Kershaw County, South Carolina Impact Fees

Impact fees in Kershaw County depend on where you build. This page details the rates for unincorporated Kershaw County: $9,336.11 per single-family unit as of . This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Kershaw County Impact Fees by Project Type

Where in Kershaw County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Kershaw County$9,336.11this pageIncludes unconfirmed fees
Bethune$855.00Camden$11,111.50Elgin$7,250.00Includes unconfirmed fees

Unincorporated Kershaw County: Single-Family Impact Fees

A new single-family home in unincorporated Kershaw County pays $9,336.11 per unit in impact fees (rates sourced November 12, 2026). Of that, Kershaw County-levied fees account for $6,336.11 and municipal or utility fees for $3,000.00.

The largest line items are Sewer Impact Fee (Kershaw County Utilities) — 1 RDU x $3,500/RDU ($3,500.00), Parks & Recreation Impact Fee (Kershaw County) — 2.67 P/HH x $441.50/capita x 90% ($1,060.92) and Municipal Facilities & Equipment Impact Fee (Kershaw County) — 2.67 P/HH x $426.63/capita x 90% ($1,025.19).

Water Tap Fee — Lugoff-Elgin Water Authority ($1,200 tap + $1,800 impact) and Sewer Initiation Fee (Kershaw County Utilities) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Kershaw County Impact Fee Schedule
Water$3,000.00
  • Water Tap Fee — Lugoff-Elgin Water Authority ($1,200 tap + $1,800 impact)
    Lugoff-Elgin Water Authority, 3/4"
    Lugoff-Elgin Water Authority
    Water in the unincorporated county comes from several providers: the Lugoff-Elgin Water Authority (Lugoff and Elgin area), Cassatt Water, Bethune Rural Water Company (northeast) and the City of Camden (areas around Camden). Under the Lugoff-Elgin Water Authority's fiscal 2025 schedule a 3/4-inch residential connection pays a $1,200 tap fee plus an $1,800 impact fee ($6.00 per gallon on a 300-gallon-per-day allotment). The authority has stated that it raises the impact fee by $150 each year, and the fiscal 2026 and 2027 schedules have not been published, so the current charge is likely higher.
    $3,000.00Requires confirmation
Sewer$4,250.00
  • Sewer Impact Fee (Kershaw County Utilities) — 1 RDU x $3,500/RDU
    Kershaw County Utilities (Kershaw County Sewer District)
    Kershaw County Utilities charges a sewer impact fee of $3,500 per residential development unit, where one unit is 300 gallons per day of projected flow under the state unit contributory loading guide; a single-family home counts as one unit. The fee is due when the sewer availability letter is requested or when the home applies to connect. A separate sewer tap fee also applies.
    $3,500.00
  • Sewer Initiation Fee (Kershaw County Utilities)
    Kershaw County Utilities
    Kershaw County Utilities charges a $750 sewer initiation fee to connect a new home, in addition to its sewer impact fee, under the county's fiscal 2026-27 budget ordinance fee schedule.
    $750.00Requires confirmation
City$0.00
County$2,086.11
Total (unincorporated Kershaw County): $9,336.11
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Kershaw County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Kershaw County: Multifamily Impact Fees

A new multifamily unit in unincorporated Kershaw County pays at least $4,922.00 per unit in impact fees (rates sourced November 12, 2026). All of it is levied by Kershaw County.

The largest line items are Parks & Recreation Impact Fee (Kershaw County, MF) — 1.98 P/HH x $441.50/capita x 90% ($786.75) and Municipal Facilities & Equipment Impact Fee (Kershaw County, MF) — 1.98 P/HH x $426.63/capita x 90% ($760.25).

