Skip to content
IMPACTFEES.ORG

Greenwood, South Carolina Impact Fees

Greenwood applies its own fee schedule. Greenwood County does not currently add county-level impact fees inside city limits. A new single-family home pays $6,600.00 per unit (rates sourced ). The full breakdown is below.

Greenwood Impact Fees by Project Type

Greenwood: Single-Family Impact Fees

A new single-family home in Greenwood pays $6,600.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (Greenwood Metropolitan District) ($2,500.00), Water Tap Fee (Greenwood CPW) — 3/4" meter ($2,250.00) and Sewer Connection Fee (Greenwood Metropolitan District) ($1,100.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Greenwood Impact Fee Schedule
Water$3,000.00
  • Water Tap Fee (Greenwood CPW) — 3/4" meter
    Greenwood Commissioners of Public Works (CPW)
    Greenwood CPW charges $2,250 to install a standard 3/4-inch water tap and $2,490 for a 1-inch tap (Miscellaneous Services Fee Tariffs, effective January 1, 2026). Inside-city and rural taps cost the same. Charged in addition to the water capacity fee.
    $2,250.00
  • Water Capacity Fee (Greenwood CPW) — 5/8" meter
    Greenwood Commissioners of Public Works (CPW)
    Greenwood CPW water capacity fee under its Water Capacity Fee Tariff (effective August 1, 2010). A standard home on a 5/8-inch meter is 1 equivalent residential unit at $750; larger meters pay more, from $1,875 for a 1-inch meter to $60,000 for an 8-inch meter. Due when water service is requested, in addition to the tap fee.
    $750.00
Sewer$3,600.00
  • Sewer Impact Fee (Greenwood Metropolitan District)
    Greenwood Metropolitan District (GMD)
    Greenwood Metropolitan District sewer impact fee of $2,500 per residential equivalent unit (300 gallons per day), effective July 1, 2025 (was $2,300). The minimum fee is $2,500.
    $2,500.00
  • Sewer Connection Fee (Greenwood Metropolitan District)
    Greenwood Metropolitan District (GMD)
    Greenwood Metropolitan District charges a $1,100 connection fee on every new sewer connection, in addition to its sewer impact fee. A $125 new-construction inspection fee also applies.
    $1,100.00
City$0.00
  • City Impact Fee (City of Greenwood)
    City of Greenwood
    The City of Greenwood does not charge a development impact fee. Water service comes from Greenwood CPW and sewer from the Greenwood Metropolitan District, which charge their own fees.
    $0.00
County$0.00
  • County Impact Fee (Greenwood County)
    Greenwood County
    Greenwood County does not charge a development impact fee. The county runs no water or sewer utility and funds capital projects through its 2016 Capital Project Sales Tax.
    $0.00
Total (Greenwood): $6,600.00

Where in Greenwood County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Greenwood: Multifamily Impact Fees

A new multifamily unit in Greenwood pays $5,787.50 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap Fee (Greenwood CPW, MF) ($2,250.00) and Sewer Connection Fee (Greenwood Metropolitan District, MF) ($1,100.00).

