Clinton Impact Fees by Project Type
Clinton: Single-Family Impact Fees
A new single-family home in Clinton pays $10,226.00 per unit in impact fees (rates sourced November 12, 2026). Of that, Laurens County-levied fees account for $975.00 and municipal or utility fees for $9,251.00.
The largest line items are Fire Impact Fee (City of Clinton) ($1,951.00), Parks and Recreation Impact Fee (City of Clinton) ($1,950.00) and Police Impact Fee (City of Clinton) ($850.00).
Sewer Impact Fee (LCWSC, collected by City of Clinton) — 3/4" meter, Sanitary Sewer Tap Fee (City of Clinton) — 4" inside city, and Water Tap Fee (City of Clinton) — 3/4" inside city are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Clinton Impact Fee Schedule
- Water Tap Fee (City of Clinton) — 3/4" inside city$2,300.00Requires confirmationCity of ClintonCity of Clinton water tap fee for a standard 3/4-inch meter inside the city limits. Larger meters cost more, taps of 2 inches and larger are billed at cost, and properties outside the city pay a higher rate.
- Sanitary Sewer Tap Fee (City of Clinton) — 4" inside city$2,200.00Requires confirmationCity of ClintonCity of Clinton 4-inch sanitary sewer tap fee for a property inside the city limits. Outside the city the tap costs more, and taps larger than 4 inches are billed at cost. A separate Laurens County Water and Sewer Commission impact fee, set by meter size, is collected by the city with the tap.
- Sewer Impact Fee (LCWSC, collected by City of Clinton) — 3/4" meter$975.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC), collected by City of ClintonLaurens County Water and Sewer Commission impact fee collected by the City of Clinton with a new utility connection, set by water meter size: $975 for a 3/4-inch meter in the city's FY 2025 utility tariff, effective July 1, 2024, rising to $3,650 for a 1-inch meter. LCWSC treats the city's wastewater.
- Fire Impact Fee (City of Clinton)$1,951.00City of ClintonCity of Clinton fire impact fee of $1,951 per single-family unit, adopted by Ordinance 2024-002-002 (City Code Sec. 54-55(b)), effective March 5, 2024. It applies only inside the city limits and is collected when the building permit is issued. The fee is not indexed and has a 15-year term.
- Parks and Recreation Impact Fee (City of Clinton)$1,950.00City of ClintonCity of Clinton parks and recreation impact fee of $1,950 per single-family unit, adopted by Ordinance 2024-002-002 (City Code Sec. 54-55(d)), effective March 5, 2024. It applies only inside the city limits and is collected when the building permit is issued. The fee is not indexed and has a 15-year term.
- Police Impact Fee (City of Clinton)$850.00City of ClintonCity of Clinton police impact fee of $850 per single-family unit, adopted by Ordinance 2024-002-002 (City Code Sec. 54-55(c)), effective March 5, 2024. It applies only inside the city limits and is collected when the building permit is issued. The fee is not indexed and has a 15-year term.
- County Development Impact Fee (Laurens County — none levied)$0.00Laurens CountyLaurens County does not levy a development impact fee, so no county impact fee applies inside the City of Clinton. The county commissioned an impact fee study in August 2025, but no ordinance has been adopted.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Clinton: Multifamily Impact Fees
A new multifamily unit in Clinton pays $7,840.00 per unit in impact fees (rates sourced November 12, 2026). Of that, Laurens County-levied fees account for $975.00 and municipal or utility fees for $6,865.00.
The largest line items are Fire Impact Fee (City of Clinton, MF) ($971.00), Parks and Recreation Impact Fee (City of Clinton, MF) ($971.00) and Police Impact Fee (City of Clinton, MF) ($423.00).
Sewer Impact Fee (LCWSC, collected by City of Clinton, MF) — 3/4" meter, Sanitary Sewer Tap Fee (City of Clinton, MF) — 4" inside city, and Water Tap Fee (City of Clinton, MF) — 3/4" inside city are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Clinton Impact Fee Schedule
- Water Tap Fee (City of Clinton, MF) — 3/4" inside city$2,300.00Requires confirmationCity of ClintonCity of Clinton charges water taps by meter size, not per dwelling unit. This is the 3/4-inch tap fee inside the city limits; a building served by one larger meter pays once at that meter's rate, and taps of 2 inches and larger are billed at cost.
- Sanitary Sewer Tap Fee (City of Clinton, MF) — 4" inside city$2,200.00Requires confirmationCity of ClintonCity of Clinton charges sewer taps by tap size, not per dwelling unit. This is the 4-inch tap fee inside the city limits; a building served by one tap pays it once, and taps larger than 4 inches are billed at cost.
