    Osceola County park impact fee (unincorporated), single-family or townhouse: $2,304.72 per unit, rates effective June 20, 2025 and unchanged on the FY2027 schedule. Mobile home $1,689.66; multifamily $1,117.97. Rates are subject to an annual CPI index resolution adopted before July 1. A separate county administrative fee is charged on top.
    $2,304.72
  • Fire/Rescue Impact Fee (Osceola County)
    Osceola County
    Osceola County fire/rescue impact fee (unincorporated), single-family or mobile home: $780 per unit, rates effective June 20, 2025 and unchanged on the FY2027 schedule. Multi-family and townhouse rate is $303. A separate county administrative fee is charged on top.
    $780.00
Total (unincorporated Osceola County): $47,660.86
Sources last checked Official fee schedules:Toho Water Authority Osceola County Osceola County School District

Where in Osceola County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Unincorporated Osceola County$32,958.81this page
Kissimmee$22,904.62St. Cloud$31,883.81

Unincorporated Osceola County: Multifamily Impact Fees

A new multifamily unit in unincorporated Osceola County pays $32,958.81 per unit in impact fees (rates sourced July 17, 2026). Of that, Osceola County-levied fees account for $27,625.81 and municipal or utility fees for $5,333.00.

The largest line items are Mobility Fee (Transportation) (Osceola County, MF) ($14,039.84), School Impact Fee (Osceola County School District, MF Rental) ($12,165.00) and Water System Development Charge (Toho Water Authority, MF) ($3,128.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Osceola County Impact Fee Schedule
Water$3,128.00
  • Water System Development Charge (Toho Water Authority, MF)
    2 BR (751-1,200 sf)
    Toho Water Authority
    Toho Water Authority water system development charge, multifamily. Assessed per unit by bedroom count; the canonical 2-bedroom unit is $3,128 (effective May 5, 2025). Other sizes: 1BR $1,564; 3BR $4,692; 4BR $6,256. The per-gallon rate steps from $19.55 to $21.57 on January 1, 2027 and $23.59 on January 1, 2028. Toho serves developed unincorporated Osceola; rural parcels outside the service area are on private wells (no SDC).
    $3,128.00
Sewer$2,205.00
  • Wastewater System Development Charge (Toho Water Authority, MF)
    2 BR (751-1,200 sf)
    Toho Water Authority
    Toho Water Authority wastewater system development charge, multifamily. Assessed per unit by bedroom count; the canonical 2-bedroom unit is $2,205 (effective May 5, 2025). Other sizes: 1BR $1,103; 3BR $3,308; 4BR $4,410. Toho serves developed unincorporated Osceola; rural parcels outside the service area are on septic (no SDC).
    $2,205.00
City$0.00
  • Municipal Impact Fees (Osceola County - Unincorporated, MF)
    Osceola County
    Unincorporated Osceola County has no municipal government, so no city-level impact fee applies. Multifamily development in the unincorporated area pays the county overlay fees (Mobility, School, Park, Fire) and Toho water/sewer SDCs, which are recorded separately.
    $0.00
County$27,625.81
  • Mobility Fee (Transportation) (Osceola County, MF)
    Standard Area
    Osceola County
    Osceola County mobility fee (unincorporated), multifamily: $14,039.84 per unit in the Standard Area, the highest of 4 rate districts, rates effective June 20, 2025. Lower Comp-Plan area rates: East of Lake Toho $13,356.67; South Lake Toho $12,942.80; Alligator Chain of Lakes $13,805.00. Rental and condo carry the same rate. Applies in the unincorporated area only. A separate county administrative fee is charged on top.
    $14,039.84
  • School Impact Fee (Osceola County School District, MF Rental)
    Multifamily Rental
    Osceola County School District
    Osceola County School District educational impact fee, multifamily rental: $12,165 per unit, effective June 20, 2025. Applies countywide. Condominium rate $4,702; townhouse $8,262.
    $12,165.00
  • Park Impact Fee (Osceola County, MF)
    Osceola County
    Osceola County park impact fee (unincorporated), multifamily: $1,117.97 per unit (rental and condo), rates effective June 20, 2025 and unchanged on the FY2027 schedule. Rates are subject to an annual CPI index resolution adopted before July 1. A separate county administrative fee is charged on top.
    $1,117.97
  • Fire/Rescue Impact Fee (Osceola County, MF)
    Osceola County
    Osceola County fire/rescue impact fee (unincorporated), multifamily: $303 per unit (rental, condo and townhouse), rates effective June 20, 2025 and unchanged on the FY2027 schedule. A separate county administrative fee is charged on top.
    $303.00
Total (unincorporated Osceola County): $32,958.81
Sources last checked Official fee schedules:Toho Water Authority Osceola County Osceola County School District

Where in Osceola County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Osceola County$1,278,718.50this page
Kissimmee$64,855.00Includes unconfirmed feesSt. Cloud$969,366.22

Unincorporated Osceola County: Commercial Impact Fees

Commercial development in unincorporated Osceola County pays $25.24 per square foot in impact fees, plus $16,605.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to about $1,278,718.50. The calculator below adjusts to your exact square footage.

