Cross Hill Impact Fees by Project Type
Cross Hill: Single-Family Impact Fees
A new single-family home in Cross Hill pays $6,150.00 per unit in impact fees (rates sourced November 12, 2026). All of it is levied by Laurens County.
The largest line items are Water Capacity Fee (LCWSC) — 1.0 ERU × $1,800/ERU ($1,800.00) and Water Tap Fee (LCWSC) — 3/4" meter ($1,100.00).
Sewer Capacity Fee (LCWSC) — 1.0 ERU × $1,750/ERU and Sewer Tap Fee (LCWSC) — 4" tap are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Cross Hill Impact Fee Schedule
- Water Capacity Fee (LCWSC) — 1.0 ERU × $1,800/ERU$1,800.00Laurens County Water & Sewer Commission (LCWSC)LCWSC water capacity fee for a 3/4-inch meter: $1,000 for distribution plus $800 for treatment, per the Residential Rate Schedule effective July 1, 2026. It is charged in addition to the water tap fee.
- Water Tap Fee (LCWSC) — 3/4" meter$1,100.00Laurens County Water & Sewer Commission (LCWSC)The Laurens County Water and Sewer Commission (LCWSC) supplies water in the Town of Cross Hill, which owns no water system. This is the LCWSC tap fee for a standard 3/4-inch meter from the Residential Rate Schedule effective July 1, 2026, charged in addition to the water capacity fee.
- Sewer Capacity Fee (LCWSC) — 1.0 ERU × $1,750/ERU$1,750.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC sewer capacity fee: $750 for collection plus $1,000 for treatment, per the Residential Rate Schedule effective July 1, 2026. It applies only where LCWSC public sewer is available; most properties in the Town of Cross Hill use septic systems and pay no sewer fee.
- Sewer Tap Fee (LCWSC) — 4" tap$1,500.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC 4-inch sewer tap fee from the Residential Rate Schedule effective July 1, 2026; only one dwelling unit is allowed per tap. The Town of Cross Hill owns no sewer system and LCWSC public sewer reaches only limited parts of Laurens County, so most properties in the town use septic systems and pay no sewer fee.
- City Development Impact Fee (Town of Cross Hill — none found)$0.00Town of Cross HillThe Town of Cross Hill does not levy a development impact fee. The town has no building or planning department and has adopted no impact fee ordinance; construction permitting inside the town is handled by Laurens County Building Codes, whose adopted permit fee schedule is based on project valuation and contains no impact fee.
- County Development Impact Fee (Laurens County — none levied)$0.00Laurens CountyLaurens County does not levy a development impact fee, so no county impact fee applies inside the Town of Cross Hill.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cross Hill: Multifamily Impact Fees
A new multifamily unit in Cross Hill pays $6,150.00 per unit in impact fees (rates sourced November 12, 2026). All of it is levied by Laurens County.
Water Tap Fee (LCWSC, MF) — 3/4" meter per unit, Sewer Capacity Fee (LCWSC, MF) — 4" tap per unit, Water Capacity Fee (LCWSC, MF) — 3/4" meter per unit, and Sewer Tap Fee (LCWSC, MF) — 4" tap per unit are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Cross Hill Impact Fee Schedule
- Water Capacity Fee (LCWSC, MF) — 3/4" meter per unit$1,800.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC water capacity fee for a 3/4-inch meter ($1,000 distribution plus $800 treatment), per the Residential Rate Schedule effective July 1, 2026. LCWSC prices capacity by meter size and allows one unit per connection, so each multifamily unit pays the fee for its own meter.
- Water Tap Fee (LCWSC, MF) — 3/4" meter per unit$1,100.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC supplies water in the Town of Cross Hill. It prices water taps by meter size and allows one unit per connection, so each multifamily unit is charged the 3/4-inch tap fee from the Residential Rate Schedule effective July 1, 2026, in addition to the water capacity fee.
- Sewer Capacity Fee (LCWSC, MF) — 4" tap per unit$1,750.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC sewer capacity fee ($750 collection plus $1,000 treatment) per the Residential Rate Schedule effective July 1, 2026; LCWSC allows one dwelling unit per sewer tap, so each multifamily unit pays the full charge. It applies only where LCWSC public sewer is available; most properties in the Town of Cross Hill use septic systems.
