Blythewood Impact Fees by Project Type
Blythewood: Single-Family Impact Fees
A new single-family home in Blythewood pays $7,990.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee — Town of Winnsboro (out-of-town), 3/4" meter ($1,500 tap + $1,500 capacity) ($3,000.00).
Sewer Plant Impact Fee (Palmetto Utilities), Sewer Tap Fee (City of Columbia) — residential new tap, and Sewer Service Connection Charge (Palmetto Utilities) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Blythewood Impact Fee Schedule
- Water Tap Fee — Town of Winnsboro (out-of-town), 3/4" meter ($1,500 tap + $1,500 capacity)$3,000.00Town of WinnsboroMost of Blythewood gets water from the Town of Winnsboro; the City of Columbia serves some properties in the southern part of town. Blythewood lies outside Winnsboro's limits, so a 3/4 inch meter pays Winnsboro's out-of-town tap fee of $1,500 plus its water capacity fee of $1,500, under its fee schedule effective July 1, 2024.
- Sewer Tap Fee (City of Columbia) — residential new tap$3,940.00Requires confirmationCity of Columbia
- Sewer Plant Impact Fee (Palmetto Utilities)$800.00Requires confirmationSouth Carolina Water Utilities - PUI, Inc. (Palmetto Utilities)Palmetto Utilities (South Carolina Water Utilities - PUI) plant impact fee per single-family equivalent under its Public Service Commission rate schedule effective September 20, 2020, paid with the separate sewer service connection charge. The utility also collects a tax gross-up on both charges that the schedule does not state as a dollar amount.
- Sewer Service Connection Charge (Palmetto Utilities)$250.00Requires confirmationSouth Carolina Water Utilities - PUI, Inc. (Palmetto Utilities)Sewer service in Blythewood is provided by Palmetto Utilities (South Carolina Water Utilities - PUI), a private utility regulated by the South Carolina Public Service Commission. Its approved rate schedule (effective September 20, 2020) sets a sewer service connection charge per single-family equivalent, paid with a separate plant impact fee, plus a tax gross-up on both that the schedule does not state as a dollar amount.
- City Impact Fee (Town of Blythewood)$0.00Town of Blythewood
- County Impact Fee (Richland County)$0.00Richland CountyRichland County has no adopted development impact fee. County Council has studied one since 2022 and tabled the next step in October 2025.
Where in Richland County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blythewood: Multifamily Impact Fees
A new multifamily unit in Blythewood pays $4,050.00 per unit in impact fees (rates sourced November 14, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (MF) — Town of Winnsboro (out-of-town), 3/4" meter ($1,500 tap + $1,500 capacity) ($3,000.00).
Sewer Plant Impact Fee (Palmetto Utilities, MF) and Sewer Service Connection Charge (Palmetto Utilities, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Blythewood Impact Fee Schedule
- Water Tap Fee (MF) — Town of Winnsboro (out-of-town), 3/4" meter ($1,500 tap + $1,500 capacity)$3,000.00Town of WinnsboroMost of Blythewood gets water from the Town of Winnsboro; the City of Columbia serves some properties in the southern part of town. A 3/4 inch meter pays Winnsboro's out-of-town tap fee of $1,500 plus its water capacity fee of $1,500, under its fee schedule effective July 1, 2024, shown for one unit on its own meter. A building served by one meter pays once at that meter's size.
- Sewer Plant Impact Fee (Palmetto Utilities, MF)$800.00Requires confirmationSouth Carolina Water Utilities - PUI, Inc. (Palmetto Utilities)Palmetto Utilities (South Carolina Water Utilities - PUI) plant impact fee per single-family equivalent under its Public Service Commission rate schedule effective September 20, 2020, shown for one apartment unit and paid with the separate sewer service connection charge. The utility also collects a tax gross-up on both charges that the schedule does not state as a dollar amount.
- Sewer Service Connection Charge (Palmetto Utilities, MF)$250.00Requires confirmationSouth Carolina Water Utilities - PUI, Inc. (Palmetto Utilities)Sewer service in Blythewood is provided by Palmetto Utilities (South Carolina Water Utilities - PUI), a private utility regulated by the South Carolina Public Service Commission. Its rate schedule (effective September 20, 2020) sets a sewer service connection charge per single-family equivalent, paid with a separate plant impact fee, plus a tax gross-up on both that the schedule does not state as a dollar amount.
- City Impact Fee (Town of Blythewood, MF)$0.00Town of Blythewood
- County Impact Fee (Richland County, MF)$0.00Richland CountyRichland County has no adopted development impact fee. County Council has studied one since 2022 and tabled the next step in October 2025.
Where in Richland County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blythewood: Commercial Impact Fees
Commercial development in Blythewood pays no per-square-foot impact fees, but owes $8,300.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to about $8,300.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity) ($7,250.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Service Connection Charge (Palmetto Utilities) and Sewer Plant Impact Fee (Palmetto Utilities) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Blythewood Impact Fee Schedule
- Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity)$7,250.00 one-timeTown of WinnsboroMost of Blythewood gets water from the Town of Winnsboro, which charges its out-of-town tap fee plus a water capacity fee. Shown for a 1-inch meter: $3,500 tap plus $3,750 capacity, from the schedule effective July 1, 2024. The southern part of town is served by City of Columbia Water instead.
