St. George Impact Fees by Project Type
St. George: Single-Family Impact Fees
A new single-family home in St. George pays $15,010.00 per unit in impact fees (rates sourced November 19, 2026). Of that, Dorchester County-levied fees account for $9,010.00 and municipal or utility fees for $6,000.00.
The largest line items are Sewer Impact Fee (Dorchester County Water & Sewer) ($6,510.00) and Sewer Connection Fee (Dorchester County Water & Sewer) ($2,500.00).
Water Impact Fee (Town of St. George) and Water Tap Fee (Town of St. George) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full St. George Impact Fee Schedule
- Water Impact Fee (Town of St. George)$3,500.00Requires confirmation3/4" meterTown of St. GeorgeThe Town of St. George charges a water impact fee of $3,500 for an in-town 3/4-inch meter, in addition to the water tapping fee. Larger meters pay more (up to $8,000 for a 6-inch meter), and out-of-town service pays double.
- Water Tap Fee (Town of St. George)$2,500.00Requires confirmation3/4" meterTown of St. GeorgeThe Town of St. George provides water service in town. Its code sets a water tapping fee of $2,500 for an in-town 3/4-inch meter, separate from its $3,500 water impact fee, with higher fees for larger meters and out-of-town service. If installing the tap costs the town more than the fee, the excess is billed to the customer, and the fee can be paid half up front with the rest over up to 12 months.
- Sewer Impact Fee (Dorchester County Water & Sewer)$6,510.00Dorchester County Water & SewerSewer in St. George is provided by Dorchester County Water & Sewer from its Upper treatment plant, not by the town. The county charges a sewer impact fee of $6,510 per equivalent residential unit; a single-family home counts as one unit.
- Sewer Connection Fee (Dorchester County Water & Sewer)$2,500.004" tapDorchester County Water & SewerSewer in St. George is provided by Dorchester County Water & Sewer, which charges a one-time sewer connection (tap) fee of $2,500 for a 4-inch tap, the standard single-family size, or $5,375 for a larger tap, due before the building permit is issued.
- City Development Impact Fee — None Levied (Town of St. George)$0.00Town of St. GeorgeThe Town of St. George does not charge development impact fees for roads, parks, public safety or other general facilities. Its only impact fee is the water impact fee charged with a new water tap, listed under water.
- County Development Impact Fee — None Levied (Dorchester County)$0.00Dorchester CountyDorchester County does not charge a development impact fee, inside towns or in the unincorporated area. It repealed its 2010 transportation impact fee in 2018.
Where in Dorchester County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. George: Multifamily Impact Fees
A new multifamily unit in St. George pays $15,036.88 per unit in impact fees (rates sourced November 19, 2026). Of that, Dorchester County-levied fees account for $9,036.88 and municipal or utility fees for $6,000.00.
The largest line items are Sewer Connection Fee (Dorchester County Water & Sewer, MF) ($5,375.00) and Sewer Impact Fee (Dorchester County Water & Sewer, MF) — 0.5625 ERU × $6,510/ERU (Upper WWTP) ($3,661.88).
Water Impact Fee (Town of St. George, MF) and Water Tap Fee (Town of St. George, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full St. George Impact Fee Schedule
- Water Impact Fee (Town of St. George, MF)$3,500.00Requires confirmationTown of St. GeorgeThe Town of St. George charges multi-unit buildings on 3/4-inch lines a water impact fee of $3,500 per unit, in addition to the $2,500 per unit tapping fee.
- Water Tap Fee (Town of St. George, MF)$2,500.00Requires confirmationTown of St. GeorgeThe Town of St. George charges multi-unit buildings on 3/4-inch lines a water tapping fee of $2,500 per unit, plus a separate water impact fee of $3,500 per unit. Town code requires a separate water meter for each dwelling.
- Sewer Connection Fee (Dorchester County Water & Sewer, MF)$5,375.00Dorchester County Water & SewerSewer in St. George is provided by Dorchester County Water & Sewer, which charges its sewer connection (tap) fee per connection, not per apartment. Apartment buildings need a tap larger than 4 inches under county code, which costs $5,375; a building on one connection pays it once. A separate sewer impact fee applies per unit.
- Sewer Impact Fee (Dorchester County Water & Sewer, MF) — 0.5625 ERU × $6,510/ERU (Upper WWTP)$3,661.88Dorchester County Water & SewerSewer in St. George is provided by Dorchester County Water & Sewer (Upper plant area), which charges $6,510 per equivalent residential unit of 400 gallons per day. Apartments are sized by state flow standards, so a two-bedroom unit counts as 0.5625 unit.
- City Development Impact Fee — None Levied (Town of St. George, MF)$0.00Town of St. GeorgeThe Town of St. George does not charge development impact fees for roads, parks, public safety or other general facilities. Its only impact fee is the water impact fee charged per unit with new water taps, listed under water.
- County Development Impact Fee — None Levied (Dorchester County, MF)$0.00Dorchester CountyDorchester County does not charge a development impact fee, inside towns or in the unincorporated area. It repealed its 2010 transportation impact fee in 2018.
