Greenwood County Impact Fees by Project Type
Where in Greenwood County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Greenwood County: Single-Family Impact Fees
A new single-family home in unincorporated Greenwood County pays $6,600.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (Greenwood Metropolitan District) ($2,500.00), Water Tap Fee (Greenwood CPW, Rural) — 3/4" meter ($2,250.00) and Sewer Connection Fee (Greenwood Metropolitan District) ($1,100.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Greenwood County Impact Fee Schedule
- Water Tap Fee (Greenwood CPW, Rural) — 3/4" meter$2,250.00Greenwood Commissioners of Public Works (CPW)Greenwood CPW charges $2,250 to install a standard 3/4-inch water tap and $2,490 for a 1-inch tap (Miscellaneous Services Fee Tariffs, effective January 1, 2026). Inside-city and rural taps cost the same. Charged in addition to the water capacity fee.
- Water Capacity Fee (Greenwood CPW) — 5/8" meter$750.00Greenwood Commissioners of Public Works (CPW)Greenwood CPW water capacity fee under its Water Capacity Fee Tariff (effective August 1, 2010). A standard home on a 5/8-inch meter is 1 equivalent residential unit at $750; larger meters pay more, from $1,875 for a 1-inch meter to $60,000 for an 8-inch meter. Due when water service is requested, in addition to the tap fee.
- Sewer Impact Fee (Greenwood Metropolitan District)$2,500.00Greenwood Metropolitan District (GMD)Greenwood Metropolitan District sewer impact fee of $2,500 per residential equivalent unit (300 gallons per day), effective July 1, 2025 (was $2,300). The minimum fee is $2,500. Applies only where district sewer is available; homes outside the district use septic systems and pay no sewer fee.
- Sewer Connection Fee (Greenwood Metropolitan District)$1,100.00Greenwood Metropolitan District (GMD)Greenwood Metropolitan District charges a $1,100 connection fee on every new sewer connection, in addition to its sewer impact fee. A $125 new-construction inspection fee also applies.
- City Impact Fee (Greenwood County - Unincorporated)$0.00N/A - UnincorporatedNo municipal impact fee applies in unincorporated Greenwood County. Building permits are issued by the joint Greenwood City/County Building Department, whose fee schedule has no impact fee.
- County Impact Fee (Greenwood County)$0.00Greenwood CountyGreenwood County does not charge a development impact fee. The county runs no water or sewer utility and funds capital projects through its 2016 Capital Project Sales Tax.
Where in Greenwood County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Greenwood County: Multifamily Impact Fees
A new multifamily unit in unincorporated Greenwood County pays $5,787.50 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (Greenwood CPW, Rural, MF) ($2,250.00) and Sewer Connection Fee (Greenwood Metropolitan District, MF) ($1,100.00).
Water Capacity Fee (Greenwood CPW, MF) — 0.75 ERU × $750/ERU and Sewer Impact Fee (Greenwood Metropolitan District, MF) — 0.75 REU × $2,500/REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Greenwood County Impact Fee Schedule
- Water Tap Fee (Greenwood CPW, Rural, MF)$2,250.00Greenwood Commissioners of Public Works (CPW)Greenwood CPW charges water taps per connection: $2,250 for a 3/4-inch tap and $2,490 for a 1-inch tap. A multifamily building on a single tap pays once; larger master-meter taps are priced by CPW.
- Water Capacity Fee (Greenwood CPW, MF) — 0.75 ERU × $750/ERU$562.50Requires confirmationGreenwood Commissioners of Public Works (CPW)Greenwood CPW normally sets its water capacity fee by meter size ($750 for a 5/8-inch meter up to $60,000 for an 8-inch meter). This per-unit figure uses the tariff's alternative flow method at 0.75 equivalent unit per apartment, which CPW applies on its Water Utilities Director's recommendation; otherwise a master-metered building pays by the size of its meter.
- Sewer Impact Fee (Greenwood Metropolitan District, MF) — 0.75 REU × $2,500/REU$1,875.00Requires confirmationGreenwood Metropolitan District (GMD)Greenwood Metropolitan District charges its sewer impact fee by expected flow at $2,500 per 300 gallons per day. This per-unit figure assumes a two-bedroom apartment at 225 gallons per day (0.75 unit) under South Carolina wastewater flow guidelines; the District sets each project's charge, with a $2,500 minimum per connection.
- Sewer Connection Fee (Greenwood Metropolitan District, MF)$1,100.00Greenwood Metropolitan District (GMD)Greenwood Metropolitan District charges its $1,100 sewer connection fee per connection, not per apartment. A multifamily building on a single sewer connection pays it once.
- City Impact Fee (Greenwood County - Unincorporated, MF)$0.00N/A - UnincorporatedNo municipal impact fee applies in unincorporated Greenwood County. Building permits are issued by the joint Greenwood City/County Building Department, whose fee schedule has no impact fee.
- County Impact Fee (Greenwood County, MF)$0.00Greenwood CountyGreenwood County does not charge a development impact fee. The county runs no water or sewer utility and funds capital projects through its 2016 Capital Project Sales Tax.
Where in Greenwood County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Greenwood County: Commercial Impact Fees
Commercial development in unincorporated Greenwood County pays no per-square-foot impact fees, but owes $7,965.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $7,965.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Greenwood Metropolitan District, Greenwood County - Unincorporated) ($2,500.00 one-time), Water Tap Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter ($2,490.00 one-time) and Water Capacity Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter ($1,875.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Greenwood County Impact Fee Schedule
- Water Tap Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter$2,490.00 one-timeGreenwood CPW water tap fee, effective 1/1/2026. Charged in addition to the water capacity fee. Published for 3/4" and 1" meters; larger commercial taps individually quoted.
