Gaffney Impact Fees by Project Type
Gaffney: Single-Family Impact Fees
A new single-family home in Gaffney pays $9,000.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1.0 ERU × $4,000/ERU ($4,000.00), Water Connection Charge (Gaffney Board of Public Works) ($2,000.00) and Sewer Connection Charge (Gaffney Board of Public Works) ($2,000.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Gaffney Impact Fee Schedule
- Water Connection Charge (Gaffney Board of Public Works)$2,000.003/4", inside cityGaffney Board of Public WorksGaffney Board of Public Works, not the city, sets water connection charges in Gaffney. A 3/4-inch residential service inside the city is $2,000, including a $25 inspection fee; encasement pipe or asphalt overlay work required by the state highway department is billed at cost. A separate BPW water impact fee applies.
- Water Impact Fee (Gaffney Board of Public Works) — 1.0 ERU × $1,000/ERU$1,000.003/4" (1.0 ERU)Gaffney Board of Public WorksGaffney Board of Public Works water impact fee for a standard 3/4-inch residential meter (one equivalent residential unit of 300 gallons per day at $1,000), in effect since March 18, 2025, the same inside and outside the city, and paid on or before the connection charge.
- Sewer Impact Fee (Gaffney Board of Public Works) — 1.0 ERU × $4,000/ERU$4,000.003/4" (1.0 ERU)Gaffney Board of Public WorksGaffney Board of Public Works sewer impact fee for a standard 3/4-inch residential meter (one equivalent residential unit of 300 gallons per day at $4,000), in effect since March 18, 2025, the same inside and outside the city, and charged in addition to the sewer connection charge. For a residential development, sewer impact fees for all planned units are due before the permit to construct is submitted.
- Sewer Connection Charge (Gaffney Board of Public Works)$2,000.003/4", inside cityGaffney Board of Public WorksGaffney Board of Public Works sets sewer connection charges in Gaffney by the size of the water service. A 3/4-inch service inside the city is $2,000; encasement pipe or asphalt overlay work required by the state highway department is billed at cost. A separate BPW sewer impact fee applies.
- City Development Impact Fee (City of Gaffney)$0.00City of Gaffney
- County Development Impact Fee (Cherokee County)$0.00Cherokee CountyCherokee County levies no development impact fee. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
Where in Cherokee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours.
Gaffney: Multifamily Impact Fees
A new multifamily unit in Gaffney pays $7,750.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Charge (Gaffney Board of Public Works, MF) ($2,000.00) and Sewer Connection Charge (Gaffney Board of Public Works, MF) ($2,000.00).
Water Impact Fee (Gaffney Board of Public Works, MF) — 0.75 ERU/unit × $1,000/ERU and Sewer Impact Fee (Gaffney Board of Public Works, MF) — 0.75 ERU/unit × $4,000/ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Gaffney Impact Fee Schedule
- Water Connection Charge (Gaffney Board of Public Works, MF)$2,000.003/4", inside cityGaffney Board of Public WorksGaffney Board of Public Works sets water connection charges by meter size, not by dwelling unit. A 3/4-inch service inside the city is $2,000; a building served by one connection pays it once, and larger buildings pay the charge for their meter size (up to $82,500 for 8 inches). A separate BPW water impact fee applies.
- Water Impact Fee (Gaffney Board of Public Works, MF) — 0.75 ERU/unit × $1,000/ERU$750.00Requires confirmation2BR unit (225 gpd = 0.75 ERU)Gaffney Board of Public WorksGaffney Board of Public Works water impact fee, $1,000 per equivalent residential unit of 300 gallons per day, in effect since March 18, 2025. BPW prices the fee by meter size and publishes no per-unit multifamily rate; this amount assumes a two-bedroom unit at 0.75 of a unit under state wastewater flow guidelines.
