Skip to content
IMPACTFEES.ORG

Ridgeville, South Carolina Impact Fees

Ridgeville applies its own fee schedule: municipal fees plus the Dorchester County-levied fees that apply inside city limits. Combined, a new single-family home pays $11,510.00 per unit (rates sourced ). The full breakdown is below.

Ridgeville Impact Fees by Project Type

Ridgeville: Single-Family Impact Fees

A new single-family home in Ridgeville pays $11,510.00 per unit in impact fees (rates sourced November 19, 2026). Of that, Dorchester County-levied fees account for $9,010.00 and municipal or utility fees for $2,500.00.

The largest line items are Sewer Impact Fee (Dorchester County Water & Sewer) ($6,510.00), Sewer Connection Fee (Dorchester County Water & Sewer) ($2,500.00) and Water Tap Fee (Town of Ridgeville) ($2,500.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Ridgeville Impact Fee Schedule
Water$2,500.00
  • Water Tap Fee (Town of Ridgeville)
    Town of Ridgeville
    The Town of Ridgeville provides water service and charges a flat $2,500 water tap fee, plus a separate $55 connection fee and a refundable $100 deposit. The owner installs and maintains the service line from the property line, and the town may bill any cost of providing service above its standard rates.
    $2,500.00
Sewer$9,010.00
  • Sewer Impact Fee (Dorchester County Water & Sewer)
    Dorchester County Water & Sewer
    Sewer in Ridgeville is provided by Dorchester County Water & Sewer, with flows treated at its Lower plant. The county charges a sewer impact fee of $6,510 per equivalent residential unit; a single-family home counts as one unit. The town provides water only.
    $6,510.00
  • Sewer Connection Fee (Dorchester County Water & Sewer)
    4" tap
    Dorchester County Water & Sewer
    Sewer in Ridgeville is provided by Dorchester County Water & Sewer, not the town. The county charges a one-time sewer connection (tap) fee of $2,500 for a 4-inch tap, the standard single-family size, or $5,375 for a larger tap, due before the building permit is issued. The sewer impact fee is separate.
    $2,500.00
County$0.00
Total (Ridgeville): $11,510.00
Sources last checked Official fee schedules:Town of Ridgeville Dorchester County Water & Sewer Dorchester County

Where in Dorchester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ridgeville: Multifamily Impact Fees

A new multifamily unit in Ridgeville pays $13,734.00 per unit in impact fees (rates sourced November 19, 2026). Of that, Dorchester County-levied fees account for $11,234.00 and municipal or utility fees for $2,500.00.

The largest line items are Sewer Impact Fee (Dorchester County Water & Sewer, MF) — 0.90 ERU × $6,510/ERU (Lower WWTP) ($5,859.00) and Sewer Connection Fee (Dorchester County Water & Sewer, MF) ($5,375.00).

Water Tap Fee (Town of Ridgeville, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Ridgeville Impact Fee Schedule
Water$2,500.00
  • Water Tap Fee (Town of Ridgeville, MF)
    Town of Ridgeville
    The Town of Ridgeville publishes a flat $2,500 water tap fee with no separate rule for apartment buildings, so the single-family amount is shown per unit; the town sets the charge for multifamily projects.
    $2,500.00Requires confirmation
Sewer$11,234.00
  • Sewer Impact Fee (Dorchester County Water & Sewer, MF) — 0.90 ERU × $6,510/ERU (Lower WWTP)
    Dorchester County Water & Sewer
    Sewer in Ridgeville is provided by Dorchester County Water & Sewer (Lower plant area), which charges $6,510 per equivalent residential unit of 250 gallons per day. Apartments are sized by state flow standards, so a two-bedroom unit counts as 0.9 unit.
    $5,859.00
  • Sewer Connection Fee (Dorchester County Water & Sewer, MF)
    Dorchester County Water & Sewer
    Sewer in Ridgeville is provided by Dorchester County Water & Sewer, which charges its sewer connection (tap) fee per connection, not per apartment. Apartment buildings need a tap larger than 4 inches under county code, which costs $5,375; a building on one connection pays it once. A separate sewer impact fee applies per unit.
    $5,375.00
County$0.00
Total (Ridgeville): $13,734.00
Sources last checked Official fee schedules:Town of Ridgeville Dorchester County Water & Sewer Dorchester County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dorchester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ridgeville: Commercial Impact Fees

Commercial development in Ridgeville pays no per-square-foot impact fees, but owes $11,510.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).