- Water Capacity Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter$1,875.00 one-timeGreenwood CPW water capacity fee by meter size (AWWA equivalency), effective 8/1/2010. Separate from and additional to the water tap fee.
- Sewer Impact Fee (Greenwood Metropolitan District, Greenwood County - Unincorporated)$2,500.00 one-timeGreenwood Metropolitan District sewer impact fee, $2,500 per REU (1 REU = 300 gallons/day discharge), effective 7/1/2025; minimum $2,500. Applies where GMD sewer is available; unsewered rural parcels use septic. Commercial fees calculated on expected discharge at $2,500 per 300 gpd. Separate from the $1,100 connection fee.
- Sewer Connection Fee (Greenwood Metropolitan District, Greenwood County - Unincorporated)$1,100.00 one-timeGreenwood Metropolitan District sewer connection fee, $1,100 flat on all new connections where GMD sewer is available. Separate from the per-REU impact fee.
- City Impact Fee (Greenwood County - Unincorporated, Commercial)$0.00No municipal development impact fee applies in unincorporated Greenwood County.
- County Impact Fee (Greenwood County, Commercial)$0.00Greenwood County does not levy a development impact fee.
Where in Greenwood County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Greenwood County: Industrial Impact Fees
Industrial development in unincorporated Greenwood County pays no per-square-foot impact fees, but owes $7,965.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $7,965.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Greenwood Metropolitan District, Greenwood County - Unincorporated) ($2,500.00 one-time), Water Tap Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter ($2,490.00 one-time) and Water Capacity Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter ($1,875.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Greenwood County Impact Fee Schedule
- Water Tap Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter$2,490.00 one-timeGreenwood CPW water tap fee, effective 1/1/2026. Charged in addition to the water capacity fee. Published for 3/4" and 1" meters; larger commercial taps individually quoted.
- Water Capacity Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter$1,875.00 one-timeGreenwood CPW water capacity fee by meter size (AWWA equivalency), effective 8/1/2010. Separate from and additional to the water tap fee.
- Sewer Impact Fee (Greenwood Metropolitan District, Greenwood County - Unincorporated)$2,500.00 one-timeGreenwood Metropolitan District sewer impact fee, $2,500 per REU (1 REU = 300 gallons/day discharge), effective 7/1/2025; minimum $2,500. Applies where GMD sewer is available; unsewered rural parcels use septic. Commercial fees calculated on expected discharge at $2,500 per 300 gpd. Separate from the $1,100 connection fee.
- Sewer Connection Fee (Greenwood Metropolitan District, Greenwood County - Unincorporated)$1,100.00 one-timeGreenwood Metropolitan District sewer connection fee, $1,100 flat on all new connections where GMD sewer is available. Separate from the per-REU impact fee.
- City Impact Fee (Greenwood County - Unincorporated, Industrial)$0.00No municipal development impact fee applies in unincorporated Greenwood County.
- County Impact Fee (Greenwood County, Industrial)$0.00Greenwood County does not levy a development impact fee.
Where in Greenwood County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Greenwood County: Office Impact Fees
Office development in unincorporated Greenwood County pays no per-square-foot impact fees, but owes $7,965.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 25,000 sq ft building, that comes to about $7,965.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (Greenwood Metropolitan District, Greenwood County - Unincorporated) ($2,500.00 one-time), Water Tap Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter ($2,490.00 one-time) and Water Capacity Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter ($1,875.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Greenwood County Impact Fee Schedule
- Water Tap Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter$2,490.00 one-timeGreenwood CPW water tap fee, effective 1/1/2026. Charged in addition to the water capacity fee. Published for 3/4" and 1" meters; larger commercial taps individually quoted.
- Water Capacity Fee (Greenwood CPW, Greenwood County - Unincorporated) — 1" meter$1,875.00 one-timeGreenwood CPW water capacity fee by meter size (AWWA equivalency), effective 8/1/2010. Separate from and additional to the water tap fee.
- Sewer Impact Fee (Greenwood Metropolitan District, Greenwood County - Unincorporated)$2,500.00 one-timeGreenwood Metropolitan District sewer impact fee, $2,500 per REU (1 REU = 300 gallons/day discharge), effective 7/1/2025; minimum $2,500. Applies where GMD sewer is available; unsewered rural parcels use septic. Commercial fees calculated on expected discharge at $2,500 per 300 gpd. Separate from the $1,100 connection fee.
- Sewer Connection Fee (Greenwood Metropolitan District, Greenwood County - Unincorporated)$1,100.00 one-timeGreenwood Metropolitan District sewer connection fee, $1,100 flat on all new connections where GMD sewer is available. Separate from the per-REU impact fee.
- City Impact Fee (Greenwood County - Unincorporated, Office)$0.00No municipal development impact fee applies in unincorporated Greenwood County.
- County Impact Fee (Greenwood County, Office)$0.00Greenwood County does not levy a development impact fee.
Greenwood County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Greenwood County Impact Fee FAQs
What are single-family impact fees in Greenwood County, South Carolina?
A new single-family home in unincorporated Greenwood County pays $6,600.00 per unit in impact fees (rates sourced November 11, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Greenwood County?
Multifamily development in unincorporated Greenwood County pays $5,787.50 per unit in impact fees (rates sourced November 11, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Greenwood County?
Commercial development in unincorporated Greenwood County pays no per-square-foot impact fees, but owes $7,965.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Do cities in Greenwood County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 3 of 5 cities in Greenwood County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.