Hodges Impact Fees by Project Type
Hodges: Single-Family Impact Fees
A new single-family home in Hodges pays at least $3,000.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (Greenwood CPW, Rural) — 3/4" meter ($2,250.00) and Water Capacity Fee (Greenwood CPW) — 5/8" meter ($750.00).
Sewer Connection Fee (Town of Hodges) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Hodges Impact Fee Schedule
- Water Tap Fee (Greenwood CPW, Rural) — 3/4" meter$2,250.00Greenwood Commissioners of Public Works (CPW)Greenwood CPW charges $2,250 to install a standard 3/4-inch water tap and $2,490 for a 1-inch tap (Miscellaneous Services Fee Tariffs, effective January 1, 2026). Inside-city and rural taps cost the same. Charged in addition to the water capacity fee.
- Water Capacity Fee (Greenwood CPW) — 5/8" meter$750.00Greenwood Commissioners of Public Works (CPW)Greenwood CPW water capacity fee under its Water Capacity Fee Tariff (effective August 1, 2010). A standard home on a 5/8-inch meter is 1 equivalent residential unit at $750; larger meters pay more, from $1,875 for a 1-inch meter to $60,000 for an 8-inch meter. Due when water service is requested, in addition to the tap fee.
- Sewer Connection Fee (Town of Hodges)Requires confirmationTown of HodgesNo public sewer system serves Hodges, and the town lies outside the Greenwood Metropolitan District, so new homes use septic systems.
- City Impact Fee (Town of Hodges)$0.00Town of HodgesThe Town of Hodges does not charge a development impact fee. Building permits in Hodges are issued through the joint Greenwood City/County Building Department, whose published fee schedule includes building permit and plan review charges only, with no impact fee. South Carolina law allows impact fees only where a local government has adopted them through a formal ordinance and study process, and Hodges has not done so.
- County Impact Fee (Greenwood County)$0.00Greenwood CountyGreenwood County does not charge a development impact fee. The county runs no water or sewer utility and funds capital projects through its 2016 Capital Project Sales Tax.
Where in Greenwood County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hodges: Multifamily Impact Fees
A new multifamily unit in Hodges pays at least $2,812.50 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (Greenwood CPW, Rural, MF) ($2,250.00).
Water Capacity Fee (Greenwood CPW, MF) — 0.75 ERU × $750/ERU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Town of Hodges, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Hodges Impact Fee Schedule
- Water Tap Fee (Greenwood CPW, Rural, MF)$2,250.00Greenwood Commissioners of Public Works (CPW)Greenwood CPW charges water taps per connection: $2,250 for a 3/4-inch tap and $2,490 for a 1-inch tap. A multifamily building on a single tap pays once; larger master-meter taps are priced by CPW.
- Water Capacity Fee (Greenwood CPW, MF) — 0.75 ERU × $750/ERU$562.50Requires confirmationGreenwood Commissioners of Public Works (CPW)Greenwood CPW normally sets its water capacity fee by meter size ($750 for a 5/8-inch meter up to $60,000 for an 8-inch meter). This per-unit figure uses the tariff's alternative flow method at 0.75 equivalent unit per apartment, which CPW applies on its Water Utilities Director's recommendation; otherwise a master-metered building pays by the size of its meter.
- Sewer Connection Fee (Town of Hodges, MF)Requires confirmationTown of HodgesNo public sewer system serves Hodges, and the town lies outside the Greenwood Metropolitan District, so new homes use septic systems.
- City Impact Fee (Town of Hodges, MF)$0.00Town of HodgesThe Town of Hodges does not charge a development impact fee. Building permits in Hodges are issued through the joint Greenwood City/County Building Department, whose published fee schedule includes building permit and plan review charges only, with no impact fee. South Carolina law allows impact fees only where a local government has adopted them through a formal ordinance and study process, and Hodges has not done so.
- County Impact Fee (Greenwood County, MF)$0.00Greenwood CountyGreenwood County does not charge a development impact fee. The county runs no water or sewer utility and funds capital projects through its 2016 Capital Project Sales Tax.
