Bethune Impact Fees by Project Type
Bethune: Single-Family Impact Fees
A new single-family home in Bethune pays $855.00 per unit in impact fees (rates sourced August 15, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (Town of Bethune) — 3/4-inch tap ($855.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Bethune Impact Fee Schedule
- Water Tap Fee (Town of Bethune) — 3/4-inch tap$855.00Town of BethuneThe Town of Bethune operates the water system inside town limits. The tap fee for a 3/4-inch residential connection is $855, which covers the meter, box and couplings; a 1-inch tap is $1,000. A $150 security deposit and a $30 new account connection fee are charged separately. Property outside town limits is served by Bethune Rural Water Company, which charges its own tap fee.
- Sewer Connection Fee (Town of Bethune) — no municipal sewer system$0.00Town of BethuneThe Town of Bethune has no public sewer system; homes rely on septic tanks, so no sewer connection fee applies.
- City Development Impact Fee (Town of Bethune)$0.00Town of BethuneThe Town of Bethune has not adopted a development impact fee. The town's published schedule of charges enumerates deposits, connection, reconnection, account change and water tap fees and contains no impact fee, and its adopted comprehensive plan makes no mention of one.
- County Development Impact Fee (Kershaw County) — not collected in municipalities$0.00Kershaw CountyKershaw County's development impact fees (parks and recreation, municipal facilities and equipment) apply only in the unincorporated county and are not charged inside the Town of Bethune.
Where in Kershaw County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bethune: Multifamily Impact Fees
Bethune has no published impact fee amounts for a new multifamily unit (rates sourced August 15, 2026). The schedule below documents the status of each fee.
Water Tap Fee (Town of Bethune, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Bethune Impact Fee Schedule
- Water Tap Fee (Town of Bethune, MF)Requires confirmationTown of BethuneThe Town of Bethune sets water tap fees by meter size rather than per dwelling unit, so no per-unit multifamily charge exists. A 3/4-inch tap is $855 and a 1-inch tap is $1,000, each covering the meter, box and couplings.
- Sewer Connection Fee (Town of Bethune, MF) — no municipal sewer system$0.00Town of BethuneThe Town of Bethune has no public sewer system; development relies on septic systems, so no sewer connection fee applies.
- City Development Impact Fee (Town of Bethune, MF)$0.00Town of BethuneThe Town of Bethune has not adopted a development impact fee. The town's published schedule of charges enumerates deposits, connection, reconnection, account change and water tap fees and contains no impact fee, and its adopted comprehensive plan makes no mention of one.
- County Development Impact Fee (Kershaw County, MF) — not collected in municipalities$0.00Kershaw CountyKershaw County's development impact fees apply only in the unincorporated county and are not charged inside the Town of Bethune.
Where in Kershaw County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bethune: Commercial Impact Fees
Commercial development in Bethune pays no per-square-foot impact fees, but owes $1,000.00 in one-time water and sewer connection fees (rates sourced August 15, 2026).
For a 50,000 sq ft building, that comes to about $1,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Town of Bethune) — 1" meter ($1,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Bethune Impact Fee Schedule
- Water Tap Fee (Town of Bethune) — 1" meter$1,000.00 one-timeEffective June 2021. Tap covers meter, box and couplings. The Town provides water inside town limits only; the 1-inch meter is shown as the default. Meter sizes larger than 1 inch are not in the published schedule.
- Sewer Connection Fee (Town of Bethune, Commercial) — no municipal sewer system$0.00The Town of Bethune has no municipal sewer system; development relies on septic tanks.
- City Development Impact Fee (Town of Bethune, Commercial)$0.00The Town of Bethune has not adopted a development impact fee.
- County Development Impact Fee (Kershaw County, Commercial) — not collected in municipalities$0.00Kershaw County's development impact fee applies only in the unincorporated county and is not collected within the Town of Bethune.
Where in Kershaw County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bethune: Industrial Impact Fees
Industrial development in Bethune pays no per-square-foot impact fees, but owes $1,000.00 in one-time water and sewer connection fees (rates sourced August 15, 2026).
For a 50,000 sq ft building, that comes to about $1,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Town of Bethune) — 1" meter ($1,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Bethune Impact Fee Schedule
- Water Tap Fee (Town of Bethune) — 1" meter$1,000.00 one-timeEffective June 2021. Tap covers meter, box and couplings. The Town provides water inside town limits only; the 1-inch meter is shown as the default. Meter sizes larger than 1 inch are not in the published schedule.
- Sewer Connection Fee (Town of Bethune, Commercial) — no municipal sewer system$0.00The Town of Bethune has no municipal sewer system; development relies on septic tanks.
- City Development Impact Fee (Town of Bethune, Industrial)$0.00The Town of Bethune has not adopted a development impact fee.
- County Development Impact Fee (Kershaw County, Industrial) — not collected in municipalities$0.00Kershaw County's development impact fee applies only in the unincorporated county and is not collected within the Town of Bethune.
Where in Kershaw County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bethune: Office Impact Fees
Office development in Bethune pays no per-square-foot impact fees, but owes $1,000.00 in one-time water and sewer connection fees (rates sourced August 15, 2026).
For a 25,000 sq ft building, that comes to about $1,000.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (Town of Bethune) — 1" meter ($1,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Bethune Impact Fee Schedule
- Water Tap Fee (Town of Bethune) — 1" meter$1,000.00 one-timeEffective June 2021. Tap covers meter, box and couplings. The Town provides water inside town limits only; the 1-inch meter is shown as the default. Meter sizes larger than 1 inch are not in the published schedule.
- Sewer Connection Fee (Town of Bethune, Commercial) — no municipal sewer system$0.00The Town of Bethune has no municipal sewer system; development relies on septic tanks.
- City Development Impact Fee (Town of Bethune, Office)$0.00The Town of Bethune has not adopted a development impact fee.
- County Development Impact Fee (Kershaw County, Office) — not collected in municipalities$0.00Kershaw County's development impact fee applies only in the unincorporated county and is not collected within the Town of Bethune.
Where in Kershaw County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bethune Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Bethune Impact Fee FAQs
What are the total impact fees for a single-family home in Bethune, South Carolina?
A new single-family home in Bethune pays $855.00 per unit in combined impact fees (rates sourced August 15, 2026).
How much are commercial impact fees in Bethune?
Commercial development in Bethune pays no per-square-foot impact fees, but owes $1,000.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Bethune charge its own impact fees?
Yes. Bethune levies its own municipal impact or utility fees. Kershaw County does not currently add county-level impact fees inside Bethune. The schedule on this page shows every fee that applies to development in Bethune.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Kershaw County impact fees page.