Liberty, South Carolina Impact Fees

Liberty applies its own fee schedule: municipal fees plus the Pickens County-levied fees that apply inside city limits. Combined, a new single-family home pays $6,955.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Liberty Impact Fees by Project Type

Liberty: Single-Family Impact Fees

A new single-family home in Liberty pays $6,955.00 per unit in impact fees (rates sourced November 18, 2026). Of that, Pickens County-levied fees account for $1,755.00 and municipal or utility fees for $5,200.00.

The largest line items are Sewer Tap Fee (City of Liberty) ($2,600.00) and Water Tap Fee (City of Liberty) ($2,600.00).

Wastewater Impact Fee (Pickens County Public Service Commission) — 300 gpd × $2,340 per 400 gpd is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Liberty Impact Fee Schedule
Water$2,600.00
  • Water Tap Fee (City of Liberty)
    5/8" x 3/4"
    City of Liberty
    The City of Liberty charges $2,600 for a 5/8 by 3/4 inch water tap inside the city limits ($3,600 outside) and $3,250 for a 1 inch tap ($4,200 outside), under its FY 2026-2027 budget ordinance effective July 1, 2026. Taps of 2 inches and larger are priced case by case from the city engineer's cost estimate.
    $2,600.00
Sewer$4,355.00
  • Sewer Tap Fee (City of Liberty)
    4"
    City of Liberty
    The City of Liberty charges $2,600 for a 4 inch sewer tap inside the city limits ($3,600 outside), effective July 1, 2026; larger taps are priced case by case. Wastewater treatment is provided by the Pickens County Public Service Commission, which charges its own wastewater impact fee based on requested flow.
    $2,600.00
  • Wastewater Impact Fee (Pickens County Public Service Commission) — 300 gpd × $2,340 per 400 gpd
    Pickens County Public Service Commission
    The Pickens County Public Service Commission charges a one-time wastewater impact fee of $2,340 for each 400 gallons per day of requested flow in the 18-Mile Creek and 12-Mile Creek basins, and no separate sewer tap fee. The amount shown assumes 300 gallons per day for a single-family home, the flow South Carolina sewer utilities commonly assign to one home; the commission sets the flow for each application.
    $1,755.00Requires confirmation
City$0.00
  • City Impact Fee (City of Liberty)
    City of Liberty
    The City of Liberty does not charge a development impact fee; its FY 2026-2027 fee schedule lists utility tap fees only.
    $0.00
County$0.00
Total (Liberty): $6,955.00
Sources last checked Official fee schedules:City of Liberty Pickens County Public Service Commission Pickens County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Liberty: Multifamily Impact Fees

A new multifamily unit in Liberty pays $6,516.25 per unit in impact fees (rates sourced November 18, 2026). Of that, Pickens County-levied fees account for $1,316.25 and municipal or utility fees for $5,200.00.

The largest line items are Water Tap Fee (City of Liberty, MF) ($2,600.00) and Sewer Tap Fee (City of Liberty, MF) ($2,600.00).

Wastewater Impact Fee (Pickens County Public Service Commission, MF) — 2BR = 225 gpd × $2,340 per 400 gpd is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Liberty Impact Fee Schedule
Water$2,600.00
  • Water Tap Fee (City of Liberty, MF)
    5/8" x 3/4"
    City of Liberty
    The City of Liberty prices water taps by meter size, not per apartment: $2,600 for a 5/8 by 3/4 inch tap and $3,250 for a 1 inch tap inside the city limits, effective July 1, 2026. A building served through one connection pays the tap fee once.
    $2,600.00
Sewer$3,916.25
  • Sewer Tap Fee (City of Liberty, MF)
    4"
    City of Liberty
    The City of Liberty charges $2,600 for a 4 inch sewer tap inside the city limits, priced per connection rather than per apartment, so a building on one connection pays once. Larger taps are priced case by case.
    $2,600.00
  • Wastewater Impact Fee (Pickens County Public Service Commission, MF) — 2BR = 225 gpd × $2,340 per 400 gpd
    Pickens County Public Service Commission
    The Pickens County Public Service Commission charges a one-time wastewater impact fee of $2,340 for each 400 gallons per day of requested flow in the 18-Mile Creek and 12-Mile Creek basins, and no separate sewer tap fee. The amount shown assumes 225 gallons per day for a 2 bedroom apartment, the South Carolina design flow for that unit; the commission sets the flow for each application.
    $1,316.25Requires confirmation
City$0.00
County$0.00
Total (Liberty): $6,516.25
Sources last checked Official fee schedules:City of Liberty Pickens County Public Service Commission Pickens County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Liberty: Commercial Impact Fees