The largest line items are Water System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter ($11,106.00 one-time), Wastewater System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter ($5,499.00 one-time) and Mobility Fee (Transportation) (Osceola County, Commercial) ($24.60/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Osceola County Impact Fee Schedule
Water$11,106.00 one-time
  • Water System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter
    Toho Water Authority
    Toho Water Authority water system development charge, Res. 2025-001, effective May 5, 2025. Set by water meter size; connections above 2" require a Toho engineering water-usage analysis. Adopted step: $12,251 on January 1, 2027, with a further step on January 1, 2028. Celebration (Enterprise CDD) and Harmony (Harmony CDD) are served by their own districts; rural parcels outside Toho's service area use a private well (no charge).
    $11,106.00 one-time
Sewer$5,499.00 one-time
  • Wastewater System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter
    Toho Water Authority
    Toho Water Authority wastewater system development charge, Res. 2025-001, effective May 5, 2025. Set by water meter size; connections above 2" require a Toho engineering water-usage analysis. Wastewater charges do not change in the adopted 2027 and 2028 steps. Celebration (Enterprise CDD) and Harmony (Harmony CDD) are served by their own districts; rural parcels outside Toho's sewer service area use a septic system (no charge).
    $5,499.00 one-time
City$0.00
County$25.24/sq ft
  • Mobility Fee (Transportation) (Osceola County, Commercial)
    All Other Areas
    Osceola County
    Osceola County mobility (transportation) fee, Ord. 2024-26 (adopted September 12, 2024), charged per 1,000 sq ft. Rates effective June 19, 2025, unchanged on the FY2027 rate sheet. Applies only in the unincorporated county. Rate shown is All Other Areas, the highest of four mobility rate areas; the East of Lake Toho, South Lake Toho and Alligator Lake CMP areas are lower (see other tiers).
    $24.60/sq ft
  • Fire/Rescue Impact Fee (Osceola County, Commercial)
    Osceola County
    Osceola County fire rescue impact fee, Ord. 2024-23 (adopted August 5, 2024), charged per 1,000 sq ft; countywide rate, not area-varying. Rates effective June 19, 2025, unchanged on the FY2027 rate sheet. Applies in the unincorporated county.
    $0.64/sq ft
Total (unincorporated Osceola County): $25.24/sq ft + $16,605.00 one-time (≈ $1,278,718.50 at 50,000 sq ft)
Sources last checked Official fee schedules:Toho Water Authority Osceola County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Osceola County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Osceola County$76,734.00this page
Kissimmee$108,605.00Includes unconfirmed feesSt. Cloud$71,126.22

Unincorporated Osceola County: Industrial Impact Fees

Industrial development in unincorporated Osceola County pays $1.20 per square foot in impact fees, plus $16,605.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to about $76,734.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter ($11,106.00 one-time), Wastewater System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter ($5,499.00 one-time) and Mobility Fee (Transportation) (Osceola County, Industrial) ($1.13/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Osceola County Impact Fee Schedule
Water$11,106.00 one-time
  • Water System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter
    Toho Water Authority
    Toho Water Authority water system development charge, Res. 2025-001, effective May 5, 2025. Set by water meter size; connections above 2" require a Toho engineering water-usage analysis. Adopted step: $12,251 on January 1, 2027, with a further step on January 1, 2028. Celebration (Enterprise CDD) and Harmony (Harmony CDD) are served by their own districts; rural parcels outside Toho's service area use a private well (no charge).
    $11,106.00 one-time
Sewer$5,499.00 one-time
  • Wastewater System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter
    Toho Water Authority
    Toho Water Authority wastewater system development charge, Res. 2025-001, effective May 5, 2025. Set by water meter size; connections above 2" require a Toho engineering water-usage analysis. Wastewater charges do not change in the adopted 2027 and 2028 steps. Celebration (Enterprise CDD) and Harmony (Harmony CDD) are served by their own districts; rural parcels outside Toho's sewer service area use a septic system (no charge).
    $5,499.00 one-time
City$0.00
County$1.20/sq ft
  • Mobility Fee (Transportation) (Osceola County, Industrial)
    Osceola County
    Osceola County mobility (transportation) fee, Ord. 2024-26 (adopted September 12, 2024), charged per 1,000 sq ft. Rates effective June 19, 2025, unchanged on the FY2027 rate sheet. Applies only in the unincorporated county. The industrial rate is the same in all four mobility areas.
    $1.13/sq ft
  • Fire/Rescue Impact Fee (Osceola County, Industrial)
    Osceola County
    Osceola County fire rescue impact fee, Ord. 2024-23 (adopted August 5, 2024), charged per 1,000 sq ft; countywide rate, not area-varying. Rates effective June 19, 2025, unchanged on the FY2027 rate sheet. Applies in the unincorporated county.
    $0.07/sq ft
Total (unincorporated Osceola County): $1.20/sq ft + $16,605.00 one-time (≈ $76,734.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Toho Water Authority Osceola County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Osceola County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Osceola County$278,354.00this page
Kissimmee$27,130.00Includes unconfirmed feesSt. Cloud$253,129.72

