Skip to content
IMPACTFEES.ORG

Summerville, South Carolina Impact Fees

Summerville applies its own fee schedule. Dorchester County does not currently add county-level impact fees inside city limits. A new single-family home pays $16,709.00 per unit (rates sourced ). The full breakdown is below.

Summerville Impact Fees by Project Type

Summerville: Single-Family Impact Fees

A new single-family home in Summerville pays $16,709.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Connection + Facility Cost Recovery Fee — Summerville CPW, $2,200 connection + $2,925 recovery fee ($5,125.00), Parks & Recreation Impact Fee (Town of Summerville) ($3,654.00) and Water Service Connection Fee (Summerville CPW) ($2,595.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Summerville Impact Fee Schedule
Water$3,885.00
  • Water Service Connection Fee (Summerville CPW)
    5/8" service installation
    Summerville Commissioners of Public Works
    Summerville Commissioners of Public Works charges $2,595 to install a new 5/8-inch water service, or $1,020 where the service line already exists and only the meter is set, under its fee schedule updated July 1, 2026. The water Facility Cost Recovery Fee is charged separately. An extra $800 applies if driveway or sidewalk repair is needed.
    $2,595.00
  • Water Facility Cost Recovery Fee (Summerville CPW)
    5/8" meter
    Summerville Commissioners of Public Works
    Summerville Commissioners of Public Works charges new water customers a one-time Facility Cost Recovery Fee by meter size, $1,290 for a standard 5/8-inch residential meter, in addition to the service connection charge. High-volume users pay three times the standard fee.
    $1,290.00
Sewer$5,125.00
City$7,699.00
  • Parks & Recreation Impact Fee (Town of Summerville)
    Town of Summerville
    The Town of Summerville charges a parks and recreation impact fee of $3,654 per single-family home under the impact fee schedule adopted June 11, 2026. It is one of three town impact fees, with public safety ($2,416) and fire ($1,629), for a total of $7,700, paid before the building permit is issued.
    $3,654.00
  • Public Safety Impact Fee (Town of Summerville)
    Town of Summerville
    The Town of Summerville charges a public safety facilities impact fee of $2,416 per single-family home, added in the impact fee schedule adopted June 11, 2026. It replaced the former municipal facilities and equipment fee.
    $2,416.00
  • Fire Protection Impact Fee (Town of Summerville)
    Town of Summerville
    The Town of Summerville charges a fire impact fee of $1,629 per single-family home under the schedule adopted June 11, 2026. Building permits issued before that date kept the earlier rates.
    $1,629.00
County$0.00
Total (Summerville): $16,709.00
Sources last checked Official fee schedules:Summerville Commissioners of Public Works Town of Summerville Dorchester County

Where in Dorchester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Summerville: Multifamily Impact Fees

A new multifamily unit in Summerville pays $13,612.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Connection + Facility Cost Recovery Fee (MF) — Summerville CPW, $2,200 connection + $2,925 recovery fee ($5,125.00), Water Service Connection Fee (Summerville CPW, MF) — 5/8" service installation ($2,595.00) and Parks & Recreation Impact Fee (Town of Summerville, MF) ($2,184.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Summerville Impact Fee Schedule
Water$3,885.00
Sewer$5,125.00
  • Sewer Connection + Facility Cost Recovery Fee (MF) — Summerville CPW, $2,200 connection + $2,925 recovery fee
    Summerville CPW, adjacent gravity or pressure service, 5/8" meter
    Summerville Commissioners of Public Works
    Summerville CPW sewer: $2,200 connection (adjacent gravity or pressure service) plus a $2,925 Facility Cost Recovery Fee for a 5/8 inch meter, effective July 1, 2026. Homes in the North Charleston Sewer District part of the area pay that district's fee instead (option shown). Charged per connection, so a building on one connection pays once.
    $5,125.00
City$4,602.00
  • Parks & Recreation Impact Fee (Town of Summerville, MF)
    Town of Summerville
    The Town of Summerville charges a parks and recreation impact fee of $2,184 per multifamily unit under the schedule adopted June 11, 2026. Public safety ($1,444) and fire ($974) fees also apply, for a total of $4,602 per unit, paid before the building permit is issued.
    $2,184.00
  • Public Safety Impact Fee (Town of Summerville, MF)
    Town of Summerville
    The Town of Summerville charges a public safety facilities impact fee of $1,444 per multifamily unit, added in the schedule adopted June 11, 2026 in place of the former municipal facilities and equipment fee.
    $1,444.00
  • Fire Protection Impact Fee (Town of Summerville, MF)
    Town of Summerville
    The Town of Summerville charges a fire impact fee of $974 per multifamily unit under the schedule adopted June 11, 2026.
    $974.00
County$0.00
Total (Summerville): $13,612.00
Sources last checked Official fee schedules:Summerville Commissioners of Public Works Town of Summerville Dorchester County