Commercial development in Liberty pays no per-square-foot impact fees, but owes $8,190.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $8,190.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Liberty) — 1" ($3,250.00 one-time), Sewer Tap Fee (City of Liberty) ($2,600.00 one-time) and Wastewater Impact Fee (Pickens County Public Service Commission, via City of Liberty) ($2,340.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Liberty Impact Fee Schedule
Water$3,250.00 one-time
  • Water Tap Fee (City of Liberty) — 1"
    City of Liberty
    City of Liberty water tap fee for a 1" meter inside the city ($4,200 outside). Taps 2" and larger are priced case by case from the city engineer's estimate. Effective July 1, 2026.
    $3,250.00 one-time
Sewer$4,940.00 one-time
  • Sewer Tap Fee (City of Liberty)
    City of Liberty
    City of Liberty sewer tap fee for a 4" tap inside the city ($3,600 outside). Larger taps are priced case by case. The county Public Service Commission wastewater impact fee also applies. Effective July 1, 2026.
    $2,600.00 one-time
  • Wastewater Impact Fee (Pickens County Public Service Commission, via City of Liberty)
    Pickens County Public Service Commission
    Wastewater treatment is provided by the Pickens County Public Service Commission. Its impact fee is $2,340 per 400-gallon/day unit of requested flow (minimum one unit); larger commercial flows pay proportionally more. Collected by the City of Liberty prior to connection. Rate effective July 2019.
    $2,340.00 one-time
City$0.00
County$0.00
Total (Liberty): $8,190.00 one-time (≈ $8,190.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Liberty Pickens County Public Service Commission Pickens County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Liberty: Industrial Impact Fees

Industrial development in Liberty pays no per-square-foot impact fees, but owes $8,190.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $8,190.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Liberty) — 1" ($3,250.00 one-time), Sewer Tap Fee (City of Liberty) ($2,600.00 one-time) and Wastewater Impact Fee (Pickens County Public Service Commission, via City of Liberty) ($2,340.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Liberty Impact Fee Schedule
Water$3,250.00 one-time
  • Water Tap Fee (City of Liberty) — 1"
    City of Liberty
    City of Liberty water tap fee for a 1" meter inside the city ($4,200 outside). Taps 2" and larger are priced case by case from the city engineer's estimate. Effective July 1, 2026.
    $3,250.00 one-time
Sewer$4,940.00 one-time
  • Sewer Tap Fee (City of Liberty)
    City of Liberty
    City of Liberty sewer tap fee for a 4" tap inside the city ($3,600 outside). Larger taps are priced case by case. The county Public Service Commission wastewater impact fee also applies. Effective July 1, 2026.
    $2,600.00 one-time
  • Wastewater Impact Fee (Pickens County Public Service Commission, via City of Liberty)
    Pickens County Public Service Commission
    Wastewater treatment is provided by the Pickens County Public Service Commission. Its impact fee is $2,340 per 400-gallon/day unit of requested flow (minimum one unit); larger commercial flows pay proportionally more. Collected by the City of Liberty prior to connection. Rate effective July 2019.
    $2,340.00 one-time
City$0.00
County$0.00
Total (Liberty): $8,190.00 one-time (≈ $8,190.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Liberty Pickens County Public Service Commission Pickens County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Liberty: Office Impact Fees

Office development in Liberty pays no per-square-foot impact fees, but owes $8,190.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 25,000 sq ft building, that comes to about $8,190.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap Fee (City of Liberty) — 1" ($3,250.00 one-time), Sewer Tap Fee (City of Liberty) ($2,600.00 one-time) and Wastewater Impact Fee (Pickens County Public Service Commission, via City of Liberty) ($2,340.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Liberty Impact Fee Schedule
Water$3,250.00 one-time
  • Water Tap Fee (City of Liberty) — 1"
    City of Liberty
    City of Liberty water tap fee for a 1" meter inside the city ($4,200 outside). Taps 2" and larger are priced case by case from the city engineer's estimate. Effective July 1, 2026.
    $3,250.00 one-time
Sewer$4,940.00 one-time
  • Sewer Tap Fee (City of Liberty)
    City of Liberty
    City of Liberty sewer tap fee for a 4" tap inside the city ($3,600 outside). Larger taps are priced case by case. The county Public Service Commission wastewater impact fee also applies. Effective July 1, 2026.
    $2,600.00 one-time
  • Wastewater Impact Fee (Pickens County Public Service Commission, via City of Liberty)
    Pickens County Public Service Commission
    Wastewater treatment is provided by the Pickens County Public Service Commission. Its impact fee is $2,340 per 400-gallon/day unit of requested flow (minimum one unit); larger commercial flows pay proportionally more. Collected by the City of Liberty prior to connection. Rate effective July 2019.
    $2,340.00 one-time
City$0.00
County$0.00
Total (Liberty): $8,190.00 one-time (≈ $8,190.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Liberty Pickens County Public Service Commission Pickens County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pickens County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Liberty Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Liberty Impact Fee FAQs

What are the total impact fees for a single-family home in Liberty, South Carolina?

A new single-family home in Liberty pays $6,955.00 per unit in combined impact fees (rates sourced November 18, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Liberty?

Commercial development in Liberty pays no per-square-foot impact fees, but owes $8,190.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Liberty charge its own impact fees?

Yes. Liberty levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Liberty, with the combined total.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Pickens County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000