Cherokee County, South Carolina Impact Fees

Impact fees in Cherokee County depend on where you build. This page details the rates for unincorporated Cherokee County: $11,000.00 per single-family unit as of . Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Cherokee County Impact Fees by Project Type

Where in Cherokee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Unincorporated Cherokee County$11,000.00this page
Blacksburg$7,250.00Gaffney$9,000.00

Unincorporated Cherokee County: Single-Family Impact Fees

A new single-family home in unincorporated Cherokee County pays $11,000.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1.0 ERU × $4,000/ERU ($4,000.00), Sewer Connection Charge (Gaffney Board of Public Works) ($3,000.00) and Water Connection Charge — Gaffney Board of Public Works ($3,000.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Cherokee County Impact Fee Schedule
Water$4,000.00
  • Water Connection Charge — Gaffney Board of Public Works
    Gaffney BPW, 3/4" outside city
    Gaffney Board of Public Works
    Gaffney Board of Public Works is the largest water provider in unincorporated Cherokee County and charges outside-city rates there; several rural water systems serve the rest of the county. A 3/4-inch residential service outside the Gaffney city limits is $3,000, including a $25 inspection fee; encasement pipe or asphalt overlay work required by the state highway department is billed at cost. A separate BPW water impact fee applies.
    $3,000.00
  • Water Impact Fee (Gaffney Board of Public Works) — 1.0 ERU × $1,000/ERU
    3/4" (1.0 ERU)
    Gaffney Board of Public Works
    Gaffney Board of Public Works water impact fee for a standard 3/4-inch residential meter (one equivalent residential unit of 300 gallons per day at $1,000), in effect since March 18, 2025, the same inside and outside the city, and paid on or before the connection charge. Applies where BPW provides the water service, not on the rural water systems.
    $1,000.00
Sewer$7,000.00
  • Sewer Impact Fee (Gaffney Board of Public Works) — 1.0 ERU × $4,000/ERU
    3/4" (1.0 ERU)
    Gaffney Board of Public Works
    Gaffney Board of Public Works sewer impact fee for a standard 3/4-inch residential meter (one equivalent residential unit of 300 gallons per day at $4,000), in effect since March 18, 2025, the same inside and outside the city, and charged in addition to the sewer connection charge. For a residential development, sewer impact fees for all planned units are due before the permit to construct is submitted.
    $4,000.00
  • Sewer Connection Charge (Gaffney Board of Public Works)
    3/4", outside city
    Gaffney Board of Public Works
    Gaffney Board of Public Works is the only sewer utility in unincorporated Cherokee County, and most of the unincorporated area is on septic. Where BPW sewer mains reach, a 3/4-inch service outside the Gaffney city limits is $3,000; encasement pipe or asphalt overlay work required by the state highway department is billed at cost. A separate BPW sewer impact fee applies.
    $3,000.00
County$0.00
  • County Development Impact Fee (Cherokee County)
    Cherokee County
    Cherokee County levies no development impact fee. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
    $0.00
Total (unincorporated Cherokee County): $11,000.00
Sources last checked Official fee schedules:Gaffney Board of Public Works None (unincorporated area) Cherokee County

Where in Cherokee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Cherokee County$9,750.00this pageIncludes unconfirmed fees
Blacksburg$6,250.00Includes unconfirmed feesGaffney$7,750.00Includes unconfirmed fees

Unincorporated Cherokee County: Multifamily Impact Fees

A new multifamily unit in unincorporated Cherokee County pays $9,750.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Connection Charge (Gaffney Board of Public Works, MF) ($3,000.00) and Water Connection Charge (MF) — Gaffney Board of Public Works ($3,000.00).

