Florence Impact Fees by Project Type
Florence: Single-Family Impact Fees
A new single-family home in Florence pays $2,410.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee + Contributory Demand Charge (City of Florence) — 3/4" city-installed tap + 300 gpd × $0.60/gpd ($1,680.00) and Sewer Tap Fee + Contributory Demand Charge (City of Florence) — 4" city-installed tap + 300 gpd × $0.60/gpd ($730.00).
View the Full Florence Impact Fee Schedule
- Water Tap Fee + Contributory Demand Charge (City of Florence) — 3/4" city-installed tap + 300 gpd × $0.60/gpd$1,680.00City of Florence Utilities DepartmentInside the City of Florence, a city-installed 3/4 inch water tap costs $1,680: a $1,500 tap plus a contributory demand charge of $0.60 per gallon per day on 300 gallons per day for a house. If the owner's licensed utility contractor makes the tap, the charge is $580.
- Sewer Tap Fee + Contributory Demand Charge (City of Florence) — 4" city-installed tap + 300 gpd × $0.60/gpd$730.00City of Florence Utilities DepartmentInside the City of Florence, a city-installed 4 inch sewer tap costs $730: a $550 tap plus a connection fee of $0.60 per gallon per day on 300 gallons per day for a house. A tap made by the owner's licensed contractor pays only the $180 connection fee.
- Municipal Impact Fee (City of Florence)$0.00City of FlorenceThe City of Florence has not adopted a development impact fee. Its one-time growth charge is the water and sewer contributory demand charge shown with the utility fees.
- County Impact Fee (Florence County)$0.00Florence CountyFlorence County has not adopted a development impact fee under the South Carolina Development Impact Fee Act, and its adopted budget carries no impact fee revenue.
Where in Florence County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florence: Multifamily Impact Fees
A new multifamily unit in Florence pays $270.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Connection Fee (City of Florence, MF) — 225 gpd/unit × $0.60/gpd ($135.00) and Water Contributory Demand Charge (City of Florence, MF) — 225 gpd/unit × $0.60/gpd ($135.00).
View the Full Florence Impact Fee Schedule
- Water Contributory Demand Charge (City of Florence, MF) — 225 gpd/unit × $0.60/gpd$135.00City of Florence Utilities DepartmentCharged per apartment inside the City of Florence: 225 gallons per day for a two-bedroom unit at $0.60 per gallon per day. The building's water tap is charged once per building by meter size (multiunit buildings need at least a 6 inch connection, $21,800 city-installed inside the city) and is not included.
- Sewer Connection Fee (City of Florence, MF) — 225 gpd/unit × $0.60/gpd$135.00City of Florence Utilities DepartmentCharged per apartment inside the City of Florence: a connection fee of $0.60 per gallon per day on 225 gallons per day for a two-bedroom unit. The building's sewer tap (6 inch minimum) is charged once per building and is not included.
- Municipal Impact Fee (City of Florence, MF)$0.00City of FlorenceThe City of Florence has not adopted a development impact fee. Its one-time growth charge is the water and sewer contributory demand charge shown with the utility fees.
- County Impact Fee (Florence County, MF)$0.00Florence CountyFlorence County has not adopted a development impact fee under the South Carolina Development Impact Fee Act, and its adopted budget carries no impact fee revenue.
Where in Florence County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florence: Commercial Impact Fees
Commercial development in Florence pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to at least $2,850.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Florence) — 1" meter, city-installed ($2,300.00 one-time) and Sewer Tap Fee (City of Florence) — 4" tap, city-installed ($550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Contributory Demand Charge (City of Florence) — per gallon per day and Sewer Connection Fee (City of Florence) — per gallon per day are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Florence Impact Fee Schedule
- Water Tap Fee (City of Florence) — 1" meter, city-installed$2,300.00 one-time1", city-installedCity of Florence UtilitiesInside the City of Florence, a 1 inch water tap installed by the city (tap, meter box and piping) costs $2,300; larger meters run from $4,200 (1-1/2 inch) to $33,100 (8 inch). A contributory demand charge of $0.60 per gallon per day of estimated flow is added, and the city adds its extra cost where a tap must cross or bore under a street.
- Water Contributory Demand Charge (City of Florence) — per gallon per dayContact jurisdiction/utility to verifyCity of Florence UtilitiesInside the City of Florence, a new water connection also pays $0.60 per gallon per day of estimated flow from the city's loading chart (for example 200 gallons per day per 1,000 sq ft of shopping center space, or 19 gallons per day per office worker), whoever installs the tap.
- Sewer Tap Fee (City of Florence) — 4" tap, city-installed$550.00 one-timeCity of Florence UtilitiesInside the City of Florence, a 4 inch sewer tap made by the city costs $550; 6 and 8 inch taps cost $2,000 to $6,000 depending on size and whether a manhole is needed. A connection fee of $0.60 per gallon per day of estimated flow is added, and the city adds its extra cost where a tap must cross a street or reach a main deeper than six feet.
- Sewer Connection Fee (City of Florence) — per gallon per dayContact jurisdiction/utility to verifyCity of Florence UtilitiesInside the City of Florence, every new sewer connection pays $0.60 per gallon per day of estimated flow from the city's loading chart (for example 200 gallons per day per 1,000 sq ft of shopping center space, or 19 gallons per day per office worker), on top of any city tap charge.
- City Impact Fee (City of Florence, Commercial)$0.00City of FlorenceThe City of Florence has not adopted a development impact fee. Its one-time growth charges are the per-gallon water and sewer connection charges listed with the utility fees.
- County Impact Fee (Florence County, Commercial)$0.00Florence CountyFlorence County has not adopted a development impact fee under the South Carolina Development Impact Fee Act, and its adopted budget carries no impact fee revenue.