Where in Dorchester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Summerville: Commercial Impact Fees

Commercial development in Summerville pays $5.93 per square foot in impact fees, plus $14,118.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).

For a 50,000 sq ft building, that comes to about $310,418.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Facility Cost Recovery + Connection Fee — Summerville CPW, $7,313 + $1,000 connection, 1" meter ($8,313.00 one-time), Facility Cost Recovery Fee, Water (Summerville CPW) — 1" meter ($3,225.00 one-time) and Water Service Connection Fee (Summerville CPW) — 1" meter, service installation ($2,580.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Summerville Impact Fee Schedule
Water$5,805.00 one-time
Sewer$8,313.00 one-time
City$5.93/sq ft
County$0.00
Total (Summerville): $5.93/sq ft + $14,118.00 one-time (≈ $310,418.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Summerville Commissioners of Public Works Town of Summerville Dorchester County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dorchester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Summerville: Industrial Impact Fees

Industrial development in Summerville pays $0.89 per square foot in impact fees, plus $14,118.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).

For a 50,000 sq ft building, that comes to about $58,518.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Facility Cost Recovery + Connection Fee — Summerville CPW, $7,313 + $1,000 connection, 1" meter ($8,313.00 one-time), Facility Cost Recovery Fee, Water (Summerville CPW) — 1" meter ($3,225.00 one-time) and Water Service Connection Fee (Summerville CPW) — 1" meter, service installation ($2,580.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Summerville Impact Fee Schedule
Water$5,805.00 one-time
Sewer$8,313.00 one-time
City$0.89/sq ft
County$0.00
Total (Summerville): $0.89/sq ft + $14,118.00 one-time (≈ $58,518.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Summerville Commissioners of Public Works Town of Summerville Dorchester County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dorchester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Summerville: Office Impact Fees

Office development in Summerville pays $1.93 per square foot in impact fees, plus $14,118.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).

For a 25,000 sq ft building, that comes to about $62,418.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Facility Cost Recovery + Connection Fee — Summerville CPW, $7,313 + $1,000 connection, 1" meter ($8,313.00 one-time), Facility Cost Recovery Fee, Water (Summerville CPW) — 1" meter ($3,225.00 one-time) and Water Service Connection Fee (Summerville CPW) — 1" meter, service installation ($2,580.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Summerville Impact Fee Schedule
Water$5,805.00 one-time
Sewer$8,313.00 one-time
City$1.93/sq ft
County$0.00
Total (Summerville): $1.93/sq ft + $14,118.00 one-time (≈ $62,418.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Summerville Commissioners of Public Works Town of Summerville Dorchester County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dorchester County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Summerville Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Summerville Impact Fee FAQs

What are the total impact fees for a single-family home in Summerville, South Carolina?

A new single-family home in Summerville pays $16,709.00 per unit in combined impact fees (rates sourced November 19, 2026).

How much are commercial impact fees in Summerville?

Commercial development in Summerville pays $5.93 per square foot in impact fees, plus $14,118.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $310,418.00 for a 50,000 sq ft building.

Does Summerville charge its own impact fees?

Yes. Summerville levies its own municipal impact or utility fees. Dorchester County does not currently add county-level impact fees inside Summerville. The schedule on this page shows every fee that applies to development in Summerville.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Dorchester County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000