Water Impact Fee (Gaffney Board of Public Works, MF) — 0.75 ERU/unit × $1,000/ERU and Sewer Impact Fee (Gaffney Board of Public Works, MF) — 0.75 ERU/unit × $4,000/ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Cherokee County Impact Fee Schedule
Water$3,750.00
  • Water Connection Charge (MF) — Gaffney Board of Public Works
    Gaffney BPW, 3/4" outside city
    Gaffney Board of Public Works
    Gaffney Board of Public Works, the largest water provider in unincorporated Cherokee County, sets water connection charges by meter size rather than by dwelling unit. A 3/4-inch service outside the Gaffney city limits is $3,000; a building served by one connection pays it once, and larger buildings pay the charge for their meter size (up to $132,000 for 8 inches). A separate BPW water impact fee applies.
    $3,000.00
  • Water Impact Fee (Gaffney Board of Public Works, MF) — 0.75 ERU/unit × $1,000/ERU
    2BR unit (225 gpd = 0.75 ERU)
    Gaffney Board of Public Works
    Gaffney Board of Public Works water impact fee, $1,000 per equivalent residential unit of 300 gallons per day, in effect since March 18, 2025. BPW prices the fee by meter size and publishes no per-unit multifamily rate; this amount assumes a two-bedroom unit at 0.75 of a unit under state wastewater flow guidelines. Applies where BPW provides the water service.
    $750.00Requires confirmation
Sewer$6,000.00
  • Sewer Impact Fee (Gaffney Board of Public Works, MF) — 0.75 ERU/unit × $4,000/ERU
    2BR unit (225 gpd = 0.75 ERU)
    Gaffney Board of Public Works
    Gaffney Board of Public Works sewer impact fee, $4,000 per equivalent residential unit of 300 gallons per day, in effect since March 18, 2025; a residential development pays it for all planned units before the permit to construct is submitted. BPW prices the fee by meter size and publishes no per-unit multifamily rate; this amount assumes a two-bedroom unit at 0.75 of a unit under state wastewater flow guidelines.
    $3,000.00Requires confirmation
  • Sewer Connection Charge (Gaffney Board of Public Works, MF)
    3/4", outside city
    Gaffney Board of Public Works
    Gaffney Board of Public Works, the only sewer utility in unincorporated Cherokee County, sets sewer connection charges by water service size rather than by dwelling unit. A 3/4-inch service outside the Gaffney city limits is $3,000; a building served by one connection pays it once, and larger buildings pay the charge for their service size (up to $360,000 for 8 inches). A separate BPW sewer impact fee applies.
    $3,000.00
County$0.00
  • County Development Impact Fee (Cherokee County, MF)
    Cherokee County
    Cherokee County levies no development impact fee. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
    $0.00
Total (unincorporated Cherokee County): $9,750.00
Sources last checked Official fee schedules:Gaffney Board of Public Works None (unincorporated area) Cherokee County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Cherokee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Unincorporated Cherokee County$26,500.00*this page
Blacksburg$16,200.00*Gaffney$19,700.00*

Unincorporated Cherokee County: Commercial Impact Fees

Commercial development in unincorporated Cherokee County pays no per-square-foot impact fees, but owes $26,500.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 50,000 sq ft building, that comes to about $26,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU) ($10,000.00 one-time), Sewer Connection Charge (Gaffney Board of Public Works) — 1" service ($9,000.00 one-time) and Water Connection Charge — Gaffney Board of Public Works ($5,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Cherokee County Impact Fee Schedule
Water$7,500.00 one-time
  • Water Connection Charge — Gaffney Board of Public Works
    Gaffney BPW, 1" outside city
    Gaffney Board of Public Works
    Gaffney Board of Public Works is the largest water provider in unincorporated Cherokee County and charges outside-city rates there; Grassy Pond Water Company and three rural water districts serve other areas. A 1-inch BPW service is $5,000, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. Services of 4 inches and up need a customer-built meter pit; 10-inch and 12-inch services are priced by BPW on request. The BPW water impact fee is charged in addition.
    $5,000.00 one-time
  • Water Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)
    Gaffney Board of Public Works
    Gaffney BPW water impact fee for a 1-inch meter (2.5 ERU at $1,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Paid on or before the water connection charge and in addition to it. Connections over 10 inches are assessed on the engineer's design daily demand; metered fire-suppression-only connections pay no impact fee.
    $2,500.00 one-time
Sewer$19,000.00 one-time
  • Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)
    Gaffney Board of Public Works
    Gaffney BPW sewer impact fee for a 1-inch water meter (2.5 ERU at $4,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Commercial and industrial projects pay it before submittal of a Permit to Construct, in addition to the sewer connection charge. Applies only where BPW sewer is available; connections over 10 inches are assessed on the engineer's design daily demand.
    $10,000.00 one-time
  • Sewer Connection Charge (Gaffney Board of Public Works) — 1" service
    Gaffney Board of Public Works
    Gaffney BPW sewer connection charge for a 1-inch water service, outside-city rate (unincorporated Cherokee County). Public sewer reaches only areas along BPW mains; most of the unincorporated county is on septic. Includes a $25 inspection fee; encasement pipe or asphalt overlay required by the state highway department is billed at actual cost. The BPW sewer impact fee is charged in addition.
    $9,000.00 one-time
County$0.00
  • County Development Impact Fee (Cherokee County, Commercial)
    Cherokee County
    Cherokee County levies no development impact fee on nonresidential construction. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
    $0.00
Total (unincorporated Cherokee County): $26,500.00 one-time (≈ $26,500.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Gaffney Board of Public Works Cherokee County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Cherokee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Unincorporated Cherokee County$26,500.00*this page
Blacksburg$16,200.00*Gaffney$19,700.00*

