St. Cloud impact fees by project type
St. Cloud: Single-Family Impact Fees
A new single-family home in St. Cloud pays $42,804.14 per unit in impact fees (rates sourced July 17, 2026). Of that, Osceola County-levied fees account for $12,923.00 and municipal or utility fees for $29,881.14.
The largest line items are Mobility Fee (City of St. Cloud) ($14,501.18), School Impact Fee (Osceola County School District) ($12,923.00) and Water System Development Charge (SFR - Toho Water Authority) ($6,650.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water System Development Charge (SFR - Toho Water Authority)$6,650.00Toho Water AuthorityToho SDC, eff May 5, 2025. Toho unified with St. Cloud utility (Oct 2021) and applies uniform rates. SF 3/4" meter = 340 gpd × $19.55 = $6,650.
- Wastewater System Development Charge (SFR - Toho Water Authority)$3,293.00Toho Water AuthorityToho SDC, eff May 5, 2025. St. Cloud on Toho uniform rates. SF 3/4" meter = 221 gpd × $14.90 = $3,293.
- Mobility Fee (City of St. Cloud)$14,501.18City of St. CloudRe-verified 7/14/2026 against the city's NEW Impact Fee Rate Sheet (eff. 6/18/2025; Mobility Fee Ordinance & Resolution 2024) — rate CONFIRMED, unchanged. ITE 210 Single Family Detached, All Other Areas (default tier). CMP-area rates are lower: East of Lake Toho $13,795.56; South of Lake Toho $13,368.09; Alligator Chain of Lakes $14,258.62. CMP zone for a parcel is determined from the county GIS webmap. Contact: Community Development, 407-957-8427. NOTE: stcloudfl.gov/1698 is JS-rendered — it returns an empty body to plain fetch; render in a browser.
- Parks & Recreation Impact Fee (City of St. Cloud)$2,865.00City of St. CloudSingle-Family Residential, 2023-24 rate. Ord. 2022-61 (eff 1/27/2023), Parks Res. 2017-185R.
- Police (Public Safety) Impact Fee (City of St. Cloud)$1,029.00City of St. CloudSingle-Family Residential, 2023-24 rate. Public Safety Impact Fee Ord. 2022-61 (eff 1/27/2023), Police Res. 2019-225R.
- Fire (Public Safety) Impact Fee (City of St. Cloud)$902.00City of St. CloudSingle-Family Residential, 2023-24 rate. Public Safety Impact Fee Ord. 2022-61 (eff 1/27/2023), Fire Res. 2019-226R.
- Solid Waste Impact Fee (City of St. Cloud)$640.96City of St. CloudSingle-Family Residential (Class I, bin customers), effective 10/1/2025. Res. 2023-213R / 2023-214R.
- School Impact Fee (Osceola County School District)$12,923.00Osceola County School DistrictSingle-Family Detached, countywide educational impact fee, Ord. 2022-61 (eff 3/6/2023). Short-term-rental SF rate $6,034.
Where in Osceola County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
St. Cloud: Multifamily Impact Fees
A new multifamily unit in St. Cloud pays $31,883.81 per unit in impact fees (rates sourced July 17, 2026). Of that, Osceola County-levied fees account for $12,165.00 and municipal or utility fees for $19,718.81.
The largest line items are School Impact Fee (Osceola County School District, MF Rental) ($12,165.00), Mobility Fee (City of St. Cloud, MF) ($9,377.85) and Water System Development Charge (Toho Water Authority, MF) ($3,128.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water System Development Charge (Toho Water Authority, MF)$3,128.00Toho Water AuthorityToho SDC eff May 5, 2025, per unit by bedroom LOS: 1BR $1,564; 2BR $3,128 (default); 3BR $4,692; 4BR $6,256. St. Cloud on Toho uniform rates (unified Oct 2021).
- Wastewater System Development Charge (Toho Water Authority, MF)$2,205.00Toho Water AuthorityToho SDC eff May 5, 2025, per unit by bedroom LOS: 1BR $1,103; 2BR $2,205 (default); 3BR $3,308; 4BR $4,410. St. Cloud on Toho uniform rates.
