Laurens County Impact Fees by Project Type
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Laurens County: Single-Family Impact Fees
A new single-family home in unincorporated Laurens County pays $6,150.00 per unit in impact fees (rates sourced November 12, 2026). All of it is levied by Laurens County.
The largest line items are Water Capacity Fee (LCWSC) — 1.0 ERU × $1,800/ERU ($1,800.00) and Water Tap Fee (LCWSC) — 3/4" meter ($1,100.00).
Sewer Tap Fee (LCWSC) — 4" tap and Sewer Capacity Fee (LCWSC) — 1.0 ERU × $1,750/ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Laurens County Impact Fee Schedule
- Water Capacity Fee (LCWSC) — 1.0 ERU × $1,800/ERU$1,800.00Laurens County Water & Sewer Commission (LCWSC)LCWSC water capacity fee for a 3/4-inch meter: $1,000 for distribution plus $800 for treatment, per the LCWSC Residential Rate Schedule effective July 1, 2026. It is charged in addition to the water tap fee.
- Water Tap Fee (LCWSC) — 3/4" meter$1,100.00Laurens County Water & Sewer Commission (LCWSC)Laurens County Water and Sewer Commission (LCWSC) water tap fee for a standard 3/4-inch residential meter, from the LCWSC Residential Rate Schedule effective July 1, 2026. It is charged in addition to the LCWSC water capacity fee. LCWSC updates its schedule each July 1.
- Sewer Capacity Fee (LCWSC) — 1.0 ERU × $1,750/ERU$1,750.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC sewer capacity fee: $750 for collection plus $1,000 for treatment, per the Residential Rate Schedule effective July 1, 2026. Where wastewater is treated by ReWa, the treatment capacity fee is paid to ReWa directly. LCWSC public sewer reaches only limited parts of the county; parcels on septic systems pay no sewer capacity fee.
- Sewer Tap Fee (LCWSC) — 4" tap$1,500.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC 4-inch sewer tap fee from the Residential Rate Schedule effective July 1, 2026; only one dwelling unit is allowed per 4-inch tap. LCWSC public sewer reaches only limited parts of the county, mainly around Clinton and Joanna, and most rural parcels use septic systems, which pay no sewer tap or capacity fee.
- City/Municipal Impact Fee (Unincorporated — N/A)$0.00N/A — unincorporated areaNo municipal impact fee applies in unincorporated Laurens County.
- County Development Impact Fee (Laurens County — none levied)$0.00Laurens CountyLaurens County does not levy a development impact fee. The county commissioned an impact fee study in August 2025, but no impact fee ordinance has been adopted. Building permits in the county pay only the Building Codes permit and plan review fees.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Laurens County: Multifamily Impact Fees
A new multifamily unit in unincorporated Laurens County pays $6,150.00 per unit in impact fees (rates sourced November 12, 2026). All of it is levied by Laurens County.
Water Capacity Fee (LCWSC, MF) — 3/4" meter per unit, Sewer Capacity Fee (LCWSC, MF) — 4" tap per unit, Water Tap Fee (LCWSC, MF) — 3/4" meter per unit, and Sewer Tap Fee (LCWSC, MF) — 4" tap per unit are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Laurens County Impact Fee Schedule
- Water Capacity Fee (LCWSC, MF) — 3/4" meter per unit$1,800.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC water capacity fee for a 3/4-inch meter ($1,000 distribution plus $800 treatment), per the Residential Rate Schedule effective July 1, 2026. LCWSC prices capacity by meter size and allows one unit per connection, so each multifamily unit pays the fee for its own 3/4-inch meter.
- Water Tap Fee (LCWSC, MF) — 3/4" meter per unit$1,100.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC prices water taps by meter size and allows one unit per connection, so each multifamily unit is charged the 3/4-inch tap fee, per the Residential Rate Schedule effective July 1, 2026. The tap fee is charged in addition to the water capacity fee.
