Skip to content
IMPACTFEES.ORG

Elgin, South Carolina Impact Fees

Elgin applies its own fee schedule: municipal fees plus the Kershaw County-levied fees that apply inside city limits. Combined, a new single-family home pays $7,250.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Elgin Impact Fees by Project Type

Elgin: Single-Family Impact Fees

A new single-family home in Elgin pays $7,250.00 per unit in impact fees (rates sourced November 12, 2026). Of that, Kershaw County-levied fees account for $4,250.00 and municipal or utility fees for $3,000.00.

The largest line items are Sewer Impact Fee (Kershaw County Utilities) — 1 RDU x $3,500/RDU ($3,500.00).

Water Tap Fee (Lugoff-Elgin Water Authority) — $1,200 tap + $1,800 impact and Sewer Initiation Fee (Kershaw County Utilities) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Elgin Impact Fee Schedule
Water$3,000.00
  • Water Tap Fee (Lugoff-Elgin Water Authority) — $1,200 tap + $1,800 impact
    Lugoff-Elgin Water Authority
    Water inside the Town of Elgin is provided by the Lugoff-Elgin Water Authority. Under the authority's fiscal 2025 schedule a 3/4-inch residential connection pays a $1,200 tap fee plus an $1,800 impact fee ($6.00 per gallon on a 300-gallon-per-day residential allotment). The authority has stated that it raises the impact fee by $150 each year, and the fiscal 2026 and 2027 schedules have not been published, so the current charge is likely higher.
    $3,000.00Requires confirmation
Sewer$4,250.00
  • Sewer Impact Fee (Kershaw County Utilities) — 1 RDU x $3,500/RDU
    Kershaw County Utilities
    Sewer service in the Town of Elgin is provided by Kershaw County Utilities, which charges a sewer impact fee of $3,500 per residential development unit, where one unit is 300 gallons per day of projected flow under the state unit contributory loading guide; a single-family home counts as one unit. The fee is due when the sewer availability letter is requested or at connection. A separate sewer tap fee also applies.
    $3,500.00
  • Sewer Initiation Fee (Kershaw County Utilities)
    Kershaw County Utilities
    Kershaw County Utilities, the sewer provider in Elgin, charges a $750 sewer initiation fee to connect a new home, in addition to its sewer impact fee, under the county's fiscal 2026-27 budget ordinance fee schedule.
    $750.00Requires confirmation
City$0.00
  • City Development Impact Fee (Town of Elgin)
    Town of Elgin
    The Town of Elgin has not adopted a development impact fee. Its current building construction permit fee schedule, effective September 2025, enumerates the town's permit, plan review and inspection charges and contains no impact fee. Elgin's 2023 comprehensive plan lists impact fees only as a possible future funding option.
    $0.00
County$0.00
Total (Elgin): $7,250.00
Sources last checked Official fee schedules:Lugoff-Elgin Water Authority Kershaw County Utilities Town of Elgin Kershaw County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Kershaw County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Elgin: Multifamily Impact Fees

A new multifamily unit in Elgin pays at least $3,375.00 per unit in impact fees (rates sourced November 12, 2026). All of it is levied by Kershaw County.

Sewer Impact Fee (Kershaw County Utilities, MF) — 0.75 RDU × $3,500/RDU and Sewer Initiation Fee (Kershaw County Utilities, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Tap/Capacity Fee (Lugoff-Elgin Water Authority, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Elgin Impact Fee Schedule
Water$0.00
  • Water Tap/Capacity Fee (Lugoff-Elgin Water Authority, MF)
    Lugoff-Elgin Water Authority
    Water inside the Town of Elgin is provided by the Lugoff-Elgin Water Authority, which prices new connections by meter size and daily flow allotment rather than per dwelling unit, so no per-unit multifamily charge is published. Under its fiscal 2025 schedule a 3/4-inch connection pays a $1,200 tap fee plus an $1,800 impact fee; the authority has stated that the impact fee rises $150 each year.
    Requires confirmation
Sewer$3,375.00
  • Sewer Impact Fee (Kershaw County Utilities, MF) — 0.75 RDU × $3,500/RDU
    Kershaw County Utilities
    Sewer in the Town of Elgin is provided by Kershaw County Utilities, which charges a sewer impact fee of $3,500 per residential development unit (300 gallons per day of projected flow). Under the state unit contributory loading guide the utility uses, a two-bedroom apartment counts as 0.75 unit, which is $2,625 per apartment; one-bedroom units count as 0.5 unit and three-bedroom units as 1 unit. A separate sewer tap fee also applies.
    $2,625.00Requires confirmation
  • Sewer Initiation Fee (Kershaw County Utilities, MF)
    Kershaw County Utilities
    Kershaw County Utilities, the sewer provider in Elgin, charges a $750 sewer initiation fee per new connection, in addition to its sewer impact fee, under the county's fiscal 2026-27 budget ordinance fee schedule. The schedule sets no per-unit rate; a building served by one connection may pay it once.
    $750.00Requires confirmation
City$0.00
  • City Development Impact Fee (Town of Elgin, MF)
    Town of Elgin
    The Town of Elgin has not adopted a development impact fee. Its current building construction permit fee schedule, effective September 2025, enumerates the town's permit, plan review and inspection charges and contains no impact fee. Elgin's 2023 comprehensive plan lists impact fees only as a possible future funding option.
    $0.00
County$0.00
Total (Elgin): $3,375.00
Sources last checked Official fee schedules:Lugoff-Elgin Water Authority Kershaw County Utilities Town of Elgin Kershaw County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Kershaw County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Elgin: Commercial Impact Fees

