Summerville Impact Fees by Project Type
Summerville: Single-Family Impact Fees
A new single-family home in Summerville pays $16,709.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection + Facility Cost Recovery Fee — Summerville CPW, $2,200 connection + $2,925 recovery fee ($5,125.00), Parks & Recreation Impact Fee (Town of Summerville) ($3,654.00) and Water Service Connection Fee (Summerville CPW) ($2,595.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Summerville Impact Fee Schedule
- Water Service Connection Fee (Summerville CPW)$2,595.005/8" service installationSummerville Commissioners of Public WorksSummerville Commissioners of Public Works charges $2,595 to install a new 5/8-inch water service, or $1,020 where the service line already exists and only the meter is set, under its fee schedule updated July 1, 2026. The water Facility Cost Recovery Fee is charged separately. An extra $800 applies if driveway or sidewalk repair is needed.
- Water Facility Cost Recovery Fee (Summerville CPW)$1,290.005/8" meterSummerville Commissioners of Public WorksSummerville Commissioners of Public Works charges new water customers a one-time Facility Cost Recovery Fee by meter size, $1,290 for a standard 5/8-inch residential meter, in addition to the service connection charge. High-volume users pay three times the standard fee.
- Sewer Connection + Facility Cost Recovery Fee — Summerville CPW, $2,200 connection + $2,925 recovery fee$5,125.00Summerville CPW, adjacent gravity or pressure service, 5/8" meterSummerville Commissioners of Public WorksSummerville CPW sewer: $2,200 connection (adjacent gravity or pressure service) plus a $2,925 Facility Cost Recovery Fee for a 5/8 inch meter, effective July 1, 2026. Homes in the North Charleston Sewer District part of the area pay that district's fee instead (option shown).
- Parks & Recreation Impact Fee (Town of Summerville)$3,654.00Town of SummervilleThe Town of Summerville charges a parks and recreation impact fee of $3,654 per single-family home under the impact fee schedule adopted June 11, 2026. It is one of three town impact fees, with public safety ($2,416) and fire ($1,629), for a total of $7,700, paid before the building permit is issued.
- Public Safety Impact Fee (Town of Summerville)$2,416.00Town of SummervilleThe Town of Summerville charges a public safety facilities impact fee of $2,416 per single-family home, added in the impact fee schedule adopted June 11, 2026. It replaced the former municipal facilities and equipment fee.
- Fire Protection Impact Fee (Town of Summerville)$1,629.00Town of SummervilleThe Town of Summerville charges a fire impact fee of $1,629 per single-family home under the schedule adopted June 11, 2026. Building permits issued before that date kept the earlier rates.
- County Development Impact Fee — None Levied (Dorchester County)$0.00Dorchester CountyDorchester County does not charge a development impact fee, inside towns or in the unincorporated area. It repealed its 2010 transportation impact fee in 2018.
Where in Dorchester County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Summerville: Multifamily Impact Fees
A new multifamily unit in Summerville pays $13,612.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection + Facility Cost Recovery Fee (MF) — Summerville CPW, $2,200 connection + $2,925 recovery fee ($5,125.00), Water Service Connection Fee (Summerville CPW, MF) — 5/8" service installation ($2,595.00) and Parks & Recreation Impact Fee (Town of Summerville, MF) ($2,184.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Summerville Impact Fee Schedule
- Water Service Connection Fee (Summerville CPW, MF) — 5/8" service installation$2,595.00Summerville Commissioners of Public WorksSummerville CPW water service connection for a 5/8 inch service installation: $2,595, effective July 1, 2026; charged per connection, so a building on one connection pays once. Where the service line already exists, only the meter set fee applies (option shown).
- Water Facility Cost Recovery Fee (Summerville CPW, MF) — 5/8" meter$1,290.00Summerville Commissioners of Public WorksSummerville CPW water Facility Cost Recovery Fee for a 5/8 inch meter: $1,290, effective July 1, 2026; charged per meter, so a building on one meter pays once.
- Sewer Connection + Facility Cost Recovery Fee (MF) — Summerville CPW, $2,200 connection + $2,925 recovery fee$5,125.00Summerville CPW, adjacent gravity or pressure service, 5/8" meterSummerville Commissioners of Public WorksSummerville CPW sewer: $2,200 connection (adjacent gravity or pressure service) plus a $2,925 Facility Cost Recovery Fee for a 5/8 inch meter, effective July 1, 2026. Homes in the North Charleston Sewer District part of the area pay that district's fee instead (option shown). Charged per connection, so a building on one connection pays once.