Unincorporated Osceola County: Office Impact Fees

Office development in unincorporated Osceola County pays $10.47 per square foot in impact fees, plus $16,605.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to about $278,354.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter ($11,106.00 one-time), Wastewater System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter ($5,499.00 one-time) and Mobility Fee (Transportation) (Osceola County, Office) ($10.06/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Osceola County Impact Fee Schedule
Water$11,106.00 one-time
  • Water System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter
    Toho Water Authority
    Toho Water Authority water system development charge, Res. 2025-001, effective May 5, 2025. Set by water meter size; connections above 2" require a Toho engineering water-usage analysis. Adopted step: $12,251 on January 1, 2027, with a further step on January 1, 2028. Celebration (Enterprise CDD) and Harmony (Harmony CDD) are served by their own districts; rural parcels outside Toho's service area use a private well (no charge).
    $11,106.00 one-time
Sewer$5,499.00 one-time
  • Wastewater System Development Charge (Toho Water Authority, Unincorporated Osceola) — 1" meter
    Toho Water Authority
    Toho Water Authority wastewater system development charge, Res. 2025-001, effective May 5, 2025. Set by water meter size; connections above 2" require a Toho engineering water-usage analysis. Wastewater charges do not change in the adopted 2027 and 2028 steps. Celebration (Enterprise CDD) and Harmony (Harmony CDD) are served by their own districts; rural parcels outside Toho's sewer service area use a septic system (no charge).
    $5,499.00 one-time
City$0.00
County$10.47/sq ft
  • Mobility Fee (Transportation) (Osceola County, Office)
    All Other Areas
    Osceola County
    Osceola County mobility (transportation) fee, Ord. 2024-26 (adopted September 12, 2024), charged per 1,000 sq ft. Rates effective June 19, 2025, unchanged on the FY2027 rate sheet. Applies only in the unincorporated county. Rate shown is All Other Areas, the highest of four mobility rate areas; the East of Lake Toho, South Lake Toho and Alligator Lake CMP areas are lower (see other tiers).
    $10.06/sq ft
  • Fire/Rescue Impact Fee (Osceola County, Office)
    Osceola County
    Osceola County fire rescue impact fee, Ord. 2024-23 (adopted August 5, 2024), charged per 1,000 sq ft; countywide rate, not area-varying. Rates effective June 19, 2025, unchanged on the FY2027 rate sheet. Applies in the unincorporated county.
    $0.41/sq ft
Total (unincorporated Osceola County): $10.47/sq ft + $16,605.00 one-time (≈ $278,354.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Toho Water Authority Osceola County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Osceola County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Osceola County Impact Fee FAQs

What are single-family impact fees in Osceola County, Florida?

A new single-family home in unincorporated Osceola County pays $47,660.86 per unit in impact fees (rates sourced July 17, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Osceola County?

Multifamily development in unincorporated Osceola County pays $32,958.81 per unit in impact fees (rates sourced July 17, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Osceola County?

Commercial development in unincorporated Osceola County pays $25.24 per square foot in impact fees, plus $16,605.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $1,278,718.50 for a 50,000 sq ft building.

Do Buenaventura Lakes and Celebration pay Osceola County impact fees?

Yes. Buenaventura Lakes and Celebration are unincorporated, so new construction there pays the unincorporated Osceola County schedule on this page, not a city schedule. Search a specific address in the calculator below to confirm it sits outside every city limit.

Does Poinciana pay Osceola County impact fees?

Only in part. Poinciana spans Osceola and Polk counties, so the fee depends on which jurisdiction a parcel is in. Search the address in the calculator below to see the schedule that applies.

See also: Polk County Impact Fees.

Do cities in Osceola County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 2 of 2 cities in Osceola County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000