- Sewer Capacity Fee (LCWSC, MF) — 4" tap per unit$1,750.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC sewer capacity fee ($750 collection plus $1,000 treatment) per the Residential Rate Schedule effective July 1, 2026. LCWSC allows only one dwelling unit per sewer tap, so each multifamily unit pays the full charge. Where ReWa treats the wastewater, the treatment capacity fee is paid to ReWa directly. LCWSC public sewer reaches only limited parts of the county.
- Sewer Tap Fee (LCWSC, MF) — 4" tap per unit$1,500.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC allows only one dwelling unit per 4-inch sewer tap, so each multifamily unit pays the full sewer tap fee, per the Residential Rate Schedule effective July 1, 2026. LCWSC public sewer reaches only limited parts of the county; parcels on septic systems pay no sewer fee.
- City/Municipal Impact Fee (Unincorporated — N/A) (MF)$0.00N/A — unincorporated areaNo municipal impact fee applies in unincorporated Laurens County.
- County Development Impact Fee (Laurens County — none levied) (MF)$0.00Laurens CountyLaurens County does not levy a development impact fee on any housing type. The county commissioned an impact fee study in August 2025, but no impact fee ordinance has been adopted.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Laurens County: Commercial Impact Fees
Commercial development in unincorporated Laurens County pays no per-square-foot impact fees, but owes $14,240.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 50,000 sq ft building, that comes to about $14,240.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter ($4,950.00 one-time) and Water Tap Fee (LCWSC, Laurens County unincorp) — 1" meter ($1,550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter and Sewer Tap Fee (LCWSC, Laurens County unincorp) — 4" tap are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Laurens County Impact Fee Schedule
- Water Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter$4,950.00 one-timeWater capacity fee, 1-inch meter (distribution + treatment components), LCWSC schedule effective July 1, 2026. Charged in addition to the water tap fee.
- Water Tap Fee (LCWSC, Laurens County unincorp) — 1" meter$1,550.00 one-timeWater tap (connection) fee, 1-inch meter, LCWSC schedule effective July 1, 2026. Charged in addition to the water capacity fee.
- Sewer Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter$6,240.00 one-timeRequires confirmationSewer capacity fee, 1-inch meter (collection plus treatment components), LCWSC Non-Residential Rate Schedule effective July 1, 2026, charged in addition to the sewer tap fee. In the ReWa treatment area the schedule directs the capacity charge to ReWa, paid to ReWa directly. LCWSC public sewer reaches only limited parts of the county, mainly around Clinton and Joanna; parcels on septic systems pay no sewer fee.
- Sewer Tap Fee (LCWSC, Laurens County unincorp) — 4" tap$1,500.00 one-timeRequires confirmationLCWSC 4-inch sewer tap fee from the Non-Residential Rate Schedule effective July 1, 2026; only one unit is allowed per 4-inch tap, and every nonresidential tap needs LCWSC Engineering approval. LCWSC public sewer reaches only limited parts of the county, mainly around Clinton and Joanna, and parcels on septic systems pay no sewer tap or capacity fee.
- City/Municipal Impact Fee (Unincorporated — N/A, Commercial)$0.00Unincorporated Laurens County has no municipal government, so no municipal development impact fee applies.
- County Development Impact Fee (Laurens County, Commercial) — Unincorporated$0.00Laurens County does not levy a development impact fee. Nonresidential development pays $0 in county impact fees.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Laurens County: Industrial Impact Fees
Industrial development in unincorporated Laurens County pays no per-square-foot impact fees, but owes $14,240.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 50,000 sq ft building, that comes to about $14,240.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter ($4,950.00 one-time) and Water Tap Fee (LCWSC, Laurens County unincorp) — 1" meter ($1,550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter and Sewer Tap Fee (LCWSC, Laurens County unincorp) — 4" tap are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Laurens County Impact Fee Schedule
- Water Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter$4,950.00 one-timeWater capacity fee, 1-inch meter (distribution + treatment components), LCWSC schedule effective July 1, 2026. Charged in addition to the water tap fee.
- Water Tap Fee (LCWSC, Laurens County unincorp) — 1" meter$1,550.00 one-timeWater tap (connection) fee, 1-inch meter, LCWSC schedule effective July 1, 2026. Charged in addition to the water capacity fee.
