Arcadia Lakes, South Carolina Impact Fees

Arcadia Lakes applies its own fee schedule: municipal fees plus the Richland County-levied fees that apply inside city limits. Combined, a new single-family home pays $5,457.00 per unit (rates sourced ). The full breakdown is below.

Arcadia Lakes Impact Fees by Project Type

Arcadia Lakes: Single-Family Impact Fees

A new single-family home in Arcadia Lakes pays $5,457.00 per unit in impact fees (rates sourced November 14, 2026). Of that, Richland County-levied fees account for $2,945.00 and municipal or utility fees for $2,512.00.

The largest line items are Water Tap Fee (City of Columbia) ($2,512.00), Sewer Capacity Fee (East Richland County PSD) ($2,445.00) and Sewer Tap Fee (East Richland County PSD) ($500.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Arcadia Lakes Impact Fee Schedule
Water$2,512.00
  • Water Tap Fee (City of Columbia)
    City makes the tap, 3/4" meter
    City of Columbia
    Water service in Arcadia Lakes is provided by the City of Columbia. This is the City's tap and meter fee for a 3/4 inch meter where the City makes a new tap; where the tap already exists or the developer installs it, only the lower meter installation fee applies (see the developer-installed option). Columbia charges no water capacity or impact fee.
    $2,512.00
Sewer$2,945.00
  • Sewer Capacity Fee (East Richland County PSD)
    East Richland County Public Service District
    East Richland County Public Service District sewer capacity fee, charged per house or dwelling unit in addition to the sewer tap fee.
    $2,445.00
  • Sewer Tap Fee (East Richland County PSD)
    East Richland County Public Service District
    East Richland County Public Service District sewer tap fee for a new residential connection, paid with the district's separate capacity fee and a $100 inspection and permit fee.
    $500.00
City$0.00
County$0.00
  • County Impact Fee (Richland County)
    Richland County
    Richland County has no adopted development impact fee. County Council has studied one since 2022 and tabled the next step in October 2025.
    $0.00
Total (Arcadia Lakes): $5,457.00
Sources last checked Official fee schedules:City of Columbia East Richland County Public Service District Town of Arcadia Lakes Richland County

Where in Richland County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Arcadia Lakes: Multifamily Impact Fees

A new multifamily unit in Arcadia Lakes pays $5,457.00 per unit in impact fees (rates sourced November 14, 2026). Of that, Richland County-levied fees account for $2,945.00 and municipal or utility fees for $2,512.00.

The largest line items are Water Tap Fee (City of Columbia, MF) — City makes the tap, 3/4" meter ($2,512.00), Sewer Capacity Fee (East Richland County PSD, MF) ($2,445.00) and Sewer Tap Fee (East Richland County PSD, MF) ($500.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Arcadia Lakes Impact Fee Schedule
Water$2,512.00
  • Water Tap Fee (City of Columbia, MF) — City makes the tap, 3/4" meter
    City of Columbia
    Water service in Arcadia Lakes is provided by the City of Columbia. This is the City's tap and meter fee for a 3/4 inch meter where the City makes a new tap, shown for one unit on its own connection. A building served through one master meter pays once at that meter's size (1.5 inch $4,350, 2 inch $8,490). Where the developer installs the tap, only the meter fee applies (see the developer-installed option). Columbia has no water capacity or impact fee.
    $2,512.00
Sewer$2,945.00
  • Sewer Capacity Fee (East Richland County PSD, MF)
    East Richland County Public Service District
    East Richland County Public Service District sewer capacity fee, charged per house or dwelling unit (the district counts apartments and condominiums as residential units) in addition to the sewer tap fee.
    $2,445.00
  • Sewer Tap Fee (East Richland County PSD, MF)
    East Richland County Public Service District
    East Richland County Public Service District sewer tap fee for a new residential connection (the district counts apartments and condominiums as residential units), paid with the separate capacity fee and a $100 inspection and permit fee.
    $500.00
City$0.00
County$0.00
  • County Impact Fee (Richland County, MF)
    Richland County
    Richland County has no adopted development impact fee. County Council has studied one since 2022 and tabled the next step in October 2025.
    $0.00
Total (Arcadia Lakes): $5,457.00
Sources last checked Official fee schedules:City of Columbia East Richland County Public Service District Town of Arcadia Lakes Richland County

Where in Richland County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Arcadia Lakes: Commercial Impact Fees