- Sewer Plant Impact Fee (Palmetto Utilities)$800.00 one-timeRequires confirmationPalmetto Utilities, Inc.Palmetto Utilities plant impact fee: $800 per single-family equivalent, multiplied by the project's equivalency rating above one, plus the utility's income-tax gross-up. Paid in addition to the $250 connection charge.
- Sewer Service Connection Charge (Palmetto Utilities)$250.00 one-timeRequires confirmationPalmetto Utilities, Inc.Sewer in Blythewood is provided by Palmetto Utilities. Its connection charge is $250 per single-family equivalent, multiplied by the project's equivalency rating above one (set from DHEC loading guidelines), plus an income-tax gross-up the utility adds. A separate plant impact fee also applies.
- City Impact Fee (Town of Blythewood, Commercial)$0.00Town of Blythewood
- County Impact Fee (Richland County, Commercial)$0.00Richland CountyRichland County has no adopted development impact fee. County Council has studied one since 2022 and tabled the next step in October 2025.
Where in Richland County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blythewood: Industrial Impact Fees
Industrial development in Blythewood pays no per-square-foot impact fees, but owes $8,300.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 50,000 sq ft building, that comes to about $8,300.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity) ($7,250.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Service Connection Charge (Palmetto Utilities) and Sewer Plant Impact Fee (Palmetto Utilities) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Blythewood Impact Fee Schedule
- Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity)$7,250.00 one-timeTown of WinnsboroMost of Blythewood gets water from the Town of Winnsboro, which charges its out-of-town tap fee plus a water capacity fee. Shown for a 1-inch meter: $3,500 tap plus $3,750 capacity, from the schedule effective July 1, 2024. The southern part of town is served by City of Columbia Water instead.
- Sewer Plant Impact Fee (Palmetto Utilities)$800.00 one-timeRequires confirmationPalmetto Utilities, Inc.Palmetto Utilities plant impact fee: $800 per single-family equivalent, multiplied by the project's equivalency rating above one, plus the utility's income-tax gross-up. Paid in addition to the $250 connection charge.
- Sewer Service Connection Charge (Palmetto Utilities)$250.00 one-timeRequires confirmationPalmetto Utilities, Inc.Sewer in Blythewood is provided by Palmetto Utilities. Its connection charge is $250 per single-family equivalent, multiplied by the project's equivalency rating above one (set from DHEC loading guidelines), plus an income-tax gross-up the utility adds. A separate plant impact fee also applies.
- City Impact Fee (Town of Blythewood, Industrial)$0.00Town of Blythewood
- County Impact Fee (Richland County, Industrial)$0.00Richland CountyRichland County has no adopted development impact fee. County Council has studied one since 2022 and tabled the next step in October 2025.
Where in Richland County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blythewood: Office Impact Fees
Office development in Blythewood pays no per-square-foot impact fees, but owes $8,300.00 in one-time water and sewer connection fees (rates sourced November 14, 2026).
For a 25,000 sq ft building, that comes to about $8,300.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity) ($7,250.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Service Connection Charge (Palmetto Utilities) and Sewer Plant Impact Fee (Palmetto Utilities) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Blythewood Impact Fee Schedule
- Water Tap Fee — Town of Winnsboro (out-of-town), 1" meter ($3,500 tap + $3,750 capacity)$7,250.00 one-timeTown of WinnsboroMost of Blythewood gets water from the Town of Winnsboro, which charges its out-of-town tap fee plus a water capacity fee. Shown for a 1-inch meter: $3,500 tap plus $3,750 capacity, from the schedule effective July 1, 2024. The southern part of town is served by City of Columbia Water instead.
- Sewer Plant Impact Fee (Palmetto Utilities)$800.00 one-timeRequires confirmationPalmetto Utilities, Inc.Palmetto Utilities plant impact fee: $800 per single-family equivalent, multiplied by the project's equivalency rating above one, plus the utility's income-tax gross-up. Paid in addition to the $250 connection charge.
- Sewer Service Connection Charge (Palmetto Utilities)$250.00 one-timeRequires confirmationPalmetto Utilities, Inc.Sewer in Blythewood is provided by Palmetto Utilities. Its connection charge is $250 per single-family equivalent, multiplied by the project's equivalency rating above one (set from DHEC loading guidelines), plus an income-tax gross-up the utility adds. A separate plant impact fee also applies.
- City Impact Fee (Town of Blythewood, Office)$0.00Town of Blythewood
- County Impact Fee (Richland County, Office)$0.00Richland CountyRichland County has no adopted development impact fee. County Council has studied one since 2022 and tabled the next step in October 2025.
Where in Richland County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blythewood Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Development Impact Fees Work in South Carolina
South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.
Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.
Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).
Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Blythewood Impact Fee FAQs
What are the total impact fees for a single-family home in Blythewood, South Carolina?
A new single-family home in Blythewood pays $7,990.00 per unit in combined impact fees (rates sourced November 14, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Blythewood?
Commercial development in Blythewood pays no per-square-foot impact fees, but owes $8,300.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Blythewood charge its own impact fees?
Yes. Blythewood levies its own municipal impact or utility fees. Richland County does not currently add county-level impact fees inside Blythewood. The schedule on this page shows every fee that applies to development in Blythewood.
Can a South Carolina impact fee be raised after it is adopted?
Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Richland County impact fees page.