Where in Dorchester County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. George: Commercial Impact Fees
Commercial development in St. George pays no per-square-foot impact fees, but owes $15,660.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $15,660.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee — Dorchester County Water and Sewer, 1 ERU minimum × $6,510/ERU ($6,510.00 one-time) and Sewer Connection Fee — Dorchester County Water and Sewer, 4" line ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (Town of St. George) — 1" meter and Water Tap Fee (Town of St. George) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full St. George Impact Fee Schedule
- Water Impact Fee (Town of St. George) — 1" meter$3,500.00 one-timeRequires confirmationTown of St. GeorgeTown of St. George water impact fee for a 1 inch meter inside the town: $3,500, paid with the tap fee.
- Water Tap Fee (Town of St. George) — 1" meter$3,150.00 one-timeRequires confirmationTown of St. GeorgeTown of St. George water tap fee for a 1 inch meter inside the town: $3,150, paid with the water impact fee. A 6-inch fire suppression line is priced separately.
- Sewer Impact Fee — Dorchester County Water and Sewer, 1 ERU minimum × $6,510/ERU$6,510.00 one-timeDorchester County Water and SewerSewer in St. George is provided by Dorchester County Water and Sewer (Upper plant): a $6,510 impact fee per equivalent residential unit (at least one unit, 250 gallons per day each) plus a connection fee.
- Sewer Connection Fee — Dorchester County Water and Sewer, 4" line$2,500.00 one-timeDorchester County Water and SewerDorchester County Water and Sewer sewer connection fee: $2,500 for a 4-inch line, paid with the sewer impact fee.
- City Impact Fee (Town of St. George, Commercial)$0.00Town of St. George
- County Impact Fee (Dorchester County, Commercial)$0.00Dorchester County
Where in Dorchester County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. George: Industrial Impact Fees
Industrial development in St. George pays no per-square-foot impact fees, but owes $15,660.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $15,660.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee — Dorchester County Water and Sewer, 1 ERU minimum × $6,510/ERU ($6,510.00 one-time) and Sewer Connection Fee — Dorchester County Water and Sewer, 4" line ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (Town of St. George) — 1" meter and Water Tap Fee (Town of St. George) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full St. George Impact Fee Schedule
- Water Impact Fee (Town of St. George) — 1" meter$3,500.00 one-timeRequires confirmationTown of St. GeorgeTown of St. George water impact fee for a 1 inch meter inside the town: $3,500, paid with the tap fee.
- Water Tap Fee (Town of St. George) — 1" meter$3,150.00 one-timeRequires confirmationTown of St. GeorgeTown of St. George water tap fee for a 1 inch meter inside the town: $3,150, paid with the water impact fee. A 6-inch fire suppression line is priced separately.
- Sewer Impact Fee — Dorchester County Water and Sewer, 1 ERU minimum × $6,510/ERU$6,510.00 one-timeDorchester County Water and SewerSewer in St. George is provided by Dorchester County Water and Sewer (Upper plant): a $6,510 impact fee per equivalent residential unit (at least one unit, 250 gallons per day each) plus a connection fee.
- Sewer Connection Fee — Dorchester County Water and Sewer, 4" line$2,500.00 one-timeDorchester County Water and SewerDorchester County Water and Sewer sewer connection fee: $2,500 for a 4-inch line, paid with the sewer impact fee.
- City Impact Fee (Town of St. George, Industrial)$0.00Town of St. George
- County Impact Fee (Dorchester County, Industrial)$0.00Dorchester County
Where in Dorchester County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. George: Office Impact Fees
Office development in St. George pays no per-square-foot impact fees, but owes $15,660.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 25,000 sq ft building, that comes to about $15,660.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee — Dorchester County Water and Sewer, 1 ERU minimum × $6,510/ERU ($6,510.00 one-time) and Sewer Connection Fee — Dorchester County Water and Sewer, 4" line ($2,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (Town of St. George) — 1" meter and Water Tap Fee (Town of St. George) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full St. George Impact Fee Schedule
- Water Impact Fee (Town of St. George) — 1" meter$3,500.00 one-timeRequires confirmationTown of St. GeorgeTown of St. George water impact fee for a 1 inch meter inside the town: $3,500, paid with the tap fee.
- Water Tap Fee (Town of St. George) — 1" meter$3,150.00 one-timeRequires confirmationTown of St. GeorgeTown of St. George water tap fee for a 1 inch meter inside the town: $3,150, paid with the water impact fee. A 6-inch fire suppression line is priced separately.
- Sewer Impact Fee — Dorchester County Water and Sewer, 1 ERU minimum × $6,510/ERU$6,510.00 one-timeDorchester County Water and SewerSewer in St. George is provided by Dorchester County Water and Sewer (Upper plant): a $6,510 impact fee per equivalent residential unit (at least one unit, 250 gallons per day each) plus a connection fee.
- Sewer Connection Fee — Dorchester County Water and Sewer, 4" line$2,500.00 one-timeDorchester County Water and SewerDorchester County Water and Sewer sewer connection fee: $2,500 for a 4-inch line, paid with the sewer impact fee.
- City Impact Fee (Town of St. George, Office)$0.00Town of St. George
- County Impact Fee (Dorchester County, Office)$0.00Dorchester County
Where in Dorchester County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. George Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
St. George Impact Fee FAQs
What are the total impact fees for a single-family home in St. George, South Carolina?
A new single-family home in St. George pays $15,010.00 per unit in combined impact fees (rates sourced November 19, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in St. George?
Commercial development in St. George pays no per-square-foot impact fees, but owes $15,660.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does St. George charge its own impact fees?
Yes. St. George levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in St. George, with the combined total.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Dorchester County impact fees page.