- Sewer Impact Fee (Gaffney Board of Public Works, MF) — 0.75 ERU/unit × $4,000/ERU$3,000.00Requires confirmation2BR unit (225 gpd = 0.75 ERU)Gaffney Board of Public WorksGaffney Board of Public Works sewer impact fee, $4,000 per equivalent residential unit of 300 gallons per day, in effect since March 18, 2025; a residential development pays it for all planned units before the permit to construct is submitted. BPW prices the fee by meter size and publishes no per-unit multifamily rate; this amount assumes a two-bedroom unit at 0.75 of a unit under state wastewater flow guidelines.
- Sewer Connection Charge (Gaffney Board of Public Works, MF)$2,000.003/4", inside cityGaffney Board of Public WorksGaffney Board of Public Works sets sewer connection charges by water service size, not by dwelling unit. A 3/4-inch service inside the city is $2,000; a building served by one connection pays it once, and larger buildings pay the charge for their service size (up to $240,000 for 8 inches). A separate BPW sewer impact fee applies.
- City Development Impact Fee (City of Gaffney, MF)$0.00City of Gaffney
- County Development Impact Fee (Cherokee County, MF)$0.00Cherokee CountyCherokee County levies no development impact fee. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
Where in Cherokee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Gaffney: Commercial Impact Fees
Commercial development in Gaffney pays no per-square-foot impact fees, but owes $19,700.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to about $19,700.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU) ($10,000.00 one-time), Sewer Connection Charge (Gaffney Board of Public Works) — 1" service ($4,200.00 one-time) and Water Connection Charge (Gaffney Board of Public Works) — 1" service ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Gaffney Impact Fee Schedule
- Water Connection Charge (Gaffney Board of Public Works) — 1" service$3,000.00 one-timeGaffney Board of Public WorksWater service in the City of Gaffney is provided by Gaffney Board of Public Works. A 1-inch service inside the city pays a $3,000 connection charge, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. Services of 4 inches and up need a customer-built meter pit; 10-inch and 12-inch services are priced by BPW on request. The BPW water impact fee is charged in addition.
- Water Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)$2,500.00 one-timeGaffney Board of Public WorksGaffney BPW water impact fee for a 1-inch meter (2.5 ERU at $1,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Paid on or before the water connection charge and in addition to it. Connections over 10 inches are assessed on the engineer's design daily demand; metered fire-suppression-only connections pay no impact fee.
- Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)$10,000.00 one-timeGaffney Board of Public WorksGaffney BPW sewer impact fee for a 1-inch water meter (2.5 ERU at $4,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Commercial and industrial projects pay it before submittal of a Permit to Construct, in addition to the sewer connection charge. Connections over 10 inches are assessed on the engineer's design daily demand.
- Sewer Connection Charge (Gaffney Board of Public Works) — 1" service$4,200.00 one-timeGaffney Board of Public WorksSewer service in the City of Gaffney is provided by Gaffney Board of Public Works. A 1-inch water service inside the city pays a $4,200 sewer connection charge, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. The BPW sewer impact fee is charged in addition.
- City Development Impact Fee (City of Gaffney, Commercial)$0.00City of GaffneyThe City of Gaffney charges no development impact fee. Water and sewer connection charges and impact fees are set by Gaffney Board of Public Works.
- County Development Impact Fee (Cherokee County, Commercial)$0.00Cherokee CountyCherokee County levies no development impact fee on nonresidential construction. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
Where in Cherokee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Gaffney: Industrial Impact Fees
Industrial development in Gaffney pays no per-square-foot impact fees, but owes $19,700.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to about $19,700.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU) ($10,000.00 one-time), Sewer Connection Charge (Gaffney Board of Public Works) — 1" service ($4,200.00 one-time) and Water Connection Charge (Gaffney Board of Public Works) — 1" service ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Gaffney Impact Fee Schedule
- Water Connection Charge (Gaffney Board of Public Works) — 1" service$3,000.00 one-timeGaffney Board of Public WorksWater service in the City of Gaffney is provided by Gaffney Board of Public Works. A 1-inch service inside the city pays a $3,000 connection charge, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. Services of 4 inches and up need a customer-built meter pit; 10-inch and 12-inch services are priced by BPW on request. The BPW water impact fee is charged in addition.