Unincorporated Cherokee County: Industrial Impact Fees

Industrial development in unincorporated Cherokee County pays no per-square-foot impact fees, but owes $26,500.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 50,000 sq ft building, that comes to about $26,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU) ($10,000.00 one-time), Sewer Connection Charge (Gaffney Board of Public Works) — 1" service ($9,000.00 one-time) and Water Connection Charge — Gaffney Board of Public Works ($5,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Cherokee County Impact Fee Schedule
Water$7,500.00 one-time
  • Water Connection Charge — Gaffney Board of Public Works
    Gaffney BPW, 1" outside city
    Gaffney Board of Public Works
    Gaffney Board of Public Works is the largest water provider in unincorporated Cherokee County and charges outside-city rates there; Grassy Pond Water Company and three rural water districts serve other areas. A 1-inch BPW service is $5,000, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. Services of 4 inches and up need a customer-built meter pit; 10-inch and 12-inch services are priced by BPW on request. The BPW water impact fee is charged in addition.
    $5,000.00 one-time
  • Water Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)
    Gaffney Board of Public Works
    Gaffney BPW water impact fee for a 1-inch meter (2.5 ERU at $1,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Paid on or before the water connection charge and in addition to it. Connections over 10 inches are assessed on the engineer's design daily demand; metered fire-suppression-only connections pay no impact fee.
    $2,500.00 one-time
Sewer$19,000.00 one-time
  • Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)
    Gaffney Board of Public Works
    Gaffney BPW sewer impact fee for a 1-inch water meter (2.5 ERU at $4,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Commercial and industrial projects pay it before submittal of a Permit to Construct, in addition to the sewer connection charge. Applies only where BPW sewer is available; connections over 10 inches are assessed on the engineer's design daily demand.
    $10,000.00 one-time
  • Sewer Connection Charge (Gaffney Board of Public Works) — 1" service
    Gaffney Board of Public Works
    Gaffney BPW sewer connection charge for a 1-inch water service, outside-city rate (unincorporated Cherokee County). Public sewer reaches only areas along BPW mains; most of the unincorporated county is on septic. Includes a $25 inspection fee; encasement pipe or asphalt overlay required by the state highway department is billed at actual cost. The BPW sewer impact fee is charged in addition.
    $9,000.00 one-time
County$0.00
  • County Development Impact Fee (Cherokee County, Industrial)
    Cherokee County
    Cherokee County levies no development impact fee on nonresidential construction. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
    $0.00
Total (unincorporated Cherokee County): $26,500.00 one-time (≈ $26,500.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Gaffney Board of Public Works Cherokee County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Cherokee County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.

Unincorporated Cherokee County$26,500.00*this page
Blacksburg$16,200.00*Gaffney$19,700.00*

Unincorporated Cherokee County: Office Impact Fees

Office development in unincorporated Cherokee County pays no per-square-foot impact fees, but owes $26,500.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).

For a 25,000 sq ft building, that comes to about $26,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU) ($10,000.00 one-time), Sewer Connection Charge (Gaffney Board of Public Works) — 1" service ($9,000.00 one-time) and Water Connection Charge — Gaffney Board of Public Works ($5,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Cherokee County Impact Fee Schedule
Water$7,500.00 one-time
  • Water Connection Charge — Gaffney Board of Public Works
    Gaffney BPW, 1" outside city
    Gaffney Board of Public Works
    Gaffney Board of Public Works is the largest water provider in unincorporated Cherokee County and charges outside-city rates there; Grassy Pond Water Company and three rural water districts serve other areas. A 1-inch BPW service is $5,000, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. Services of 4 inches and up need a customer-built meter pit; 10-inch and 12-inch services are priced by BPW on request. The BPW water impact fee is charged in addition.
    $5,000.00 one-time
  • Water Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)
    Gaffney Board of Public Works
    Gaffney BPW water impact fee for a 1-inch meter (2.5 ERU at $1,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Paid on or before the water connection charge and in addition to it. Connections over 10 inches are assessed on the engineer's design daily demand; metered fire-suppression-only connections pay no impact fee.
    $2,500.00 one-time
Sewer$19,000.00 one-time
  • Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)
    Gaffney Board of Public Works
    Gaffney BPW sewer impact fee for a 1-inch water meter (2.5 ERU at $4,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Commercial and industrial projects pay it before submittal of a Permit to Construct, in addition to the sewer connection charge. Applies only where BPW sewer is available; connections over 10 inches are assessed on the engineer's design daily demand.
    $10,000.00 one-time
  • Sewer Connection Charge (Gaffney Board of Public Works) — 1" service
    Gaffney Board of Public Works
    Gaffney BPW sewer connection charge for a 1-inch water service, outside-city rate (unincorporated Cherokee County). Public sewer reaches only areas along BPW mains; most of the unincorporated county is on septic. Includes a $25 inspection fee; encasement pipe or asphalt overlay required by the state highway department is billed at actual cost. The BPW sewer impact fee is charged in addition.
    $9,000.00 one-time
County$0.00
  • County Development Impact Fee (Cherokee County, Office)
    Cherokee County
    Cherokee County levies no development impact fee on nonresidential construction. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
    $0.00
Total (unincorporated Cherokee County): $26,500.00 one-time (≈ $26,500.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Gaffney Board of Public Works Cherokee County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Cherokee County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Cherokee County Impact Fee FAQs

What are single-family impact fees in Cherokee County, South Carolina?

A new single-family home in unincorporated Cherokee County pays $11,000.00 per unit in impact fees (rates sourced November 4, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Cherokee County?

Multifamily development in unincorporated Cherokee County pays $9,750.00 per unit in impact fees (rates sourced November 4, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Cherokee County?

Commercial development in unincorporated Cherokee County pays no per-square-foot impact fees, but owes $26,500.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Do cities in Cherokee County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 2 of 2 cities in Cherokee County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.