- Mobility Fee (City of St. Cloud, MF)$9,377.85City of St. CloudRe-verified 7/14/2026 against the city's NEW Impact Fee Rate Sheet (eff. 6/18/2025) — rate CONFIRMED, unchanged. ITE 220 Condo/Multi-Family (Apartments), All Other Areas (default tier). CMP zones lower: East of Lake Toho $8,921.52; South of Lake Toho $8,645.09; Alligator Chain $9,220.99. CMP zone per parcel from the county GIS webmap. Contact 407-957-8427. NOTE: stcloudfl.gov/1698 is JS-rendered — empty body to plain fetch; render in a browser.
- Parks & Recreation Impact Fee (City of St. Cloud, MF)$2,567.00City of St. CloudMulti-Family Residential, 2023-24 rate. Ord. 2022-61 (eff 1/27/2023), Parks Res. 2017-185R.
- Police (Public Safety) Impact Fee (City of St. Cloud, MF)$992.00City of St. CloudMulti-Family Residential, 2023-24 rate. Public Safety Impact Fee Ord. 2022-61 (eff 1/27/2023), Police Res. 2019-225R.
- Fire (Public Safety) Impact Fee (City of St. Cloud, MF)$808.00City of St. CloudMulti-Family Residential, 2023-24 rate. Public Safety Impact Fee Ord. 2022-61 (eff 1/27/2023), Fire Res. 2019-226R.
- Solid Waste Impact Fee (City of St. Cloud, MF)$640.96City of St. CloudMulti-Family Residential (Class IV, bin customers), eff 10/1/2025. Dumpster customers = $6,129.22. Res. 2023-213R / 2023-214R.
- School Impact Fee (Osceola County School District, MF Rental)$12,165.00Osceola County School DistrictMulti-Family Rental (default). Countywide educational impact fee, Ord. 2022-61 (eff 3/6/2023). Condominium rate $4,702; short-term-rental MF $7,534.
Where in Osceola County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
St. Cloud: Commercial Impact Fees
Commercial development in St. Cloud pays $18.93 per square foot in impact fees, plus $17,117.03 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to about $963,749.03. The calculator below adjusts to your exact square footage.
The largest line items are Water System Development Charge (Toho Water Authority, St. Cloud) — 1" meter ($11,106.00 one-time), Wastewater System Development Charge (Toho Water Authority, St. Cloud) — 1" meter ($5,499.00 one-time) and Police (Public Safety) Impact Fee (City of St. Cloud, Commercial) ($1.33/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Solid Waste Impact Fee (City of St. Cloud, Commercial) and Mobility Fee (City of St. Cloud, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water System Development Charge (Toho Water Authority, St. Cloud) — 1" meter$11,106.00 one-timeToho Water AuthorityToho SDC, SDC Resolution 2025 (eff. May 5, 2025). Canonical 1" nonres default. Toho unified with St. Cloud utility Oct 2021. Meters >2" require engineering analysis. 407-944-5000.
- Wastewater System Development Charge (Toho Water Authority, St. Cloud) — 1" meter$5,499.00 one-timeToho Water AuthorityToho SDC, SDC Resolution 2025 (eff. May 5, 2025). Canonical 1" nonres default. St. Cloud unified Oct 2021. 407-944-5000.
- Solid Waste Impact Fee (City of St. Cloud, Commercial)$512.03 one-timeRequires confirmationCity of St. CloudSolid Waste Impact Fee, Ord. 2020-10 / Res. 2023-214R. Nonres = Commercial (Class II & III): bin customers $512.03 (default, entered), dumpster customers $5,618.13. Applies to nonres solid-waste customers generally. Rate sheet (eff. 6/18/2025) notes Solid Waste rates REVISED eff. 10/1/2025 — current amount not captured, Unconfirmed.