- Sewer Impact Fee (LCWSC, collected by City of Clinton, MF) — 3/4" meter$975.00Requires confirmationLaurens County Water & Sewer Commission (LCWSC), collected by City of ClintonLaurens County Water and Sewer Commission impact fee collected by the City of Clinton with a new connection, set by water meter size, not per unit: $975 for a 3/4-inch meter in the city's FY 2025 utility tariff. A building served by one larger meter pays once at that meter's rate, for example $3,650 for 1-inch or $17,050 for 2-inch.
- Fire Impact Fee (City of Clinton, MF)$971.00City of ClintonCity of Clinton fire impact fee of $971 per multifamily unit, adopted by Ordinance 2024-002-002 (City Code Sec. 54-55(b)), effective March 5, 2024. Multifamily includes duplexes, condominiums and other attached dwellings. It applies only inside the city limits, is not indexed and has a 15-year term.
- Parks and Recreation Impact Fee (City of Clinton, MF)$971.00City of ClintonCity of Clinton parks and recreation impact fee of $971 per multifamily unit, adopted by Ordinance 2024-002-002 (City Code Sec. 54-55(d)), effective March 5, 2024. It applies only inside the city limits, is not indexed and has a 15-year term.
- Police Impact Fee (City of Clinton, MF)$423.00City of ClintonCity of Clinton police impact fee of $423 per multifamily unit, adopted by Ordinance 2024-002-002 (City Code Sec. 54-55(c)), effective March 5, 2024. Multifamily includes duplexes, condominiums and other attached dwellings. It applies only inside the city limits, is not indexed and has a 15-year term.
- County Development Impact Fee (Laurens County — none levied) (MF)$0.00Laurens CountyLaurens County does not levy a development impact fee, so no county impact fee applies to multifamily development inside the City of Clinton.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Clinton: Commercial Impact Fees
Commercial development in Clinton pays $4.95 per square foot in impact fees, plus $8,750.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 50,000 sq ft building, that comes to about $256,250.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap/Connection Fee (City of Clinton) — 1" meter ($2,900.00 one-time), Sanitary Sewer Tap/Connection Fee (City of Clinton) — 4" tap ($2,200.00 one-time) and Fire Impact Fee (City of Clinton, Commercial) ($3.45/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (LCWSC, collected by City of Clinton) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Clinton Impact Fee Schedule
- Water Tap/Connection Fee (City of Clinton) — 1" meter$2,900.00 one-timeInside-city water tap (connection) fee, 1-inch meter, City of Clinton fee schedule with rates effective July 1, 2025. Outside-city rate $3,250. Meters 2 inches and larger are charged at actual cost. A separate LCWSC impact fee, set by meter size, is collected with a new connection.
- Sewer Impact Fee (LCWSC, collected by City of Clinton) — 1" meter$3,650.00 one-timeRequires confirmationLaurens County Water and Sewer CommissionLaurens County Water and Sewer Commission impact fee collected by the City of Clinton with a new utility connection, 1-inch meter, from the city's Utility Rate Tariffs effective July 1, 2026. The fee is set by water meter size; LCWSC treats the city's wastewater. Charged in addition to the city's water and sewer tap fees.
- Sanitary Sewer Tap/Connection Fee (City of Clinton) — 4" tap$2,200.00 one-timeInside-city sanitary sewer tap (connection) fee, 4-inch standard tap, City of Clinton fee schedule with rates effective July 1, 2025. Outside-city rate $2,550; taps over 4 inches are charged at actual cost. Wastewater treatment is provided by LCWSC under contract, and an LCWSC impact fee set by water meter size is collected with a new connection.
- Fire Impact Fee (City of Clinton, Commercial)$3.45/sq ftEffective March 5, 2024. Assessed per 1,000 sq ft of gross floor area on nonresidential development inside the City of Clinton limits, at building-permit application. Flat rate with no annual indexing; program sunsets in 2039.
- Police Impact Fee (City of Clinton, Commercial)$1.50/sq ftEffective March 5, 2024. Assessed per 1,000 sq ft of gross floor area on nonresidential development inside the City of Clinton limits, at building-permit application. Flat rate with no annual indexing; program sunsets in 2039.
- County Development Impact Fee (Laurens County, Commercial)$0.00Laurens County does not levy a development impact fee. Nonresidential development pays $0 in county impact fees.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Clinton: Industrial Impact Fees
Industrial development in Clinton pays $0.68 per square foot in impact fees, plus $8,750.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 50,000 sq ft building, that comes to about $42,900.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap/Connection Fee (City of Clinton) — 1" meter ($2,900.00 one-time), Sanitary Sewer Tap/Connection Fee (City of Clinton) — 4" tap ($2,200.00 one-time) and Fire Impact Fee (City of Clinton, Industrial) ($0.48/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (LCWSC, collected by City of Clinton) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Clinton Impact Fee Schedule
- Water Tap/Connection Fee (City of Clinton) — 1" meter$2,900.00 one-timeInside-city water tap (connection) fee, 1-inch meter, City of Clinton fee schedule with rates effective July 1, 2025. Outside-city rate $3,250. Meters 2 inches and larger are charged at actual cost. A separate LCWSC impact fee, set by meter size, is collected with a new connection.