- Water Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)$2,500.00 one-timeGaffney Board of Public WorksGaffney BPW water impact fee for a 1-inch meter (2.5 ERU at $1,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Paid on or before the water connection charge and in addition to it. Connections over 10 inches are assessed on the engineer's design daily demand; metered fire-suppression-only connections pay no impact fee.
- Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)$10,000.00 one-timeGaffney Board of Public WorksGaffney BPW sewer impact fee for a 1-inch water meter (2.5 ERU at $4,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Commercial and industrial projects pay it before submittal of a Permit to Construct, in addition to the sewer connection charge. Connections over 10 inches are assessed on the engineer's design daily demand.
- Sewer Connection Charge (Gaffney Board of Public Works) — 1" service$4,200.00 one-timeGaffney Board of Public WorksSewer service in the City of Gaffney is provided by Gaffney Board of Public Works. A 1-inch water service inside the city pays a $4,200 sewer connection charge, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. The BPW sewer impact fee is charged in addition.
- City Development Impact Fee (City of Gaffney, Industrial)$0.00City of GaffneyThe City of Gaffney charges no development impact fee. Water and sewer connection charges and impact fees are set by Gaffney Board of Public Works.
- County Development Impact Fee (Cherokee County, Industrial)$0.00Cherokee CountyCherokee County levies no development impact fee on nonresidential construction. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
Where in Cherokee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Gaffney: Office Impact Fees
Office development in Gaffney pays no per-square-foot impact fees, but owes $19,700.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 25,000 sq ft building, that comes to about $19,700.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU) ($10,000.00 one-time), Sewer Connection Charge (Gaffney Board of Public Works) — 1" service ($4,200.00 one-time) and Water Connection Charge (Gaffney Board of Public Works) — 1" service ($3,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Gaffney Impact Fee Schedule
- Water Connection Charge (Gaffney Board of Public Works) — 1" service$3,000.00 one-timeGaffney Board of Public WorksWater service in the City of Gaffney is provided by Gaffney Board of Public Works. A 1-inch service inside the city pays a $3,000 connection charge, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. Services of 4 inches and up need a customer-built meter pit; 10-inch and 12-inch services are priced by BPW on request. The BPW water impact fee is charged in addition.
- Water Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)$2,500.00 one-timeGaffney Board of Public WorksGaffney BPW water impact fee for a 1-inch meter (2.5 ERU at $1,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Paid on or before the water connection charge and in addition to it. Connections over 10 inches are assessed on the engineer's design daily demand; metered fire-suppression-only connections pay no impact fee.
- Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)$10,000.00 one-timeGaffney Board of Public WorksGaffney BPW sewer impact fee for a 1-inch water meter (2.5 ERU at $4,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Commercial and industrial projects pay it before submittal of a Permit to Construct, in addition to the sewer connection charge. Connections over 10 inches are assessed on the engineer's design daily demand.
- Sewer Connection Charge (Gaffney Board of Public Works) — 1" service$4,200.00 one-timeGaffney Board of Public WorksSewer service in the City of Gaffney is provided by Gaffney Board of Public Works. A 1-inch water service inside the city pays a $4,200 sewer connection charge, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. The BPW sewer impact fee is charged in addition.
- City Development Impact Fee (City of Gaffney, Office)$0.00City of GaffneyThe City of Gaffney charges no development impact fee. Water and sewer connection charges and impact fees are set by Gaffney Board of Public Works.
- County Development Impact Fee (Cherokee County, Office)$0.00Cherokee CountyCherokee County levies no development impact fee on nonresidential construction. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
Where in Cherokee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Gaffney Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Gaffney Impact Fee FAQs
What are the total impact fees for a single-family home in Gaffney, South Carolina?
A new single-family home in Gaffney pays $9,000.00 per unit in combined impact fees (rates sourced November 4, 2026).
How much are commercial impact fees in Gaffney?
Commercial development in Gaffney pays no per-square-foot impact fees, but owes $19,700.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Gaffney charge its own impact fees?
Yes. Gaffney levies its own municipal impact or utility fees. Cherokee County does not currently add county-level impact fees inside Gaffney. The schedule on this page shows every fee that applies to development in Gaffney.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Cherokee County impact fees page.