Blacksburg Impact Fees by Project Type
Blacksburg: Single-Family Impact Fees
A new single-family home in Blacksburg pays $7,250.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1.0 ERU × $4,000/ERU ($4,000.00), Sewer Connection Charge (Gaffney Board of Public Works) ($2,000.00) and Water Connection Charge (Town of Blacksburg) ($1,250.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Blacksburg Impact Fee Schedule
- Water Connection Charge (Town of Blacksburg)$1,250.003/4", inside townTown of BlacksburgThe Town of Blacksburg owns its water system and sets its own tap fees; Gaffney Board of Public Works handles billing and service applications. A 3/4-inch service inside town limits is $1,250 ($2,500 outside). Tap fees are subject to additional surcharges when the state highway department requires them. The town charges no water impact fee.
- Sewer Impact Fee (Gaffney Board of Public Works) — 1.0 ERU × $4,000/ERU$4,000.003/4" (1.0 ERU)Gaffney Board of Public WorksGaffney Board of Public Works sewer impact fee for a standard 3/4-inch residential meter (one equivalent residential unit of 300 gallons per day at $4,000), in effect since March 18, 2025, charged systemwide including Blacksburg and in addition to the sewer connection charge.
- Sewer Connection Charge (Gaffney Board of Public Works)$2,000.003/4", inside townGaffney Board of Public WorksGaffney Board of Public Works provides sewer service in Blacksburg, and addresses inside town limits pay BPW's inside-city rate: $2,000 for a 3/4-inch service. Encasement pipe or asphalt overlay work required by the state highway department is billed at cost. A separate BPW sewer impact fee applies.
- City Development Impact Fee (Town of Blacksburg)$0.00Town of Blacksburg
- County Development Impact Fee (Cherokee County)$0.00Cherokee CountyCherokee County levies no development impact fee. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
Where in Cherokee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours.
Blacksburg: Multifamily Impact Fees
A new multifamily unit in Blacksburg pays $6,250.00 per unit in impact fees (rates sourced November 4, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection Charge (Gaffney Board of Public Works, MF) ($2,000.00) and Water Connection Charge (Town of Blacksburg, MF) ($1,250.00).
Sewer Impact Fee (Gaffney Board of Public Works, MF) — 0.75 ERU/unit × $4,000/ERU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Blacksburg Impact Fee Schedule
- Water Connection Charge (Town of Blacksburg, MF)$1,250.003/4", inside townTown of BlacksburgTown of Blacksburg water tap fees are set by service size, not by dwelling unit. A 3/4-inch service inside town limits is $1,250; a building on one tap pays it once, and larger buildings pay the fee for their service size (up to $37,500 for 12 inches, plus the contractor's installation price above 2 inches). Gaffney Board of Public Works bills the town's water accounts.
- Sewer Impact Fee (Gaffney Board of Public Works, MF) — 0.75 ERU/unit × $4,000/ERU$3,000.00Requires confirmation2BR unit (225 gpd = 0.75 ERU)Gaffney Board of Public WorksGaffney Board of Public Works sewer impact fee, $4,000 per equivalent residential unit of 300 gallons per day, in effect since March 18, 2025; a residential development pays it for all planned units before the permit to construct is submitted. BPW prices the fee by meter size and publishes no per-unit multifamily rate; this amount assumes a two-bedroom unit at 0.75 of a unit under state wastewater flow guidelines.
- Sewer Connection Charge (Gaffney Board of Public Works, MF)$2,000.003/4", inside townGaffney Board of Public WorksGaffney Board of Public Works provides sewer service in Blacksburg and sets connection charges by water service size, not by dwelling unit. A 3/4-inch service inside town limits is $2,000; a building served by one connection pays it once, and larger buildings pay the charge for their service size (up to $240,000 for 8 inches). A separate BPW sewer impact fee applies.
- City Development Impact Fee (Town of Blacksburg, MF)$0.00Town of Blacksburg
- County Development Impact Fee (Cherokee County, MF)$0.00Cherokee CountyCherokee County levies no development impact fee. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
Where in Cherokee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blacksburg: Commercial Impact Fees
Commercial development in Blacksburg pays no per-square-foot impact fees, but owes $16,200.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to about $16,200.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU) ($10,000.00 one-time), Sewer Connection Charge (Gaffney Board of Public Works) — 1" service ($4,200.00 one-time) and Water Connection Charge (Town of Blacksburg) — 1" service ($2,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Blacksburg Impact Fee Schedule
- Water Connection Charge (Town of Blacksburg) — 1" service$2,000.00 one-timeTown of BlacksburgThe Town of Blacksburg runs its own water system; a 1-inch tap inside town limits is $2,000. The town installs taps up to 2 inches; larger taps pay the tap charge plus the contractor's installation price. State highway surcharges may apply.
- Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)$10,000.00 one-timeGaffney Board of Public WorksGaffney BPW sewer impact fee for a 1-inch water meter in the Town of Blacksburg (2.5 ERU at $4,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Commercial and industrial projects pay it before submittal of a Permit to Construct, in addition to the sewer connection charge. Connections over 10 inches are assessed on the engineer's design daily demand.
- Sewer Connection Charge (Gaffney Board of Public Works) — 1" service$4,200.00 one-timeGaffney Board of Public WorksSewer service in the Town of Blacksburg is provided by Gaffney Board of Public Works at its inside-city rate. A 1-inch water service pays a $4,200 sewer connection charge, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. The BPW sewer impact fee is charged in addition.
