Skip to content
IMPACTFEES.ORG

Six Mile, South Carolina Impact Fees

Six Mile applies its own fee schedule. Pickens County does not currently add county-level impact fees inside city limits. A new single-family home pays $3,000.00 per unit (rates sourced ). The full breakdown is below.

Six Mile Impact Fees by Project Type

Six Mile: Single-Family Impact Fees

A new single-family home in Six Mile pays $3,000.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Six Mile Rural Community Water District) ($2,000.00) and Water Impact Fee (Six Mile Rural Community Water District) ($1,000.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Six Mile Impact Fee Schedule
Water$3,000.00
  • Water Connection Fee (Six Mile Rural Community Water District)
    3/4"
    Six Mile Rural Community Water District
    Water service in Six Mile is provided by the Six Mile Rural Community Water District. Its connection fee is $2,000 for a 3/4 inch meter or $2,300 for a 1 inch meter, plus a separate $1,000 impact fee; 2 inch and larger connections are billed at material cost plus 30 percent.
    $2,000.00
  • Water Impact Fee (Six Mile Rural Community Water District)
    Six Mile Rural Community Water District
    The Six Mile Rural Community Water District charges a $1,000 impact fee on every new service connection, in addition to the connection fee.
    $1,000.00
Sewer$0.00
  • Sewer (Town of Six Mile)
    Town of Six Mile
    The Town of Six Mile has no public sewer system; homes use septic systems, so no sewer connection fee applies.
    $0.00
City$0.00
  • City Impact Fee (Town of Six Mile)
    Town of Six Mile
    The Town of Six Mile does not charge a development impact fee; its adopted fees for new homes are building permit fees only.
    $0.00
County$0.00
Total (Six Mile): $3,000.00
Sources last checked Official fee schedules:Six Mile Rural Community Water District Town of Six Mile Pickens County

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Six Mile: Multifamily Impact Fees

A new multifamily unit in Six Mile pays $3,000.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (Six Mile Rural Community Water District, MF) ($2,000.00) and Water Impact Fee (Six Mile Rural Community Water District, MF) ($1,000.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Six Mile Impact Fee Schedule
Water$3,000.00
  • Water Connection Fee (Six Mile Rural Community Water District, MF)
    3/4"
    Six Mile Rural Community Water District
    The Six Mile Rural Community Water District charges its connection fee per service connection, not per apartment: $2,000 for a 3/4 inch meter or $2,300 for a 1 inch meter, plus the $1,000 impact fee. A building on one connection pays once.
    $2,000.00
  • Water Impact Fee (Six Mile Rural Community Water District, MF)
    Six Mile Rural Community Water District
    The Six Mile Rural Community Water District charges per service connection, not per apartment: a building on one connection pays the $1,000 impact fee once, along with the connection fee.
    $1,000.00
Sewer$0.00
  • Sewer (Town of Six Mile, MF)
    Town of Six Mile
    The Town of Six Mile has no public sewer system; homes use septic systems, so no sewer connection fee applies.
    $0.00
City$0.00
County$0.00
Total (Six Mile): $3,000.00
Sources last checked Official fee schedules:Six Mile Rural Community Water District Town of Six Mile Pickens County

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Six Mile: Commercial Impact Fees

Commercial development in Six Mile pays no per-square-foot impact fees, but owes $3,300.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $3,300.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Six Mile Rural Community Water District) — 1" ($2,300.00 one-time) and Water Impact Fee (Six Mile Rural Community Water District) ($1,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Six Mile Impact Fee Schedule
Water$3,300.00 one-time
Sewer$0.00
  • Sewer (Town of Six Mile)
    The Town of Six Mile has no public sewer system; properties use septic. No sewer connection or impact fee applies.
    $0.00
City$0.00
County$0.00
Total (Six Mile): $3,300.00 one-time (≈ $3,300.00 at 50,000 sq ft)
Sources last checked Official fee schedule:Pickens County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Six Mile: Industrial Impact Fees

Industrial development in Six Mile pays no per-square-foot impact fees, but owes $3,300.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $3,300.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Six Mile Rural Community Water District) — 1" ($2,300.00 one-time) and Water Impact Fee (Six Mile Rural Community Water District) ($1,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Six Mile Impact Fee Schedule
Water$3,300.00 one-time
Sewer$0.00
  • Sewer (Town of Six Mile)
    The Town of Six Mile has no public sewer system; properties use septic. No sewer connection or impact fee applies.
    $0.00
City$0.00
County$0.00
Total (Six Mile): $3,300.00 one-time (≈ $3,300.00 at 50,000 sq ft)
Sources last checked Official fee schedule:Pickens County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Six Mile: Office Impact Fees

Office development in Six Mile pays no per-square-foot impact fees, but owes $3,300.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 25,000 sq ft building, that comes to about $3,300.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (Six Mile Rural Community Water District) — 1" ($2,300.00 one-time) and Water Impact Fee (Six Mile Rural Community Water District) ($1,000.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Six Mile Impact Fee Schedule
Water$3,300.00 one-time
Sewer$0.00
  • Sewer (Town of Six Mile)
    The Town of Six Mile has no public sewer system; properties use septic. No sewer connection or impact fee applies.
    $0.00
City$0.00
County$0.00
Total (Six Mile): $3,300.00 one-time (≈ $3,300.00 at 25,000 sq ft)
Sources last checked Official fee schedule:Pickens County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Six Mile Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Six Mile Impact Fee FAQs

What are the total impact fees for a single-family home in Six Mile, South Carolina?

A new single-family home in Six Mile pays $3,000.00 per unit in combined impact fees (rates sourced November 14, 2026).

How much are commercial impact fees in Six Mile?

Commercial development in Six Mile pays no per-square-foot impact fees, but owes $3,300.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Six Mile charge its own impact fees?

Yes. Six Mile levies its own municipal impact or utility fees. Pickens County does not currently add county-level impact fees inside Six Mile. The schedule on this page shows every fee that applies to development in Six Mile.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Pickens County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000