- Mobility Fee (City of St. Cloud, Commercial)$16.43/sq ftRequires confirmationCity of St. CloudSt. Cloud Mobility Fee, Res. 2024-176R (eff. 6/18/2025), Appendix B-1, per 1,000 sf. Schedule row: Shopping Center/Grocery Store (ITE 820) = $16,433.64 (default/All Other Areas). CMP-area columns lower & parcel-specific (East of Lake Toho / South Lake Toho / Alligator Chain) — check parcel CMP zone on county GIS; Unconfirmed for CMP-zone parcels.
- Police (Public Safety) Impact Fee (City of St. Cloud, Commercial)$1.33/sq ftCity of St. CloudPublic Safety Impact Fee – Police, Ord. 2022-61 (eff. 1/27/2023), 2023-2024 rate. Schedule 'Non-Residential (per 1,000 sq. ft.)' $1,332 covers Commercial & Office; Industrial/Warehouse has its own $113 row. Rate sheet eff. 6/18/2025.
- Fire (Public Safety) Impact Fee (City of St. Cloud, Commercial)$1.17/sq ftCity of St. CloudPublic Safety Impact Fee – Fire, Ord. 2022-61 (eff. 1/27/2023), 2023-2024 rate. 'Non-Residential (per 1,000 sq. ft.)' $1,167 covers Commercial & Office; Industrial/Warehouse $99 separate row.
- County Impact/Mobility Fees (Osceola County, Commercial)$0.00Osceola CountyCounty nonres overlay = Mobility (Ord. 2024-26) + Fire Rescue (Ord. 2024-23) only. $0 in-city CONFIRMED on audit 2026-07-19: county Mobility fee applies solely to development 'in the unincorporated area of the county' (Code §17-42(a)); county Fire Rescue impact fee is imposed only in the unincorporated area + municipalities that CONSENT (Ch. 24 Art. V). St. Cloud runs its own fire dept and levies its own Fire/Police/Mobility (+ Solid Waste) impact fees, so it has not consented — no county overlay collected in-city.
Where in Osceola County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Cloud: Industrial Impact Fees
Industrial development in St. Cloud pays $0.97 per square foot in impact fees, plus $16,605.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to about $64,997.00. The calculator below adjusts to your exact square footage.
The largest line items are Water System Development Charge (Toho Water Authority, St. Cloud) — 1" meter ($11,106.00 one-time), Wastewater System Development Charge (Toho Water Authority, St. Cloud) — 1" meter ($5,499.00 one-time) and Police (Public Safety) Impact Fee (City of St. Cloud, Industrial) ($0.11/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Mobility Fee (City of St. Cloud, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water System Development Charge (Toho Water Authority, St. Cloud) — 1" meter$11,106.00 one-timeToho Water AuthorityToho SDC, SDC Resolution 2025 (eff. May 5, 2025). Canonical 1" nonres default. Toho unified with St. Cloud utility Oct 2021. Meters >2" require engineering analysis. 407-944-5000.
- Wastewater System Development Charge (Toho Water Authority, St. Cloud) — 1" meter$5,499.00 one-timeToho Water AuthorityToho SDC, SDC Resolution 2025 (eff. May 5, 2025). Canonical 1" nonres default. St. Cloud unified Oct 2021. 407-944-5000.
- Mobility Fee (City of St. Cloud, Industrial)$0.76/sq ftRequires confirmationCity of St. CloudSt. Cloud Mobility Fee, Res. 2024-176R (eff. 6/18/2025), per 1,000 sf. Schedule row: Warehousing/Manufacturing/Industrial (ITE 130/140/150) = $755.84 (default/All Other Areas). CMP-area columns parcel-specific — Unconfirmed for CMP-zone parcels.
- Police (Public Safety) Impact Fee (City of St. Cloud, Industrial)$0.11/sq ftCity of St. CloudPublic Safety Impact Fee – Police, Ord. 2022-61. Schedule row: Industrial/Warehouse (per 1,000 sq. ft.) $113.
- Fire (Public Safety) Impact Fee (City of St. Cloud, Industrial)$0.10/sq ftCity of St. CloudPublic Safety Impact Fee – Fire, Ord. 2022-61. Schedule row: Industrial/Warehouse (per 1,000 sq. ft.) $99.