Sewer Impact Fee (Kershaw County Utilities, MF) — 0.75 RDU × $3,500/RDU and Sewer Initiation Fee (Kershaw County Utilities, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Tap/Capacity Fee (MF) — Lugoff-Elgin Water Authority is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Kershaw County Impact Fee Schedule
Water$0.00
  • Water Tap/Capacity Fee (MF) — Lugoff-Elgin Water Authority
    Lugoff-Elgin Water Authority service area
    Lugoff-Elgin Water Authority
    The Lugoff-Elgin Water Authority prices new connections by meter size and daily flow allotment rather than per dwelling unit, so no per-unit multifamily charge is published. Under its fiscal 2025 schedule a 3/4-inch connection pays a $1,200 tap fee plus an $1,800 impact fee, and larger meters pay more; the authority has stated that the impact fee rises $150 each year.
    Requires confirmation
Sewer$3,375.00
  • Sewer Impact Fee (Kershaw County Utilities, MF) — 0.75 RDU × $3,500/RDU
    Kershaw County Utilities (Kershaw County Sewer District)
    Kershaw County Utilities charges a sewer impact fee of $3,500 per residential development unit (300 gallons per day of projected flow). Under the state unit contributory loading guide the utility uses, a two-bedroom apartment counts as 225 gallons per day, or 0.75 unit, which is $2,625 per apartment; one-bedroom units count as 0.5 unit and three-bedroom units as 1 unit. A separate sewer tap fee also applies.
    $2,625.00Requires confirmation
  • Sewer Initiation Fee (Kershaw County Utilities, MF)
    Kershaw County Utilities
    Kershaw County Utilities charges a $750 sewer initiation fee per new connection, in addition to its sewer impact fee, under the county's fiscal 2026-27 budget ordinance fee schedule. The schedule sets no per-unit rate; a building served by one connection may pay it once.
    $750.00Requires confirmation
City$0.00
County$1,547.00
Total (unincorporated Kershaw County): $4,922.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Kershaw County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Kershaw County$47,055.00this pageIncludes unconfirmed fees
Bethune$1,000.00*Camden$44,807.00Elgin$10,475.00*Includes unconfirmed fees

Unincorporated Kershaw County: Commercial Impact Fees

Commercial development in unincorporated Kershaw County pays $0.73 per square foot in impact fees, plus $10,475.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 50,000 sq ft building, that comes to about $47,055.00. The calculator below adjusts to your exact square footage.

The largest line items are Municipal Facilities & Equipment Impact Fee (Kershaw County, Commercial) — Shopping Center 2.34 ESR x $347.39/emp x 90% ($0.73/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap and Impact Fee — Lugoff-Elgin Water Authority, 1" ($1,600 tap + $4,625 impact), Sewer Initiation Fee (Kershaw County Utilities), and Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Kershaw County Impact Fee Schedule
Water$6,225.00 one-time
  • Water Tap and Impact Fee — Lugoff-Elgin Water Authority, 1" ($1,600 tap + $4,625 impact)
    The Lugoff-Elgin Water Authority, the main water provider in the unincorporated county, charges one tap and impact fee schedule for every customer class. Shown: the 1-inch meter, a $1,600 tap fee plus a $4,625 impact fee from its FY 2025 budget. The authority raises its impact fees each year, so the current figures may be higher. Other providers serve parts of the county.
    $6,225.00 one-timeRequires confirmation
Sewer$4,250.00 one-time
  • Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU
    Kershaw County Utilities sewer impact fee is $3,500 per Residential Development Unit (RDU). A nonresidential project's RDU count equals its estimated flow divided by 300 gpd, so the total scales with the building's estimated flow; $3,500 is the one-RDU minimum. Serves sewered areas of the unincorporated county; rural areas use septic.
    $3,500.00 one-timeRequires confirmation
  • Sewer Initiation Fee (Kershaw County Utilities)
    Kershaw County Utilities charges new sewer customers a $750 sewer initiation fee in addition to the sewer impact fee (FY 2026-27 county budget ordinance).
    $750.00 one-timeRequires confirmation
City$0.00
County$0.73/sq ft
Total (unincorporated Kershaw County): $0.73/sq ft + $10,475.00 one-time (≈ $47,055.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Kershaw County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Kershaw County$35,956.00this pageIncludes unconfirmed fees
Bethune$1,000.00*Camden$31,857.00Elgin$10,475.00*Includes unconfirmed fees

Unincorporated Kershaw County: Industrial Impact Fees

Industrial development in unincorporated Kershaw County pays $0.51 per square foot in impact fees, plus $10,475.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 50,000 sq ft building, that comes to about $35,956.00. The calculator below adjusts to your exact square footage.

