Skip to content
IMPACTFEES.ORG

Easley, South Carolina Impact Fees

Easley applies its own fee schedule. Pickens County does not currently add county-level impact fees inside city limits. A new single-family home pays $19,535.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Easley Impact Fees by Project Type

Easley: Single-Family Impact Fees

A new single-family home in Easley pays $19,535.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity Fee (Easley Combined Utilities) — $10,500 + $1,000 conveyance per REU ($11,500.00), Water Capacity Fee (Easley Combined Utilities) ($2,250.00) and Sewer Tap Fee (Easley Combined Utilities) ($1,330.00).

Transportation Impact Fee (City of Easley), Parks and Recreation Impact Fee (City of Easley), Police Impact Fee (City of Easley), and Fire Impact Fee (City of Easley) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Easley Impact Fee Schedule
Water$3,365.00
  • Water Capacity Fee (Easley Combined Utilities)
    5/8"
    Easley Combined Utilities
    Easley Combined Utilities charges a water capacity fee by meter size: $2,250 for a standard 5/8 inch residential meter, rising with the meter equivalent to $180,000 for an 8 inch meter (schedule effective April 1, 2025). Tap and meter fees are separate.
    $2,250.00
  • Water Tap & Meter Fee (Easley Combined Utilities) — $910 tap + $205 meter
    5/8"
    Easley Combined Utilities
    Easley Combined Utilities charges a $910 tap fee and a $205 meter fee for a 5/8 inch meter when its crews install the tap. If the builder installs the tap, setter and meter box, only the meter fee and the capacity fee apply. Schedule effective April 1, 2025.
    $1,115.00
Sewer$12,830.00
  • Sewer Capacity Fee (Easley Combined Utilities) — $10,500 + $1,000 conveyance per REU
    ReWa Georges Creek basin
    Easley Combined Utilities
    Easley Combined Utilities sets its sewer capacity fee per residential equivalent unit (300 gallons per day, one single-family home) by treatment basin. This is the highest of 2 rate districts: $10,500 plus a $1,000 conveyance fee where sewage flows to the ReWa Georges Creek plant, versus $5,000 in basins served by ECU's own plants. Effective April 1, 2026.
    $11,500.00
  • Sewer Tap Fee (Easley Combined Utilities)
    4"
    Easley Combined Utilities
    Easley Combined Utilities charges $1,330 for a 4 inch sewer tap installed by its crews (schedule effective April 1, 2026); larger taps are charged at cost, and no tap fee applies when the builder installs the tap.
    $1,330.00
City$3,340.00
  • Parks and Recreation Impact Fee (City of Easley)
    City of Easley
    The City of Easley parks and recreation impact fee is $1,715 per single-family home under Ordinance 2021-13, charged at 100% of the adopted schedule since January 1, 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the city still posts the 2021 base figures. It is one of four city impact fees (parks and recreation, police, fire and transportation).
    $1,715.00Requires confirmation
  • Fire Impact Fee (City of Easley)
    City of Easley
    The City of Easley fire impact fee is $629 per single-family home under Ordinance 2021-13, at 100% of the adopted schedule since January 1, 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the city still posts the 2021 base figures.
    $629.00Requires confirmation
  • Transportation Impact Fee (City of Easley)
    City of Easley
    The City of Easley transportation impact fee is $590 per single-family home under Ordinance 2021-13, at 100% of the adopted schedule since January 1, 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the city still posts the 2021 base figures.
    $590.00Requires confirmation
  • Police Impact Fee (City of Easley)
    City of Easley
    The City of Easley police impact fee is $406 per single-family home under Ordinance 2021-13, at 100% of the adopted schedule since January 1, 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the city still posts the 2021 base figures.
    $406.00Requires confirmation
County$0.00
Total (Easley): $19,535.00
Sources last checked Official fee schedules:Easley Combined Utilities City of Easley Pickens County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Easley: Multifamily Impact Fees

A new multifamily unit in Easley pays $15,513.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity Fee (Easley Combined Utilities, MF) — 0.75 REU × $11,500/REU ($8,625.00), Water Capacity Fee (Easley Combined Utilities, MF) ($2,250.00) and Sewer Tap Fee (Easley Combined Utilities, MF) ($1,330.00).