- Parks & Recreation Impact Fee (Town of Summerville, MF)$2,184.00Town of SummervilleThe Town of Summerville charges a parks and recreation impact fee of $2,184 per multifamily unit under the schedule adopted June 11, 2026. Public safety ($1,444) and fire ($974) fees also apply, for a total of $4,602 per unit, paid before the building permit is issued.
- Public Safety Impact Fee (Town of Summerville, MF)$1,444.00Town of SummervilleThe Town of Summerville charges a public safety facilities impact fee of $1,444 per multifamily unit, added in the schedule adopted June 11, 2026 in place of the former municipal facilities and equipment fee.
- Fire Protection Impact Fee (Town of Summerville, MF)$974.00Town of SummervilleThe Town of Summerville charges a fire impact fee of $974 per multifamily unit under the schedule adopted June 11, 2026.
- County Development Impact Fee — None Levied (Dorchester County, MF)$0.00Dorchester CountyDorchester County does not charge a development impact fee, inside towns or in the unincorporated area. It repealed its 2010 transportation impact fee in 2018.
Where in Dorchester County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Summerville: Commercial Impact Fees
Commercial development in Summerville pays $5.93 per square foot in impact fees, plus $14,118.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $310,418.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Facility Cost Recovery + Connection Fee — Summerville CPW, $7,313 + $1,000 connection, 1" meter ($8,313.00 one-time), Facility Cost Recovery Fee, Water (Summerville CPW) — 1" meter ($3,225.00 one-time) and Water Service Connection Fee (Summerville CPW) — 1" meter, service installation ($2,580.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Summerville Impact Fee Schedule
- Facility Cost Recovery Fee, Water (Summerville CPW) — 1" meter$3,225.00 one-timeSummerville Commissioners of Public WorksFacility Cost Recovery Fee (water capacity), effective July 1, 2026, by meter size. High-volume users pay 3x the standard fee.
- Water Service Connection Fee (Summerville CPW) — 1" meter, service installation$2,580.00 one-time1", service installationSummerville Commissioners of Public WorksSummerville CPW installs water services of 2 inches or less: $2,580 for a 1-inch service with meter, effective July 1, 2026. Where a service line already exists, only the meter set fee applies (option shown). Services above 2 inches pay $500 plus the cost of the meter and backflow device.
- Sewer Facility Cost Recovery + Connection Fee — Summerville CPW, $7,313 + $1,000 connection, 1" meter$8,313.00 one-timeSummerville CPW, 1"Summerville Commissioners of Public WorksSummerville CPW commercial sewer: a facility cost recovery fee of $7,313 for a 1 inch meter (high-volume users pay three times the standard fee) plus the $1,000 commercial sewer service connection fee, effective July 1, 2026. Parts of Summerville are sewered by the North Charleston Sewer District instead (option shown).
- Public Safety Impact Fee (Town of Summerville, Commercial)$3.82/sq ftTown of SummervilleEffective June 11, 2026. Charged per 1,000 sq ft of gross floor area. Parks & Recreation component is $0 for nonresidential; Fire component billed separately.
- Fire Impact Fee (Town of Summerville, Commercial)$2.11/sq ftTown of SummervilleEffective June 11, 2026. Charged per 1,000 sq ft of gross floor area.
- County Impact Fee (Dorchester County, Commercial)$0.00Dorchester County
Where in Dorchester County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Summerville: Industrial Impact Fees
Industrial development in Summerville pays $0.89 per square foot in impact fees, plus $14,118.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $58,518.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Facility Cost Recovery + Connection Fee — Summerville CPW, $7,313 + $1,000 connection, 1" meter ($8,313.00 one-time), Facility Cost Recovery Fee, Water (Summerville CPW) — 1" meter ($3,225.00 one-time) and Water Service Connection Fee (Summerville CPW) — 1" meter, service installation ($2,580.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Summerville Impact Fee Schedule
- Facility Cost Recovery Fee, Water (Summerville CPW) — 1" meter$3,225.00 one-timeSummerville Commissioners of Public WorksFacility Cost Recovery Fee (water capacity), effective July 1, 2026, by meter size. High-volume users pay 3x the standard fee.