Where in Greenwood County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hodges: Commercial Impact Fees
Commercial development in Hodges pays no per-square-foot impact fees, but owes $4,365.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to at least $4,365.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Greenwood CPW, Town of Hodges) — 1" meter ($2,490.00 one-time) and Water Capacity Fee (Greenwood CPW, Town of Hodges) — 1" meter ($1,875.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Hodges) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Hodges Impact Fee Schedule
- Water Tap Fee (Greenwood CPW, Town of Hodges) — 1" meter$2,490.00 one-timeGreenwood CPW water tap fee, effective 1/1/2026. Charged in addition to the water capacity fee. Published for 3/4" and 1" meters; larger commercial taps are individually quoted.
- Water Capacity Fee (Greenwood CPW, Town of Hodges) — 1" meter$1,875.00 one-timeGreenwood CPW water capacity fee by meter size (AWWA equivalency), effective 8/1/2010. Separate from and additional to the water tap fee.
- Sewer Connection Fee (Town of Hodges)Requires confirmationThe Town of Hodges has no public sewer system; development uses on-site septic (SC DES permit).
- City Impact Fee (Town of Hodges, Commercial)$0.00The Town of Hodges does not levy a development impact fee.
- County Impact Fee (Greenwood County, Commercial)$0.00Greenwood County does not levy a development impact fee.
Where in Greenwood County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hodges: Industrial Impact Fees
Industrial development in Hodges pays no per-square-foot impact fees, but owes $4,365.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to at least $4,365.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Greenwood CPW, Town of Hodges) — 1" meter ($2,490.00 one-time) and Water Capacity Fee (Greenwood CPW, Town of Hodges) — 1" meter ($1,875.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Hodges) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Hodges Impact Fee Schedule
- Water Tap Fee (Greenwood CPW, Town of Hodges) — 1" meter$2,490.00 one-timeGreenwood CPW water tap fee, effective 1/1/2026. Charged in addition to the water capacity fee. Published for 3/4" and 1" meters; larger commercial taps are individually quoted.
- Water Capacity Fee (Greenwood CPW, Town of Hodges) — 1" meter$1,875.00 one-timeGreenwood CPW water capacity fee by meter size (AWWA equivalency), effective 8/1/2010. Separate from and additional to the water tap fee.
- Sewer Connection Fee (Town of Hodges)Requires confirmationThe Town of Hodges has no public sewer system; development uses on-site septic (SC DES permit).
- City Impact Fee (Town of Hodges, Industrial)$0.00The Town of Hodges does not levy a development impact fee.
- County Impact Fee (Greenwood County, Industrial)$0.00Greenwood County does not levy a development impact fee.
Where in Greenwood County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hodges: Office Impact Fees
Office development in Hodges pays no per-square-foot impact fees, but owes $4,365.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 25,000 sq ft building, that comes to at least $4,365.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Greenwood CPW, Town of Hodges) — 1" meter ($2,490.00 one-time) and Water Capacity Fee (Greenwood CPW, Town of Hodges) — 1" meter ($1,875.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Hodges) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Hodges Impact Fee Schedule
- Water Tap Fee (Greenwood CPW, Town of Hodges) — 1" meter$2,490.00 one-timeGreenwood CPW water tap fee, effective 1/1/2026. Charged in addition to the water capacity fee. Published for 3/4" and 1" meters; larger commercial taps are individually quoted.
- Water Capacity Fee (Greenwood CPW, Town of Hodges) — 1" meter$1,875.00 one-timeGreenwood CPW water capacity fee by meter size (AWWA equivalency), effective 8/1/2010. Separate from and additional to the water tap fee.
- Sewer Connection Fee (Town of Hodges)Requires confirmationThe Town of Hodges has no public sewer system; development uses on-site septic (SC DES permit).
- City Impact Fee (Town of Hodges, Office)$0.00The Town of Hodges does not levy a development impact fee.
- County Impact Fee (Greenwood County, Office)$0.00Greenwood County does not levy a development impact fee.
Where in Greenwood County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hodges Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Hodges Impact Fee FAQs
What are the total impact fees for a single-family home in Hodges, South Carolina?
A new single-family home in Hodges pays at least $3,000.00 per unit in combined impact fees (rates sourced November 11, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Hodges?
Commercial development in Hodges pays no per-square-foot impact fees, but owes $4,365.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Hodges charge its own impact fees?
Yes. Hodges levies its own municipal impact or utility fees. Greenwood County does not currently add county-level impact fees inside Hodges. The schedule on this page shows every fee that applies to development in Hodges.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Greenwood County impact fees page.