- Sewer Tap Fee (LCWSC, MF) — 4" tap per unit$1,500.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC)LCWSC allows only one dwelling unit per 4-inch sewer tap, so each multifamily unit pays the full sewer tap fee from the Residential Rate Schedule effective July 1, 2026. It applies only where LCWSC public sewer is available; most properties in the Town of Cross Hill use septic systems.
- City Development Impact Fee (Town of Cross Hill — none found) (MF)$0.00Town of Cross HillThe Town of Cross Hill does not levy a development impact fee on any housing type. The town has no building or planning department and has adopted no impact fee ordinance; construction permitting inside the town is handled by Laurens County Building Codes, whose adopted permit fee schedule is based on project valuation and contains no impact fee.
- County Development Impact Fee (Laurens County — none levied) (MF)$0.00Laurens CountyLaurens County does not levy a development impact fee, so no county impact fee applies to multifamily development inside the Town of Cross Hill.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cross Hill: Commercial Impact Fees
Commercial development in Cross Hill pays no per-square-foot impact fees, but owes $14,240.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 50,000 sq ft building, that comes to about $14,240.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (LCWSC, Cross Hill) — 1" meter ($4,950.00 one-time) and Water Tap Fee (LCWSC, Cross Hill) — 1" meter ($1,550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (LCWSC, Cross Hill) — 1" meter and Sewer Tap Fee (LCWSC, Cross Hill) — 4" tap are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Cross Hill Impact Fee Schedule
- Water Capacity Fee (LCWSC, Cross Hill) — 1" meter$4,950.00 one-timeWater capacity fee, 1-inch meter (distribution + treatment components), LCWSC schedule effective July 1, 2026. Charged in addition to the water tap fee.
- Water Tap Fee (LCWSC, Cross Hill) — 1" meter$1,550.00 one-timeWater tap (connection) fee, 1-inch meter, LCWSC schedule effective July 1, 2026. Charged in addition to the water capacity fee.
- Sewer Capacity Fee (LCWSC, Cross Hill) — 1" meter$6,240.00 one-timeRequires confirmationSewer capacity fee, 1-inch meter (collection plus treatment components), LCWSC Non-Residential Rate Schedule effective July 1, 2026, charged in addition to the sewer tap fee. The Town of Cross Hill owns no sewer system; most properties in the town use septic systems and pay no sewer fee.
- Sewer Tap Fee (LCWSC, Cross Hill) — 4" tap$1,500.00 one-timeRequires confirmationLCWSC 4-inch sewer tap fee, Non-Residential Rate Schedule effective July 1, 2026; only one unit is allowed per 4-inch tap. The Town of Cross Hill owns no sewer system and LCWSC public sewer reaches only limited parts of Laurens County, so most properties in the town use septic systems and pay no sewer fee.
- City Development Impact Fee (Town of Cross Hill, Commercial)$0.00The Town of Cross Hill does not levy a development impact fee. The town has no building or planning department and has adopted no impact fee ordinance; construction permits inside the town are issued by Laurens County Building Codes, whose permit fee schedule contains no impact fee.
- County Development Impact Fee (Laurens County, Commercial) — Cross Hill$0.00Laurens County does not levy a development impact fee. Nonresidential development pays $0 in county impact fees.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cross Hill: Industrial Impact Fees
Industrial development in Cross Hill pays no per-square-foot impact fees, but owes $14,240.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 50,000 sq ft building, that comes to about $14,240.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (LCWSC, Cross Hill) — 1" meter ($4,950.00 one-time) and Water Tap Fee (LCWSC, Cross Hill) — 1" meter ($1,550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (LCWSC, Cross Hill) — 1" meter and Sewer Tap Fee (LCWSC, Cross Hill) — 4" tap are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Cross Hill Impact Fee Schedule
- Water Capacity Fee (LCWSC, Cross Hill) — 1" meter$4,950.00 one-timeWater capacity fee, 1-inch meter (distribution + treatment components), LCWSC schedule effective July 1, 2026. Charged in addition to the water tap fee.