Commercial development in Arcadia Lakes pays no per-square-foot impact fees, but owes $6,413.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $6,413.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap & Meter Fee (City of Columbia) — 1" meter ($3,468.00 one-time), Sewer Capacity Fee (East Richland County PSD) — per REU ($2,445.00 one-time) and Sewer Tap Fee (East Richland County PSD) ($500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Arcadia Lakes Impact Fee Schedule
Water$3,468.00 one-time
  • Water Tap & Meter Fee (City of Columbia) — 1" meter
    City of Columbia
    Water provided by City of Columbia Water. City-make tap and meter fee by meter size; the 1-inch meter is shown as the default. Rates effective 7/1/2026. No separate water capacity or impact fee.
    $3,468.00 one-time
Sewer$2,945.00 one-time
  • Sewer Capacity Fee (East Richland County PSD) — per REU
    East Richland County Public Service District
    Sewer capacity fee is $2,445 per Residential Equivalent Unit (REU). A nonresidential connection's REU count is set from DHEC unit contributory loading for the establishment type (minimum 1.0 REU); the amount shown is the 1-REU minimum.
    $2,445.00 one-time
  • Sewer Tap Fee (East Richland County PSD)
    East Richland County Public Service District
    Sewer provided by East Richland County Public Service District. Commercial sewer tap fee is $500 (a separate $100 inspection/permit fee applies).
    $500.00 one-time
City$0.00
County$0.00
Total (Arcadia Lakes): $6,413.00 one-time (≈ $6,413.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Columbia East Richland County Public Service District Town of Arcadia Lakes Richland County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Richland County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Arcadia Lakes: Industrial Impact Fees

Industrial development in Arcadia Lakes pays no per-square-foot impact fees, but owes $6,413.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 50,000 sq ft building, that comes to about $6,413.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap & Meter Fee (City of Columbia) — 1" meter ($3,468.00 one-time), Sewer Capacity Fee (East Richland County PSD) — per REU ($2,445.00 one-time) and Sewer Tap Fee (East Richland County PSD) ($500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Arcadia Lakes Impact Fee Schedule
Water$3,468.00 one-time
  • Water Tap & Meter Fee (City of Columbia) — 1" meter
    City of Columbia
    Water provided by City of Columbia Water. City-make tap and meter fee by meter size; the 1-inch meter is shown as the default. Rates effective 7/1/2026. No separate water capacity or impact fee.
    $3,468.00 one-time
Sewer$2,945.00 one-time
  • Sewer Capacity Fee (East Richland County PSD) — per REU
    East Richland County Public Service District
    Sewer capacity fee is $2,445 per Residential Equivalent Unit (REU). A nonresidential connection's REU count is set from DHEC unit contributory loading for the establishment type (minimum 1.0 REU); the amount shown is the 1-REU minimum.
    $2,445.00 one-time
  • Sewer Tap Fee (East Richland County PSD)
    East Richland County Public Service District
    Sewer provided by East Richland County Public Service District. Commercial sewer tap fee is $500 (a separate $100 inspection/permit fee applies).
    $500.00 one-time
City$0.00
County$0.00
Total (Arcadia Lakes): $6,413.00 one-time (≈ $6,413.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Columbia East Richland County Public Service District Town of Arcadia Lakes Richland County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Richland County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Arcadia Lakes: Office Impact Fees

Office development in Arcadia Lakes pays no per-square-foot impact fees, but owes $6,413.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).

For a 25,000 sq ft building, that comes to about $6,413.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap & Meter Fee (City of Columbia) — 1" meter ($3,468.00 one-time), Sewer Capacity Fee (East Richland County PSD) — per REU ($2,445.00 one-time) and Sewer Tap Fee (East Richland County PSD) ($500.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Arcadia Lakes Impact Fee Schedule
Water$3,468.00 one-time
  • Water Tap & Meter Fee (City of Columbia) — 1" meter
    City of Columbia
    Water provided by City of Columbia Water. City-make tap and meter fee by meter size; the 1-inch meter is shown as the default. Rates effective 7/1/2026. No separate water capacity or impact fee.
    $3,468.00 one-time
Sewer$2,945.00 one-time
  • Sewer Capacity Fee (East Richland County PSD) — per REU
    East Richland County Public Service District
    Sewer capacity fee is $2,445 per Residential Equivalent Unit (REU). A nonresidential connection's REU count is set from DHEC unit contributory loading for the establishment type (minimum 1.0 REU); the amount shown is the 1-REU minimum.
    $2,445.00 one-time
  • Sewer Tap Fee (East Richland County PSD)
    East Richland County Public Service District
    Sewer provided by East Richland County Public Service District. Commercial sewer tap fee is $500 (a separate $100 inspection/permit fee applies).
    $500.00 one-time
City$0.00
County$0.00
Total (Arcadia Lakes): $6,413.00 one-time (≈ $6,413.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Columbia East Richland County Public Service District Town of Arcadia Lakes Richland County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Richland County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Arcadia Lakes Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Arcadia Lakes Impact Fee FAQs

What are the total impact fees for a single-family home in Arcadia Lakes, South Carolina?

A new single-family home in Arcadia Lakes pays $5,457.00 per unit in combined impact fees (rates sourced November 14, 2026).

How much are commercial impact fees in Arcadia Lakes?

Commercial development in Arcadia Lakes pays no per-square-foot impact fees, but owes $6,413.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Arcadia Lakes charge its own impact fees?

Yes. Arcadia Lakes levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Arcadia Lakes, with the combined total.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Richland County impact fees page.