Where in Florence County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florence: Industrial Impact Fees
Industrial development in Florence pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to at least $2,850.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Florence) — 1" meter, city-installed ($2,300.00 one-time) and Sewer Tap Fee (City of Florence) — 4" tap, city-installed ($550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Contributory Demand Charge (City of Florence) — per gallon per day and Sewer Connection Fee (City of Florence) — per gallon per day are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Florence Impact Fee Schedule
- Water Tap Fee (City of Florence) — 1" meter, city-installed$2,300.00 one-time1", city-installedCity of Florence UtilitiesInside the City of Florence, a 1 inch water tap installed by the city (tap, meter box and piping) costs $2,300; larger meters run from $4,200 (1-1/2 inch) to $33,100 (8 inch). A contributory demand charge of $0.60 per gallon per day of estimated flow is added, and the city adds its extra cost where a tap must cross or bore under a street.
- Water Contributory Demand Charge (City of Florence) — per gallon per dayContact jurisdiction/utility to verifyCity of Florence UtilitiesInside the City of Florence, a new water connection also pays $0.60 per gallon per day of estimated flow from the city's loading chart (for example 200 gallons per day per 1,000 sq ft of shopping center space, or 19 gallons per day per office worker), whoever installs the tap.
- Sewer Tap Fee (City of Florence) — 4" tap, city-installed$550.00 one-timeCity of Florence UtilitiesInside the City of Florence, a 4 inch sewer tap made by the city costs $550; 6 and 8 inch taps cost $2,000 to $6,000 depending on size and whether a manhole is needed. A connection fee of $0.60 per gallon per day of estimated flow is added, and the city adds its extra cost where a tap must cross a street or reach a main deeper than six feet.
- Sewer Connection Fee (City of Florence) — per gallon per dayContact jurisdiction/utility to verifyCity of Florence UtilitiesInside the City of Florence, every new sewer connection pays $0.60 per gallon per day of estimated flow from the city's loading chart (for example 200 gallons per day per 1,000 sq ft of shopping center space, or 19 gallons per day per office worker), on top of any city tap charge.
- City Impact Fee (City of Florence, Industrial)$0.00City of FlorenceThe City of Florence has not adopted a development impact fee. Its one-time growth charges are the per-gallon water and sewer connection charges listed with the utility fees.
- County Impact Fee (Florence County, Industrial)$0.00Florence CountyFlorence County has not adopted a development impact fee under the South Carolina Development Impact Fee Act, and its adopted budget carries no impact fee revenue.
Where in Florence County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florence: Office Impact Fees
Office development in Florence pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 25,000 sq ft building, that comes to at least $2,850.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Florence) — 1" meter, city-installed ($2,300.00 one-time) and Sewer Tap Fee (City of Florence) — 4" tap, city-installed ($550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Contributory Demand Charge (City of Florence) — per gallon per day and Sewer Connection Fee (City of Florence) — per gallon per day are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Florence Impact Fee Schedule
- Water Tap Fee (City of Florence) — 1" meter, city-installed$2,300.00 one-time1", city-installedCity of Florence UtilitiesInside the City of Florence, a 1 inch water tap installed by the city (tap, meter box and piping) costs $2,300; larger meters run from $4,200 (1-1/2 inch) to $33,100 (8 inch). A contributory demand charge of $0.60 per gallon per day of estimated flow is added, and the city adds its extra cost where a tap must cross or bore under a street.
- Water Contributory Demand Charge (City of Florence) — per gallon per dayContact jurisdiction/utility to verifyCity of Florence UtilitiesInside the City of Florence, a new water connection also pays $0.60 per gallon per day of estimated flow from the city's loading chart (for example 200 gallons per day per 1,000 sq ft of shopping center space, or 19 gallons per day per office worker), whoever installs the tap.
- Sewer Tap Fee (City of Florence) — 4" tap, city-installed$550.00 one-timeCity of Florence UtilitiesInside the City of Florence, a 4 inch sewer tap made by the city costs $550; 6 and 8 inch taps cost $2,000 to $6,000 depending on size and whether a manhole is needed. A connection fee of $0.60 per gallon per day of estimated flow is added, and the city adds its extra cost where a tap must cross a street or reach a main deeper than six feet.
- Sewer Connection Fee (City of Florence) — per gallon per dayContact jurisdiction/utility to verifyCity of Florence UtilitiesInside the City of Florence, every new sewer connection pays $0.60 per gallon per day of estimated flow from the city's loading chart (for example 200 gallons per day per 1,000 sq ft of shopping center space, or 19 gallons per day per office worker), on top of any city tap charge.
- City Impact Fee (City of Florence, Office)$0.00City of FlorenceThe City of Florence has not adopted a development impact fee. Its one-time growth charges are the per-gallon water and sewer connection charges listed with the utility fees.
- County Impact Fee (Florence County, Office)$0.00Florence CountyFlorence County has not adopted a development impact fee under the South Carolina Development Impact Fee Act, and its adopted budget carries no impact fee revenue.
Where in Florence County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florence Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Florence Impact Fee FAQs
What are the total impact fees for a single-family home in Florence, South Carolina?
A new single-family home in Florence pays $2,410.00 per unit in combined impact fees (rates sourced November 11, 2026).
How much are commercial impact fees in Florence?
Commercial development in Florence pays no per-square-foot impact fees, but owes $2,850.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Florence charge its own impact fees?
Yes. Florence levies its own municipal impact or utility fees. Florence County does not currently add county-level impact fees inside Florence. The schedule on this page shows every fee that applies to development in Florence.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.