For a 50,000 sq ft building, that comes to about $11,510.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee — Dorchester County Water and Sewer, 1 ERU minimum × $6,510/ERU ($6,510.00 one-time), Sewer Connection Fee — Dorchester County Water and Sewer, 4" line ($2,500.00 one-time) and Water Tap Fee (Town of Ridgeville) ($2,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Ridgeville Impact Fee Schedule
Water$2,500.00 one-time
  • Water Tap Fee (Town of Ridgeville)
    Town of Ridgeville
    Town of Ridgeville water tap fee of $2,500, which includes all connection charges; work beyond a standard tap is billed at cost.
    $2,500.00 one-time
Sewer$9,010.00 one-time
City$0.00
County$0.00
Total (Ridgeville): $11,510.00 one-time (≈ $11,510.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Ridgeville Dorchester County Water and Sewer Dorchester County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dorchester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ridgeville: Industrial Impact Fees

Industrial development in Ridgeville pays no per-square-foot impact fees, but owes $11,510.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).

For a 50,000 sq ft building, that comes to about $11,510.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee — Dorchester County Water and Sewer, 1 ERU minimum × $6,510/ERU ($6,510.00 one-time), Sewer Connection Fee — Dorchester County Water and Sewer, 4" line ($2,500.00 one-time) and Water Tap Fee (Town of Ridgeville) ($2,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Ridgeville Impact Fee Schedule
Water$2,500.00 one-time
  • Water Tap Fee (Town of Ridgeville)
    Town of Ridgeville
    Town of Ridgeville water tap fee of $2,500, which includes all connection charges; work beyond a standard tap is billed at cost.
    $2,500.00 one-time
Sewer$9,010.00 one-time
City$0.00
County$0.00
Total (Ridgeville): $11,510.00 one-time (≈ $11,510.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Ridgeville Dorchester County Water and Sewer Dorchester County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dorchester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ridgeville: Office Impact Fees

Office development in Ridgeville pays no per-square-foot impact fees, but owes $11,510.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).

For a 25,000 sq ft building, that comes to about $11,510.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee — Dorchester County Water and Sewer, 1 ERU minimum × $6,510/ERU ($6,510.00 one-time), Sewer Connection Fee — Dorchester County Water and Sewer, 4" line ($2,500.00 one-time) and Water Tap Fee (Town of Ridgeville) ($2,500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Ridgeville Impact Fee Schedule
Water$2,500.00 one-time
  • Water Tap Fee (Town of Ridgeville)
    Town of Ridgeville
    Town of Ridgeville water tap fee of $2,500, which includes all connection charges; work beyond a standard tap is billed at cost.
    $2,500.00 one-time
Sewer$9,010.00 one-time
City$0.00
County$0.00
Total (Ridgeville): $11,510.00 one-time (≈ $11,510.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Ridgeville Dorchester County Water and Sewer Dorchester County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dorchester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Ridgeville Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Ridgeville Impact Fee FAQs

What are the total impact fees for a single-family home in Ridgeville, South Carolina?

A new single-family home in Ridgeville pays $11,510.00 per unit in combined impact fees (rates sourced November 19, 2026).

How much are commercial impact fees in Ridgeville?

Commercial development in Ridgeville pays no per-square-foot impact fees, but owes $11,510.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Ridgeville charge its own impact fees?

Yes. Ridgeville levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Ridgeville, with the combined total.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Dorchester County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000