- City Development Impact Fee (Town of Blacksburg, Commercial)$0.00Town of BlacksburgThe Town of Blacksburg charges no development impact fee. Water tap fees are set by the Town; sewer connection charges and impact fees are set by Gaffney Board of Public Works.
- County Development Impact Fee (Cherokee County, Commercial)$0.00Cherokee CountyCherokee County levies no development impact fee on nonresidential construction. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
Where in Cherokee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Blacksburg: Industrial Impact Fees
Industrial development in Blacksburg pays no per-square-foot impact fees, but owes $16,200.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 50,000 sq ft building, that comes to about $16,200.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU) ($10,000.00 one-time), Sewer Connection Charge (Gaffney Board of Public Works) — 1" service ($4,200.00 one-time) and Water Connection Charge (Town of Blacksburg) — 1" service ($2,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Blacksburg Impact Fee Schedule
- Water Connection Charge (Town of Blacksburg) — 1" service$2,000.00 one-timeTown of BlacksburgThe Town of Blacksburg runs its own water system; a 1-inch tap inside town limits is $2,000. The town installs taps up to 2 inches; larger taps pay the tap charge plus the contractor's installation price. State highway surcharges may apply.
- Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)$10,000.00 one-timeGaffney Board of Public WorksGaffney BPW sewer impact fee for a 1-inch water meter in the Town of Blacksburg (2.5 ERU at $4,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Commercial and industrial projects pay it before submittal of a Permit to Construct, in addition to the sewer connection charge. Connections over 10 inches are assessed on the engineer's design daily demand.
- Sewer Connection Charge (Gaffney Board of Public Works) — 1" service$4,200.00 one-timeGaffney Board of Public WorksSewer service in the Town of Blacksburg is provided by Gaffney Board of Public Works at its inside-city rate. A 1-inch water service pays a $4,200 sewer connection charge, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. The BPW sewer impact fee is charged in addition.
- City Development Impact Fee (Town of Blacksburg, Industrial)$0.00Town of BlacksburgThe Town of Blacksburg charges no development impact fee. Water tap fees are set by the Town; sewer connection charges and impact fees are set by Gaffney Board of Public Works.
- County Development Impact Fee (Cherokee County, Industrial)$0.00Cherokee CountyCherokee County levies no development impact fee on nonresidential construction. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
Where in Cherokee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Blacksburg: Office Impact Fees
Office development in Blacksburg pays no per-square-foot impact fees, but owes $16,200.00 in one-time water and sewer connection fees (rates sourced November 4, 2026).
For a 25,000 sq ft building, that comes to about $16,200.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU) ($10,000.00 one-time), Sewer Connection Charge (Gaffney Board of Public Works) — 1" service ($4,200.00 one-time) and Water Connection Charge (Town of Blacksburg) — 1" service ($2,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Blacksburg Impact Fee Schedule
- Water Connection Charge (Town of Blacksburg) — 1" service$2,000.00 one-timeTown of BlacksburgThe Town of Blacksburg runs its own water system; a 1-inch tap inside town limits is $2,000. The town installs taps up to 2 inches; larger taps pay the tap charge plus the contractor's installation price. State highway surcharges may apply.
- Sewer Impact Fee (Gaffney Board of Public Works) — 1" meter (2.5 ERU)$10,000.00 one-timeGaffney Board of Public WorksGaffney BPW sewer impact fee for a 1-inch water meter in the Town of Blacksburg (2.5 ERU at $4,000 per ERU; 1 ERU = 300 gallons per day), approved March 18, 2025, same inside and outside the city. Commercial and industrial projects pay it before submittal of a Permit to Construct, in addition to the sewer connection charge. Connections over 10 inches are assessed on the engineer's design daily demand.
- Sewer Connection Charge (Gaffney Board of Public Works) — 1" service$4,200.00 one-timeGaffney Board of Public WorksSewer service in the Town of Blacksburg is provided by Gaffney Board of Public Works at its inside-city rate. A 1-inch water service pays a $4,200 sewer connection charge, including a $25 inspection fee; state highway encasement or overlay work is billed at actual cost. The BPW sewer impact fee is charged in addition.
- City Development Impact Fee (Town of Blacksburg, Office)$0.00Town of BlacksburgThe Town of Blacksburg charges no development impact fee. Water tap fees are set by the Town; sewer connection charges and impact fees are set by Gaffney Board of Public Works.
- County Development Impact Fee (Cherokee County, Office)$0.00Cherokee CountyCherokee County levies no development impact fee on nonresidential construction. The county began an impact fee study in 2026 covering parks and recreation and sheriff facilities; no fee ordinance had been adopted as of November 2026.
Where in Cherokee County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction.
Blacksburg Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Blacksburg Impact Fee FAQs
What are the total impact fees for a single-family home in Blacksburg, South Carolina?
A new single-family home in Blacksburg pays $7,250.00 per unit in combined impact fees (rates sourced November 4, 2026).
How much are commercial impact fees in Blacksburg?
Commercial development in Blacksburg pays no per-square-foot impact fees, but owes $16,200.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Blacksburg charge its own impact fees?
Yes. Blacksburg levies its own municipal impact or utility fees. Cherokee County does not currently add county-level impact fees inside Blacksburg. The schedule on this page shows every fee that applies to development in Blacksburg.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Cherokee County impact fees page.