- Sewer Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter$6,240.00 one-timeRequires confirmationSewer capacity fee, 1-inch meter (collection plus treatment components), LCWSC Non-Residential Rate Schedule effective July 1, 2026, charged in addition to the sewer tap fee. In the ReWa treatment area the schedule directs the capacity charge to ReWa, paid to ReWa directly. LCWSC public sewer reaches only limited parts of the county, mainly around Clinton and Joanna; parcels on septic systems pay no sewer fee.
- Sewer Tap Fee (LCWSC, Laurens County unincorp) — 4" tap$1,500.00 one-timeRequires confirmationLCWSC 4-inch sewer tap fee from the Non-Residential Rate Schedule effective July 1, 2026; only one unit is allowed per 4-inch tap, and every nonresidential tap needs LCWSC Engineering approval. LCWSC public sewer reaches only limited parts of the county, mainly around Clinton and Joanna, and parcels on septic systems pay no sewer tap or capacity fee.
- City/Municipal Impact Fee (Unincorporated — N/A, Industrial)$0.00Unincorporated Laurens County has no municipal government, so no municipal development impact fee applies.
- County Development Impact Fee (Laurens County, Industrial) — Unincorporated$0.00Laurens County does not levy a development impact fee. Nonresidential development pays $0 in county impact fees.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Laurens County: Office Impact Fees
Office development in unincorporated Laurens County pays no per-square-foot impact fees, but owes $14,240.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 25,000 sq ft building, that comes to about $14,240.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter ($4,950.00 one-time) and Water Tap Fee (LCWSC, Laurens County unincorp) — 1" meter ($1,550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter and Sewer Tap Fee (LCWSC, Laurens County unincorp) — 4" tap are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Laurens County Impact Fee Schedule
- Water Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter$4,950.00 one-timeWater capacity fee, 1-inch meter (distribution + treatment components), LCWSC schedule effective July 1, 2026. Charged in addition to the water tap fee.
- Water Tap Fee (LCWSC, Laurens County unincorp) — 1" meter$1,550.00 one-timeWater tap (connection) fee, 1-inch meter, LCWSC schedule effective July 1, 2026. Charged in addition to the water capacity fee.
- Sewer Capacity Fee (LCWSC, Laurens County unincorp) — 1" meter$6,240.00 one-timeRequires confirmationSewer capacity fee, 1-inch meter (collection plus treatment components), LCWSC Non-Residential Rate Schedule effective July 1, 2026, charged in addition to the sewer tap fee. In the ReWa treatment area the schedule directs the capacity charge to ReWa, paid to ReWa directly. LCWSC public sewer reaches only limited parts of the county, mainly around Clinton and Joanna; parcels on septic systems pay no sewer fee.
- Sewer Tap Fee (LCWSC, Laurens County unincorp) — 4" tap$1,500.00 one-timeRequires confirmationLCWSC 4-inch sewer tap fee from the Non-Residential Rate Schedule effective July 1, 2026; only one unit is allowed per 4-inch tap, and every nonresidential tap needs LCWSC Engineering approval. LCWSC public sewer reaches only limited parts of the county, mainly around Clinton and Joanna, and parcels on septic systems pay no sewer tap or capacity fee.
- City/Municipal Impact Fee (Unincorporated — N/A, Office)$0.00Unincorporated Laurens County has no municipal government, so no municipal development impact fee applies.
- County Development Impact Fee (Laurens County, Office) — Unincorporated$0.00Laurens County does not levy a development impact fee. Nonresidential development pays $0 in county impact fees.
Laurens County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Laurens County Impact Fee FAQs
What are single-family impact fees in Laurens County, South Carolina?
A new single-family home in unincorporated Laurens County pays $6,150.00 per unit in impact fees (rates sourced November 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Laurens County?
Multifamily development in unincorporated Laurens County pays $6,150.00 per unit in impact fees (rates sourced November 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Laurens County?
Commercial development in unincorporated Laurens County pays no per-square-foot impact fees, but owes $14,240.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Do cities in Laurens County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 1 of 5 cities in Laurens County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.