Commercial development in Elgin pays no per-square-foot impact fees, but owes $10,475.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 50,000 sq ft building, that comes to about $10,475.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Initiation Fee (Kershaw County Utilities), Water Tap and Impact Fee (Lugoff-Elgin Water Authority) — 1" ($1,600 tap + $4,625 impact), and Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Elgin Impact Fee Schedule
Water$6,225.00 one-time
Sewer$4,250.00 one-time
  • Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU
    Kershaw County Utilities sewer impact fee is $3,500 per Residential Development Unit (RDU). A nonresidential project's RDU count equals its estimated flow divided by 300 gpd, so the total scales with the building's estimated flow; $3,500 is the one-RDU minimum. Per the county's current Sewer Impact Fee Application (revised 7/1/2022).
    $3,500.00 one-timeRequires confirmation
  • Sewer Initiation Fee (Kershaw County Utilities)
    Kershaw County Utilities, which provides sewer in Elgin, charges new sewer customers a $750 sewer initiation fee in addition to the sewer impact fee (FY 2026-27 county budget ordinance).
    $750.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Elgin): $10,475.00 one-time (≈ $10,475.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Kershaw County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Elgin: Industrial Impact Fees

Industrial development in Elgin pays no per-square-foot impact fees, but owes $10,475.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 50,000 sq ft building, that comes to about $10,475.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Initiation Fee (Kershaw County Utilities), Water Tap and Impact Fee (Lugoff-Elgin Water Authority) — 1" ($1,600 tap + $4,625 impact), and Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Elgin Impact Fee Schedule
Water$6,225.00 one-time
Sewer$4,250.00 one-time
  • Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU
    Kershaw County Utilities sewer impact fee is $3,500 per Residential Development Unit (RDU). A nonresidential project's RDU count equals its estimated flow divided by 300 gpd, so the total scales with the building's estimated flow; $3,500 is the one-RDU minimum. Per the county's current Sewer Impact Fee Application (revised 7/1/2022).
    $3,500.00 one-timeRequires confirmation
  • Sewer Initiation Fee (Kershaw County Utilities)
    Kershaw County Utilities, which provides sewer in Elgin, charges new sewer customers a $750 sewer initiation fee in addition to the sewer impact fee (FY 2026-27 county budget ordinance).
    $750.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Elgin): $10,475.00 one-time (≈ $10,475.00 at 50,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Kershaw County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Elgin: Office Impact Fees

Office development in Elgin pays no per-square-foot impact fees, but owes $10,475.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).

For a 25,000 sq ft building, that comes to about $10,475.00. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Initiation Fee (Kershaw County Utilities), Water Tap and Impact Fee (Lugoff-Elgin Water Authority) — 1" ($1,600 tap + $4,625 impact), and Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Elgin Impact Fee Schedule
Water$6,225.00 one-time
Sewer$4,250.00 one-time
  • Sewer Impact Fee (Kershaw County Utilities) — 1 RDU minimum x $3,500/RDU
    Kershaw County Utilities sewer impact fee is $3,500 per Residential Development Unit (RDU). A nonresidential project's RDU count equals its estimated flow divided by 300 gpd, so the total scales with the building's estimated flow; $3,500 is the one-RDU minimum. Per the county's current Sewer Impact Fee Application (revised 7/1/2022).
    $3,500.00 one-timeRequires confirmation
  • Sewer Initiation Fee (Kershaw County Utilities)
    Kershaw County Utilities, which provides sewer in Elgin, charges new sewer customers a $750 sewer initiation fee in addition to the sewer impact fee (FY 2026-27 county budget ordinance).
    $750.00 one-timeRequires confirmation
City$0.00
County$0.00
Total (Elgin): $10,475.00 one-time (≈ $10,475.00 at 25,000 sq ft)
Sources last checked
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Kershaw County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Elgin Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Elgin Impact Fee FAQs

What are the total impact fees for a single-family home in Elgin, South Carolina?

A new single-family home in Elgin pays $7,250.00 per unit in combined impact fees (rates sourced November 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Elgin?

Commercial development in Elgin pays no per-square-foot impact fees, but owes $10,475.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Elgin charge its own impact fees?

Yes. Elgin levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Elgin, with the combined total.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Kershaw County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000