- County Impact/Mobility Fees (Osceola County, Industrial)$0.00Osceola CountyCounty nonres overlay = Mobility (Ord. 2024-26) + Fire Rescue (Ord. 2024-23) only. $0 in-city CONFIRMED on audit 2026-07-19: county Mobility fee applies solely to development 'in the unincorporated area of the county' (Code §17-42(a)); county Fire Rescue impact fee is imposed only in the unincorporated area + municipalities that CONSENT (Ch. 24 Art. V). St. Cloud runs its own fire dept and levies its own Fire/Police/Mobility (+ Solid Waste) impact fees, so it has not consented — no county overlay collected in-city.
Where in Osceola County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Cloud: Office Impact Fees
Office development in St. Cloud pays $9.22 per square foot in impact fees, plus $16,605.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 25,000 sq ft building, that comes to about $247,000.50. The calculator below adjusts to your exact square footage.
The largest line items are Water System Development Charge (Toho Water Authority, St. Cloud) — 1" meter ($11,106.00 one-time), Wastewater System Development Charge (Toho Water Authority, St. Cloud) — 1" meter ($5,499.00 one-time) and Police (Public Safety) Impact Fee (City of St. Cloud, Office) ($1.33/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Mobility Fee (City of St. Cloud, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water System Development Charge (Toho Water Authority, St. Cloud) — 1" meter$11,106.00 one-timeToho Water AuthorityToho SDC, SDC Resolution 2025 (eff. May 5, 2025). Canonical 1" nonres default. Toho unified with St. Cloud utility Oct 2021. Meters >2" require engineering analysis. 407-944-5000.
- Wastewater System Development Charge (Toho Water Authority, St. Cloud) — 1" meter$5,499.00 one-timeToho Water AuthorityToho SDC, SDC Resolution 2025 (eff. May 5, 2025). Canonical 1" nonres default. St. Cloud unified Oct 2021. 407-944-5000.
- Mobility Fee (City of St. Cloud, Office)$6.72/sq ftRequires confirmationCity of St. CloudSt. Cloud Mobility Fee, Res. 2024-176R (eff. 6/18/2025), per 1,000 sf. Schedule row: Office Space (ITE 710 group) = $6,716.82 (default/All Other Areas). CMP-area columns lower & parcel-specific — Unconfirmed for CMP-zone parcels.
- Police (Public Safety) Impact Fee (City of St. Cloud, Office)$1.33/sq ftCity of St. CloudPublic Safety Impact Fee – Police, Ord. 2022-61 (eff. 1/27/2023). Office uses the single 'Non-Residential (per 1,000 sq. ft.)' $1,332 rate.
- Fire (Public Safety) Impact Fee (City of St. Cloud, Office)$1.17/sq ftCity of St. CloudPublic Safety Impact Fee – Fire, Ord. 2022-61. Office uses the single 'Non-Residential (per 1,000 sq. ft.)' $1,167 rate.
- County Impact/Mobility Fees (Osceola County, Office)$0.00Osceola CountyCounty nonres overlay = Mobility (Ord. 2024-26) + Fire Rescue (Ord. 2024-23) only. $0 in-city CONFIRMED on audit 2026-07-19: county Mobility fee applies solely to development 'in the unincorporated area of the county' (Code §17-42(a)); county Fire Rescue impact fee is imposed only in the unincorporated area + municipalities that CONSENT (Ch. 24 Art. V). St. Cloud runs its own fire dept and levies its own Fire/Police/Mobility (+ Solid Waste) impact fees, so it has not consented — no county overlay collected in-city.
Where in Osceola County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in St. Cloud
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in St. Cloud, Florida?
A new single-family home in St. Cloud pays $42,804.14 per unit in combined impact fees (rates sourced July 17, 2026).
How much are commercial impact fees in St. Cloud?
Commercial development in St. Cloud pays $18.93 per square foot in impact fees, plus $17,117.03 in one-time water and sewer connection fees (assuming a 1-inch meter), about $963,749.03 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does St. Cloud charge its own impact fees?
Yes. St. Cloud levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in St. Cloud, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Osceola County impact fees page.