Transportation Impact Fee (City of Easley, MF), Parks and Recreation Impact Fee (City of Easley, MF), Police Impact Fee (City of Easley, MF), and Fire Impact Fee (City of Easley, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Easley Impact Fee Schedule
Water$3,365.00
  • Water Capacity Fee (Easley Combined Utilities, MF)
    5/8"
    Easley Combined Utilities
    Easley Combined Utilities charges its water capacity fee per meter, not per apartment. This amount assumes a 5/8 inch meter for each unit; a building served by one larger master meter pays once, on that meter's size (for example $18,000 for a 2 inch meter). Schedule effective April 1, 2025.
    $2,250.00
  • Water Tap & Meter Fee (Easley Combined Utilities, MF) — $910 tap + $205 meter
    5/8"
    Easley Combined Utilities
    Easley Combined Utilities charges a $910 tap fee and a $205 meter fee for a 5/8 inch meter installed by its crews; the charge is per connection, so a building on one connection pays once. If the builder installs the tap, only the meter fee applies.
    $1,115.00
Sewer$9,955.00
  • Sewer Capacity Fee (Easley Combined Utilities, MF) — 0.75 REU × $11,500/REU
    ReWa Georges Creek basin
    Easley Combined Utilities
    Easley Combined Utilities charges its sewer capacity fee on a development's permitted wastewater flow. This is the highest of 2 rate districts: $10,500 plus a $1,000 conveyance fee per 300 gallons per day where sewage flows to the ReWa Georges Creek plant ($5,000 in basins served by ECU's own plants). A two-bedroom apartment counts as 0.75 of a unit. Effective April 1, 2026.
    $8,625.00
  • Sewer Tap Fee (Easley Combined Utilities, MF)
    4"
    Easley Combined Utilities
    Easley Combined Utilities charges $1,330 for a 4 inch sewer tap installed by its crews; the charge is per connection, so a building on one connection pays once. Larger taps are charged at cost, and no tap fee applies when the builder installs the tap.
    $1,330.00
City$2,193.00
  • Parks and Recreation Impact Fee (City of Easley, MF)
    City of Easley
    The City of Easley parks and recreation impact fee is $1,211 per multifamily unit under Ordinance 2021-13, at 100% of the adopted schedule since January 1, 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the city still posts the 2021 base figures.
    $1,211.00Requires confirmation
  • Fire Impact Fee (City of Easley, MF)
    City of Easley
    The City of Easley fire impact fee is $444 per multifamily unit under Ordinance 2021-13, at 100% of the adopted schedule since January 1, 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the city still posts the 2021 base figures.
    $444.00Requires confirmation
  • Police Impact Fee (City of Easley, MF)
    City of Easley
    The City of Easley police impact fee is $287 per multifamily unit under Ordinance 2021-13, at 100% of the adopted schedule since January 1, 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the city still posts the 2021 base figures.
    $287.00Requires confirmation
  • Transportation Impact Fee (City of Easley, MF)
    City of Easley
    The City of Easley transportation impact fee is $251 per multifamily unit under Ordinance 2021-13, at 100% of the adopted schedule since January 1, 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the city still posts the 2021 base figures.
    $251.00Requires confirmation
County$0.00
Total (Easley): $15,513.00
Sources last checked Official fee schedules:Easley Combined Utilities City of Easley Pickens County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Easley: Commercial Impact Fees