- Sewer Impact Fee (LCWSC, collected by City of Clinton) — 1" meter$3,650.00 one-timeRequires confirmationLaurens County Water and Sewer CommissionLaurens County Water and Sewer Commission impact fee collected by the City of Clinton with a new utility connection, 1-inch meter, from the city's Utility Rate Tariffs effective July 1, 2026. The fee is set by water meter size; LCWSC treats the city's wastewater. Charged in addition to the city's water and sewer tap fees.
- Sanitary Sewer Tap/Connection Fee (City of Clinton) — 4" tap$2,200.00 one-timeInside-city sanitary sewer tap (connection) fee, 4-inch standard tap, City of Clinton fee schedule with rates effective July 1, 2025. Outside-city rate $2,550; taps over 4 inches are charged at actual cost. Wastewater treatment is provided by LCWSC under contract, and an LCWSC impact fee set by water meter size is collected with a new connection.
- Fire Impact Fee (City of Clinton, Industrial)$0.48/sq ftEffective March 5, 2024. Assessed per 1,000 sq ft of gross floor area on nonresidential development inside the City of Clinton limits, at building-permit application. Flat rate with no annual indexing; program sunsets in 2039.
- Police Impact Fee (City of Clinton, Industrial)$0.21/sq ftEffective March 5, 2024. Assessed per 1,000 sq ft of gross floor area on nonresidential development inside the City of Clinton limits, at building-permit application. Flat rate with no annual indexing; program sunsets in 2039.
- County Development Impact Fee (Laurens County, Industrial)$0.00Laurens County does not levy a development impact fee. Nonresidential development pays $0 in county impact fees.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Clinton: Office Impact Fees
Office development in Clinton pays $2.20 per square foot in impact fees, plus $8,750.00 in one-time water and sewer connection fees (rates sourced November 12, 2026).
For a 25,000 sq ft building, that comes to about $63,675.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap/Connection Fee (City of Clinton) — 1" meter ($2,900.00 one-time), Sanitary Sewer Tap/Connection Fee (City of Clinton) — 4" tap ($2,200.00 one-time) and Fire Impact Fee (City of Clinton, Office) ($1.53/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Impact Fee (LCWSC, collected by City of Clinton) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Clinton Impact Fee Schedule
- Water Tap/Connection Fee (City of Clinton) — 1" meter$2,900.00 one-timeInside-city water tap (connection) fee, 1-inch meter, City of Clinton fee schedule with rates effective July 1, 2025. Outside-city rate $3,250. Meters 2 inches and larger are charged at actual cost. A separate LCWSC impact fee, set by meter size, is collected with a new connection.
- Sewer Impact Fee (LCWSC, collected by City of Clinton) — 1" meter$3,650.00 one-timeRequires confirmationLaurens County Water and Sewer CommissionLaurens County Water and Sewer Commission impact fee collected by the City of Clinton with a new utility connection, 1-inch meter, from the city's Utility Rate Tariffs effective July 1, 2026. The fee is set by water meter size; LCWSC treats the city's wastewater. Charged in addition to the city's water and sewer tap fees.
- Sanitary Sewer Tap/Connection Fee (City of Clinton) — 4" tap$2,200.00 one-timeInside-city sanitary sewer tap (connection) fee, 4-inch standard tap, City of Clinton fee schedule with rates effective July 1, 2025. Outside-city rate $2,550; taps over 4 inches are charged at actual cost. Wastewater treatment is provided by LCWSC under contract, and an LCWSC impact fee set by water meter size is collected with a new connection.
- Fire Impact Fee (City of Clinton, Office)$1.53/sq ftEffective March 5, 2024. Assessed per 1,000 sq ft of gross floor area on nonresidential development inside the City of Clinton limits, at building-permit application. Flat rate with no annual indexing; program sunsets in 2039.
- Police Impact Fee (City of Clinton, Office)$0.67/sq ftEffective March 5, 2024. Assessed per 1,000 sq ft of gross floor area on nonresidential development inside the City of Clinton limits, at building-permit application. Flat rate with no annual indexing; program sunsets in 2039.
- County Development Impact Fee (Laurens County, Office)$0.00Laurens County does not levy a development impact fee. Nonresidential development pays $0 in county impact fees.
Where in Laurens County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Clinton Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Clinton Impact Fee FAQs
What are the total impact fees for a single-family home in Clinton, South Carolina?
A new single-family home in Clinton pays $10,226.00 per unit in combined impact fees (rates sourced November 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Clinton?
Commercial development in Clinton pays $4.95 per square foot in impact fees, plus $8,750.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $256,250.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Clinton charge its own impact fees?
Yes. Clinton levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Clinton, with the combined total.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Laurens County impact fees page.