- Water Tap Fee (LCWSC, Cross Hill) — 1" meter$1,550.00 one-timeWater tap (connection) fee, 1-inch meter, LCWSC schedule effective July 1, 2026. Charged in addition to the water capacity fee.
- Sewer Capacity Fee (LCWSC, Cross Hill) — 1" meter$6,240.00 one-timeRequires confirmationSewer capacity fee, 1-inch meter (collection plus treatment components), LCWSC Non-Residential Rate Schedule effective July 1, 2026, charged in addition to the sewer tap fee. The Town of Cross Hill owns no sewer system; most properties in the town use septic systems and pay no sewer fee.
- Sewer Tap Fee (LCWSC, Cross Hill) — 4" tap$1,500.00 one-timeRequires confirmationLCWSC 4-inch sewer tap fee, Non-Residential Rate Schedule effective July 1, 2026; only one unit is allowed per 4-inch tap. The Town of Cross Hill owns no sewer system and LCWSC public sewer reaches only limited parts of Laurens County, so most properties in the town use septic systems and pay no sewer fee.
- City Development Impact Fee (Town of Cross Hill, Industrial)$0.00The Town of Cross Hill does not levy a development impact fee. Construction permits inside the town are issued by Laurens County Building Codes, whose permit fee schedule contains no impact fee.
- County Development Impact Fee (Laurens County, Industrial) — Cross Hill$0.00Laurens County does not levy a development impact fee. Nonresidential development pays $0 in county impact fees.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cross Hill: Office Impact Fees
Office development in Cross Hill pays no per-square-foot impact fees, but owes $14,240.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 25,000 sq ft building, that comes to about $14,240.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (LCWSC, Cross Hill) — 1" meter ($4,950.00 one-time) and Water Tap Fee (LCWSC, Cross Hill) — 1" meter ($1,550.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (LCWSC, Cross Hill) — 1" meter and Sewer Tap Fee (LCWSC, Cross Hill) — 4" tap are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Cross Hill Impact Fee Schedule
- Water Capacity Fee (LCWSC, Cross Hill) — 1" meter$4,950.00 one-timeWater capacity fee, 1-inch meter (distribution + treatment components), LCWSC schedule effective July 1, 2026. Charged in addition to the water tap fee.
- Water Tap Fee (LCWSC, Cross Hill) — 1" meter$1,550.00 one-timeWater tap (connection) fee, 1-inch meter, LCWSC schedule effective July 1, 2026. Charged in addition to the water capacity fee.
- Sewer Capacity Fee (LCWSC, Cross Hill) — 1" meter$6,240.00 one-timeRequires confirmationSewer capacity fee, 1-inch meter (collection plus treatment components), LCWSC Non-Residential Rate Schedule effective July 1, 2026, charged in addition to the sewer tap fee. The Town of Cross Hill owns no sewer system; most properties in the town use septic systems and pay no sewer fee.
- Sewer Tap Fee (LCWSC, Cross Hill) — 4" tap$1,500.00 one-timeRequires confirmationLCWSC 4-inch sewer tap fee, Non-Residential Rate Schedule effective July 1, 2026; only one unit is allowed per 4-inch tap. The Town of Cross Hill owns no sewer system and LCWSC public sewer reaches only limited parts of Laurens County, so most properties in the town use septic systems and pay no sewer fee.
- City Development Impact Fee (Town of Cross Hill, Office)$0.00The Town of Cross Hill does not levy a development impact fee. Construction permits inside the town are issued by Laurens County Building Codes, whose permit fee schedule contains no impact fee.
- County Development Impact Fee (Laurens County, Office) — Cross Hill$0.00Laurens County does not levy a development impact fee. Nonresidential development pays $0 in county impact fees.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cross Hill Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Cross Hill Impact Fee FAQs
What are the total impact fees for a single-family home in Cross Hill, South Carolina?
A new single-family home in Cross Hill pays $6,150.00 per unit in combined impact fees (rates sourced November 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Cross Hill?
Commercial development in Cross Hill pays no per-square-foot impact fees, but owes $14,240.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Cross Hill charge its own impact fees?
No. Cross Hill does not levy its own municipal impact fees. New development in Cross Hill pays Laurens County impact fees, shown on this page.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Laurens County impact fees page.