Commercial development in Easley pays $2.28 per square foot in impact fees, plus $19,875.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $133,775.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Easley Combined Utilities) — $10,500 + $1,000 conveyance per REU ($11,500.00 one-time), Water Capacity Fee (Easley Combined Utilities) — 1" ($5,625.00 one-time) and Water Tap & Meter Fee (Easley Combined Utilities) — $1,130 tap + $290 meter ($1,420.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Transportation Impact Fee (City of Easley, Commercial), Police Impact Fee (City of Easley, Commercial), and Fire Impact Fee (City of Easley, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Easley Impact Fee Schedule
Water$7,045.00 one-time
Sewer$12,830.00 one-time
  • Sewer Capacity Fee (Easley Combined Utilities) — $10,500 + $1,000 conveyance per REU
    ReWa Georges Creek basin
    Easley Combined Utilities sewer capacity fee in the ReWa Georges Creek treatment basin: $10,500 per REU plus a $1,000 per REU conveyance fee, minimum one REU (300 gallons per day). Highest of ECU's two basin rates; nonresidential REUs equal the permitted discharge divided by 300, rounded up. Effective April 1, 2026.
    $11,500.00 one-time
  • Sewer Tap Fee (Easley Combined Utilities) — 4"
    Easley Combined Utilities sewer tap fee for a 4" tap installed by ECU crews. If the customer installs the tap, no tap fee applies (capacity fee only). Larger taps are charged at ECU's cost. Effective April 1, 2026.
    $1,330.00 one-time
City$2.28/sq ft
  • Fire Impact Fee (City of Easley, Commercial)
    City of Easley
    City of Easley fire impact fee on retail and commercial development, per 1,000 sq ft, fully phased in since January 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the amount shown is the adopted 2021 schedule.
    $0.99/sq ftRequires confirmation
  • Transportation Impact Fee (City of Easley, Commercial)
    City of Easley
    City of Easley transportation impact fee on retail and commercial development, per 1,000 sq ft, fully phased in since January 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the amount shown is the adopted 2021 schedule.
    $0.71/sq ftRequires confirmation
  • Police Impact Fee (City of Easley, Commercial)
    City of Easley
    City of Easley police impact fee on retail and commercial development, per 1,000 sq ft, fully phased in since January 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the amount shown is the adopted 2021 schedule. No parks fee applies to nonresidential development.
    $0.57/sq ftRequires confirmation
County$0.00
Total (Easley): $2.28/sq ft + $19,875.00 one-time (≈ $133,775.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Easley Pickens County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Easley: Industrial Impact Fees

Industrial development in Easley pays $0.41 per square foot in impact fees, plus $19,875.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $40,225.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Easley Combined Utilities) — $10,500 + $1,000 conveyance per REU ($11,500.00 one-time), Water Capacity Fee (Easley Combined Utilities) — 1" ($5,625.00 one-time) and Water Tap & Meter Fee (Easley Combined Utilities) — $1,130 tap + $290 meter ($1,420.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Police Impact Fee (City of Easley, Industrial), Fire Impact Fee (City of Easley, Industrial), and Transportation Impact Fee (City of Easley, Industrial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Easley Impact Fee Schedule
Water$7,045.00 one-time
Sewer$12,830.00 one-time
  • Sewer Capacity Fee (Easley Combined Utilities) — $10,500 + $1,000 conveyance per REU
    ReWa Georges Creek basin
    Easley Combined Utilities sewer capacity fee in the ReWa Georges Creek treatment basin: $10,500 per REU plus a $1,000 per REU conveyance fee, minimum one REU (300 gallons per day). Highest of ECU's two basin rates; nonresidential REUs equal the permitted discharge divided by 300, rounded up. Effective April 1, 2026.
    $11,500.00 one-time
  • Sewer Tap Fee (Easley Combined Utilities) — 4"
    Easley Combined Utilities sewer tap fee for a 4" tap installed by ECU crews. If the customer installs the tap, no tap fee applies (capacity fee only). Larger taps are charged at ECU's cost. Effective April 1, 2026.
    $1,330.00 one-time
City$0.41/sq ft
  • Fire Impact Fee (City of Easley, Industrial)
    City of Easley
    City of Easley fire impact fee on industrial development, per 1,000 sq ft, fully phased in since January 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the amount shown is the adopted 2021 schedule.
    $0.17/sq ftRequires confirmation
  • Transportation Impact Fee (City of Easley, Industrial)
    City of Easley
    City of Easley transportation impact fee on industrial development, per 1,000 sq ft, fully phased in since January 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the amount shown is the adopted 2021 schedule.
    $0.14/sq ftRequires confirmation
  • Police Impact Fee (City of Easley, Industrial)
    City of Easley
    City of Easley police impact fee on industrial development, per 1,000 sq ft, fully phased in since January 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the amount shown is the adopted 2021 schedule. No parks fee applies to nonresidential development.
    $0.10/sq ftRequires confirmation
County$0.00
Total (Easley): $0.41/sq ft + $19,875.00 one-time (≈ $40,225.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Easley Pickens County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Easley: Office Impact Fees