The largest line items are Municipal Facilities & Equipment Impact Fee (Kershaw County, Industrial) — General Light Industrial 1.63 ESR x $347.39/emp x 90% ($0.51/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap and Impact Fee — Lugoff-Elgin Water Authority, 1" ($1,600 tap + $4,625 impact), Sewer Initiation Fee (Kershaw County Utilities), and Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Kershaw County Impact Fee Schedule
Water$6,225.00 one-time
  • Water Tap and Impact Fee — Lugoff-Elgin Water Authority, 1" ($1,600 tap + $4,625 impact)
    The Lugoff-Elgin Water Authority, the main water provider in the unincorporated county, charges one tap and impact fee schedule for every customer class. Shown: the 1-inch meter, a $1,600 tap fee plus a $4,625 impact fee from its FY 2025 budget. The authority raises its impact fees each year, so the current figures may be higher. Other providers serve parts of the county.
    $6,225.00 one-timeRequires confirmation
Sewer$4,250.00 one-time
  • Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU
    Kershaw County Utilities sewer impact fee is $3,500 per Residential Development Unit (RDU). A nonresidential project's RDU count equals its estimated flow divided by 300 gpd, so the total scales with the building's estimated flow; $3,500 is the one-RDU minimum. Serves sewered areas of the unincorporated county; rural areas use septic.
    $3,500.00 one-timeRequires confirmation
  • Sewer Initiation Fee (Kershaw County Utilities)
    Kershaw County Utilities charges new sewer customers a $750 sewer initiation fee in addition to the sewer impact fee (FY 2026-27 county budget ordinance).
    $750.00 one-timeRequires confirmation
City$0.00
County$0.51/sq ft
Total (unincorporated Kershaw County): $0.51/sq ft + $10,475.00 one-time (≈ $35,956.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Kershaw County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Kershaw County$33,689.25this pageIncludes unconfirmed fees
Bethune$1,000.00*Camden$29,282.00Elgin$10,475.00*Includes unconfirmed fees

Unincorporated Kershaw County: Office Impact Fees

Office development in unincorporated Kershaw County pays $0.93 per square foot in impact fees, plus $10,475.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 25,000 sq ft building, that comes to about $33,689.25. The calculator below adjusts to your exact square footage.

The largest line items are Municipal Facilities & Equipment Impact Fee (Kershaw County, Office) — General Office 2.97 ESR x $347.39/emp x 90% ($0.93/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap and Impact Fee — Lugoff-Elgin Water Authority, 1" ($1,600 tap + $4,625 impact), Sewer Initiation Fee (Kershaw County Utilities), and Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Kershaw County Impact Fee Schedule
Water$6,225.00 one-time
  • Water Tap and Impact Fee — Lugoff-Elgin Water Authority, 1" ($1,600 tap + $4,625 impact)
    The Lugoff-Elgin Water Authority, the main water provider in the unincorporated county, charges one tap and impact fee schedule for every customer class. Shown: the 1-inch meter, a $1,600 tap fee plus a $4,625 impact fee from its FY 2025 budget. The authority raises its impact fees each year, so the current figures may be higher. Other providers serve parts of the county.
    $6,225.00 one-timeRequires confirmation
Sewer$4,250.00 one-time
  • Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU
    Kershaw County Utilities sewer impact fee is $3,500 per Residential Development Unit (RDU). A nonresidential project's RDU count equals its estimated flow divided by 300 gpd, so the total scales with the building's estimated flow; $3,500 is the one-RDU minimum. Serves sewered areas of the unincorporated county; rural areas use septic.
    $3,500.00 one-timeRequires confirmation
  • Sewer Initiation Fee (Kershaw County Utilities)
    Kershaw County Utilities charges new sewer customers a $750 sewer initiation fee in addition to the sewer impact fee (FY 2026-27 county budget ordinance).
    $750.00 one-timeRequires confirmation
City$0.00
County$0.93/sq ft
Total (unincorporated Kershaw County): $0.93/sq ft + $10,475.00 one-time (≈ $33,689.25 at 25,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Kershaw County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Kershaw County Impact Fee FAQs

What are single-family impact fees in Kershaw County, South Carolina?

A new single-family home in unincorporated Kershaw County pays $9,336.11 per unit in impact fees (rates sourced November 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Kershaw County?

Multifamily development in unincorporated Kershaw County pays at least $4,922.00 per unit in impact fees (rates sourced November 12, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Kershaw County?

Commercial development in unincorporated Kershaw County pays $0.73 per square foot in impact fees, plus $10,475.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $47,055.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Do cities in Kershaw County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 3 of 3 cities in Kershaw County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.