Water Capacity Fee (Greenwood CPW, MF) — 0.75 ERU × $750/ERU and Sewer Impact Fee (Greenwood Metropolitan District, MF) — 0.75 REU × $2,500/REU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Greenwood Impact Fee Schedule
Water$2,812.50
  • Water Tap Fee (Greenwood CPW, MF)
    Greenwood Commissioners of Public Works (CPW)
    Greenwood CPW charges water taps per connection: $2,250 for a 3/4-inch tap and $2,490 for a 1-inch tap. A multifamily building on a single tap pays once; larger master-meter taps are priced by CPW.
    $2,250.00
  • Water Capacity Fee (Greenwood CPW, MF) — 0.75 ERU × $750/ERU
    Greenwood Commissioners of Public Works (CPW)
    Greenwood CPW normally sets its water capacity fee by meter size ($750 for a 5/8-inch meter up to $60,000 for an 8-inch meter). This per-unit figure uses the tariff's alternative flow method at 0.75 equivalent unit per apartment, which CPW applies on its Water Utilities Director's recommendation; otherwise a master-metered building pays by the size of its meter.
    $562.50Requires confirmation
Sewer$2,975.00
  • Sewer Impact Fee (Greenwood Metropolitan District, MF) — 0.75 REU × $2,500/REU
    Greenwood Metropolitan District (GMD)
    Greenwood Metropolitan District charges its sewer impact fee by expected flow at $2,500 per 300 gallons per day. This per-unit figure assumes a two-bedroom apartment at 225 gallons per day (0.75 unit) under South Carolina wastewater flow guidelines; the District sets each project's charge, with a $2,500 minimum per connection.
    $1,875.00Requires confirmation
  • Sewer Connection Fee (Greenwood Metropolitan District, MF)
    Greenwood Metropolitan District (GMD)
    Greenwood Metropolitan District charges its $1,100 sewer connection fee per connection, not per apartment. A multifamily building on a single sewer connection pays it once.
    $1,100.00
City$0.00
  • City Impact Fee (City of Greenwood, MF)
    City of Greenwood
    The City of Greenwood does not charge a development impact fee. Water service comes from Greenwood CPW and sewer from the Greenwood Metropolitan District, which charge their own fees.
    $0.00
County$0.00
  • County Impact Fee (Greenwood County, MF)
    Greenwood County
    Greenwood County does not charge a development impact fee. The county runs no water or sewer utility and funds capital projects through its 2016 Capital Project Sales Tax.
    $0.00
Total (Greenwood): $5,787.50
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Greenwood County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Greenwood: Commercial Impact Fees

Commercial development in Greenwood pays no per-square-foot impact fees, but owes $7,965.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to about $7,965.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (Greenwood Metropolitan District, City of Greenwood) ($2,500.00 one-time), Water Tap Fee (Greenwood CPW, City of Greenwood) — 1" meter ($2,490.00 one-time) and Water Capacity Fee (Greenwood CPW, City of Greenwood) — 1" meter ($1,875.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Greenwood Impact Fee Schedule
Water$4,365.00 one-time
Sewer$3,600.00 one-time
City$0.00
County$0.00
Total (Greenwood): $7,965.00 one-time (≈ $7,965.00 at 50,000 sq ft)
Sources last checked
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Greenwood County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Greenwood: Industrial Impact Fees

Industrial development in Greenwood pays no per-square-foot impact fees, but owes $7,965.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 50,000 sq ft building, that comes to about $7,965.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (Greenwood Metropolitan District, City of Greenwood) ($2,500.00 one-time), Water Tap Fee (Greenwood CPW, City of Greenwood) — 1" meter ($2,490.00 one-time) and Water Capacity Fee (Greenwood CPW, City of Greenwood) — 1" meter ($1,875.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Greenwood Impact Fee Schedule
Water$4,365.00 one-time
Sewer$3,600.00 one-time
City$0.00
County$0.00
Total (Greenwood): $7,965.00 one-time (≈ $7,965.00 at 50,000 sq ft)
Sources last checked
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Greenwood County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Greenwood: Office Impact Fees

Office development in Greenwood pays no per-square-foot impact fees, but owes $7,965.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).

For a 25,000 sq ft building, that comes to about $7,965.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Impact Fee (Greenwood Metropolitan District, City of Greenwood) ($2,500.00 one-time), Water Tap Fee (Greenwood CPW, City of Greenwood) — 1" meter ($2,490.00 one-time) and Water Capacity Fee (Greenwood CPW, City of Greenwood) — 1" meter ($1,875.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Greenwood Impact Fee Schedule
Water$4,365.00 one-time
Sewer$3,600.00 one-time
City$0.00
County$0.00
Total (Greenwood): $7,965.00 one-time (≈ $7,965.00 at 25,000 sq ft)
Sources last checked
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Greenwood County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Greenwood Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Greenwood Impact Fee FAQs

What are the total impact fees for a single-family home in Greenwood, South Carolina?

A new single-family home in Greenwood pays $6,600.00 per unit in combined impact fees (rates sourced November 11, 2026).

How much are commercial impact fees in Greenwood?

Commercial development in Greenwood pays no per-square-foot impact fees, but owes $7,965.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Greenwood charge its own impact fees?

Yes. Greenwood levies its own municipal impact or utility fees. Greenwood County does not currently add county-level impact fees inside Greenwood. The schedule on this page shows every fee that applies to development in Greenwood.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Greenwood County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000