Office development in Easley pays $0.80 per square foot in impact fees, plus $19,875.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 25,000 sq ft building, that comes to about $39,850.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Capacity Fee (Easley Combined Utilities) — $10,500 + $1,000 conveyance per REU ($11,500.00 one-time), Water Capacity Fee (Easley Combined Utilities) — 1" ($5,625.00 one-time) and Water Tap & Meter Fee (Easley Combined Utilities) — $1,130 tap + $290 meter ($1,420.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Transportation Impact Fee (City of Easley, Office), Fire Impact Fee (City of Easley, Office), and Police Impact Fee (City of Easley, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Easley Impact Fee Schedule
Water$7,045.00 one-time
Sewer$12,830.00 one-time
  • Sewer Capacity Fee (Easley Combined Utilities) — $10,500 + $1,000 conveyance per REU
    ReWa Georges Creek basin
    Easley Combined Utilities sewer capacity fee in the ReWa Georges Creek treatment basin: $10,500 per REU plus a $1,000 per REU conveyance fee, minimum one REU (300 gallons per day). Highest of ECU's two basin rates; nonresidential REUs equal the permitted discharge divided by 300, rounded up. Effective April 1, 2026.
    $11,500.00 one-time
  • Sewer Tap Fee (Easley Combined Utilities) — 4"
    Easley Combined Utilities sewer tap fee for a 4" tap installed by ECU crews. If the customer installs the tap, no tap fee applies (capacity fee only). Larger taps are charged at ECU's cost. Effective April 1, 2026.
    $1,330.00 one-time
City$0.80/sq ft
  • Fire Impact Fee (City of Easley, Office)
    City of Easley
    City of Easley fire impact fee on office development, per 1,000 sq ft, fully phased in since January 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the amount shown is the adopted 2021 schedule.
    $0.34/sq ftRequires confirmation
  • Transportation Impact Fee (City of Easley, Office)
    City of Easley
    City of Easley transportation impact fee on office development, per 1,000 sq ft, fully phased in since January 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the amount shown is the adopted 2021 schedule.
    $0.27/sq ftRequires confirmation
  • Police Impact Fee (City of Easley, Office)
    City of Easley
    City of Easley police impact fee on office development, per 1,000 sq ft, fully phased in since January 2024. The ordinance adjusts the fee each year by the ENR Construction Cost Index; the amount shown is the adopted 2021 schedule. No parks fee applies to nonresidential development.
    $0.20/sq ftRequires confirmation
County$0.00
Total (Easley): $0.80/sq ft + $19,875.00 one-time (≈ $39,850.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Easley Pickens County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Easley Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Easley Impact Fee FAQs

What are the total impact fees for a single-family home in Easley, South Carolina?

A new single-family home in Easley pays $19,535.00 per unit in combined impact fees (rates sourced November 14, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Easley?

Commercial development in Easley pays $2.28 per square foot in impact fees, plus $19,875.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $133,775.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Easley charge its own impact fees?

Yes. Easley levies its own municipal impact or utility fees. Pickens County does not currently add county-level impact fees inside Easley. The schedule on this page shows every fee that applies to development in Easley.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Pickens County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000