- Water Service Connection Fee (Summerville CPW) — 1" meter, service installation$2,580.00 one-time1", service installationSummerville Commissioners of Public WorksSummerville CPW installs water services of 2 inches or less: $2,580 for a 1-inch service with meter, effective July 1, 2026. Where a service line already exists, only the meter set fee applies (option shown). Services above 2 inches pay $500 plus the cost of the meter and backflow device.
- Sewer Facility Cost Recovery + Connection Fee — Summerville CPW, $7,313 + $1,000 connection, 1" meter$8,313.00 one-timeSummerville CPW, 1"Summerville Commissioners of Public WorksSummerville CPW commercial sewer: a facility cost recovery fee of $7,313 for a 1 inch meter (high-volume users pay three times the standard fee) plus the $1,000 commercial sewer service connection fee, effective July 1, 2026. Parts of Summerville are sewered by the North Charleston Sewer District instead (option shown).
- Public Safety Impact Fee (Town of Summerville, Industrial)$0.57/sq ftTown of SummervilleEffective June 11, 2026. Charged per 1,000 sq ft of gross floor area. Parks & Recreation component is $0 for nonresidential.
- Fire Impact Fee (Town of Summerville, Industrial)$0.32/sq ftTown of SummervilleEffective June 11, 2026. Charged per 1,000 sq ft of gross floor area.
- County Impact Fee (Dorchester County, Industrial)$0.00Dorchester County
Where in Dorchester County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Summerville: Office Impact Fees
Office development in Summerville pays $1.93 per square foot in impact fees, plus $14,118.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 25,000 sq ft building, that comes to about $62,418.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Facility Cost Recovery + Connection Fee — Summerville CPW, $7,313 + $1,000 connection, 1" meter ($8,313.00 one-time), Facility Cost Recovery Fee, Water (Summerville CPW) — 1" meter ($3,225.00 one-time) and Water Service Connection Fee (Summerville CPW) — 1" meter, service installation ($2,580.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Summerville Impact Fee Schedule
- Facility Cost Recovery Fee, Water (Summerville CPW) — 1" meter$3,225.00 one-timeSummerville Commissioners of Public WorksFacility Cost Recovery Fee (water capacity), effective July 1, 2026, by meter size. High-volume users pay 3x the standard fee.
- Water Service Connection Fee (Summerville CPW) — 1" meter, service installation$2,580.00 one-time1", service installationSummerville Commissioners of Public WorksSummerville CPW installs water services of 2 inches or less: $2,580 for a 1-inch service with meter, effective July 1, 2026. Where a service line already exists, only the meter set fee applies (option shown). Services above 2 inches pay $500 plus the cost of the meter and backflow device.
- Sewer Facility Cost Recovery + Connection Fee — Summerville CPW, $7,313 + $1,000 connection, 1" meter$8,313.00 one-timeSummerville CPW, 1"Summerville Commissioners of Public WorksSummerville CPW commercial sewer: a facility cost recovery fee of $7,313 for a 1 inch meter (high-volume users pay three times the standard fee) plus the $1,000 commercial sewer service connection fee, effective July 1, 2026. Parts of Summerville are sewered by the North Charleston Sewer District instead (option shown).
- Public Safety Impact Fee (Town of Summerville, Office)$1.25/sq ftTown of SummervilleEffective June 11, 2026. Charged per 1,000 sq ft of gross floor area. Applies to office & other service uses. Parks & Recreation component is $0 for nonresidential.
- Fire Impact Fee (Town of Summerville, Office)$0.69/sq ftTown of SummervilleEffective June 11, 2026. Charged per 1,000 sq ft of gross floor area. Applies to office & other service uses.
- County Impact Fee (Dorchester County, Office)$0.00Dorchester County
Where in Dorchester County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Summerville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Summerville Impact Fee FAQs
What are the total impact fees for a single-family home in Summerville, South Carolina?
A new single-family home in Summerville pays $16,709.00 per unit in combined impact fees (rates sourced November 19, 2026).
How much are commercial impact fees in Summerville?
Commercial development in Summerville pays $5.93 per square foot in impact fees, plus $14,118.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $310,418.00 for a 50,000 sq ft building.
Does Summerville charge its own impact fees?
Yes. Summerville levies its own municipal impact or utility fees. Dorchester County does not currently add county-level impact fees inside Summerville. The schedule on this page shows every fee that applies to development in Summerville.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Dorchester County impact fees page.