Columbia applies its own fee schedule. Richland County does not currently add county-level impact fees inside city limits. A new single-family home pays $6,452.00 per unit (rates sourced ). The full breakdown is below.

Columbia Impact Fees by Project Type

Columbia: Single-Family Impact Fees

A new single-family home in Columbia pays $6,452.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Capacity Fee (City of Columbia) ($2,640.00), Water Tap Fee (City of Columbia) ($2,512.00) and Sewer Tap Fee (City of Columbia) ($1,300.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Columbia Impact Fee Schedule
Water$2,512.00
  • Water Tap Fee (City of Columbia)
    City makes the tap, 3/4" meter
    City of Columbia
    City of Columbia water tap and meter fee for a 3/4 inch meter where the City makes a new tap. Where the developer installs the tap, only the meter installation fee applies (see the developer-installed option).
    $2,512.00
Sewer$3,940.00
  • Sewer Capacity Fee (City of Columbia)
    City of Columbia
    City of Columbia sewer capacity fee of $2,640 per tap (one tap equals 400 gallons per day), charged in addition to the sewer tap fee and paid before connection.
    $2,640.00
  • Sewer Tap Fee (City of Columbia)
    City-installed tap
    City of Columbia
    City of Columbia residential sewer tap fee where the City makes a new tap, charged with the separate sewer plant expansion fee. Where the developer installs the sewer connection, a lower fee applies (see the developer-installed option).
    $1,300.00
City$0.00
County$0.00
  • County Impact Fee (Richland County)
    Richland County
    Richland County has no adopted development impact fee. County Council has studied one since 2022 and tabled the next step in October 2025.
    $0.00
Total (Columbia): $6,452.00
Sources last checked Official fee schedules:City of Columbia Richland County

Where in Richland County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Columbia: Multifamily Impact Fees

A new multifamily unit in Columbia pays $5,297.00 per unit in impact fees (rates sourced November 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Tap Fee (City of Columbia, MF) — City makes the tap, 3/4" meter ($2,512.00), Sewer Capacity Fee (City of Columbia, MF) — 2BR = 225 gpd / 400 gpd per ERU × $2,640/ERU ($1,485.00) and Sewer Tap Fee (City of Columbia, MF) ($1,300.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Columbia Impact Fee Schedule
Water$2,512.00
  • Water Tap Fee (City of Columbia, MF) — City makes the tap, 3/4" meter
    City of Columbia
    City of Columbia water tap and meter fee for a 3/4 inch meter where the City makes a new tap, shown for one unit on its own connection. A building served through one master meter pays once at that meter's size (1.5 inch $4,350, 2 inch $8,490). Where the developer installs the tap, only the meter fee applies (see the developer-installed option). Columbia has no water capacity or impact fee.
    $2,512.00
Sewer$2,785.00
  • Sewer Capacity Fee (City of Columbia, MF) — 2BR = 225 gpd / 400 gpd per ERU × $2,640/ERU
    2 bedroom (225 GPD)
    City of Columbia
    City of Columbia sewer capacity fee of $2,640 per tap, where one tap equals 400 gallons per day. Columbia's loading table puts a 2 bedroom apartment at 225 gallons per day, so each unit pays 0.5625 of the fee. Charged in addition to the sewer tap fee.
    $1,485.00
  • Sewer Tap Fee (City of Columbia, MF)
    City-installed tap
    City of Columbia
    City of Columbia sewer tap fee where the City makes a new tap, shown for one unit on its own connection and charged with the separate sewer plant expansion fee. A building on one sewer connection pays once. Where the developer installs the connection, a lower fee applies (see the developer-installed option).
    $1,300.00
City$0.00
County$0.00
  • County Impact Fee (Richland County, MF)
    Richland County
    Richland County has no adopted development impact fee. County Council has studied one since 2022 and tabled the next step in October 2025.
    $0.00
Total (Columbia): $5,297.00
Sources last checked Official fee schedules:City of Columbia Richland County

Where in Richland County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Columbia: Commercial Impact Fees

Commercial development in Columbia pays no per-square-foot impact fees, but owes $7,408.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $7,408.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap & Meter Fee (City of Columbia) — 1" meter ($3,468.00 one-time), Sewer Capacity Fee (City of Columbia) — per 400 GPD tap ($2,640.00 one-time) and Sewer Tap Fee (City of Columbia) ($1,300.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Columbia Impact Fee Schedule
Water$3,468.00 one-time
  • Water Tap & Meter Fee (City of Columbia) — 1" meter
    City of Columbia
    Water provided by City of Columbia Water. City-made tap and meter fee by meter size, 1-inch meter shown as the default, rates effective July 1, 2026. No separate water capacity or impact fee.
    $3,468.00 one-time
Sewer$3,940.00 one-time
  • Sewer Capacity Fee (City of Columbia) — per 400 GPD tap
    City of Columbia
    City of Columbia sewer capacity fee: $2,640 per tap, where one tap equals 400 gallons per day of flow and flow beyond the first whole tap is charged in tenths. The amount shown is one tap; discharges over 300,000 gallons per day add $1 per gallon per day. On redevelopment, credit is given for the existing water meter size, and commercial accounts under 4 inches that change use without upsizing the meter pay no capacity fee. Charged in addition to the sewer tap fee.
    $2,640.00 one-time
  • Sewer Tap Fee (City of Columbia)
    City-installed tap
    City of Columbia
    Sewer provided by the City of Columbia. A city-installed sewer tap is $1,300 per tap (a developer-installed tap is $300). The separate sewer capacity fee is charged in addition.
    $1,300.00 one-time
County$0.00
Total (Columbia): $7,408.00 one-time (≈ $7,408.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Columbia Richland County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Richland County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Columbia: Industrial Impact Fees

Industrial development in Columbia pays no per-square-foot impact fees, but owes $7,408.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 50,000 sq ft building, that comes to about $7,408.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap & Meter Fee (City of Columbia) — 1" meter ($3,468.00 one-time), Sewer Capacity Fee (City of Columbia) — per 400 GPD tap ($2,640.00 one-time) and Sewer Tap Fee (City of Columbia) ($1,300.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Columbia Impact Fee Schedule
Water$3,468.00 one-time
  • Water Tap & Meter Fee (City of Columbia) — 1" meter
    City of Columbia
    Water provided by City of Columbia Water. City-made tap and meter fee by meter size, 1-inch meter shown as the default, rates effective July 1, 2026. No separate water capacity or impact fee.
    $3,468.00 one-time
Sewer$3,940.00 one-time
  • Sewer Capacity Fee (City of Columbia) — per 400 GPD tap
    City of Columbia
    City of Columbia sewer capacity fee: $2,640 per tap, where one tap equals 400 gallons per day of flow and flow beyond the first whole tap is charged in tenths. The amount shown is one tap; discharges over 300,000 gallons per day add $1 per gallon per day. On redevelopment, credit is given for the existing water meter size, and commercial accounts under 4 inches that change use without upsizing the meter pay no capacity fee. Charged in addition to the sewer tap fee.
    $2,640.00 one-time
  • Sewer Tap Fee (City of Columbia)
    City-installed tap
    City of Columbia
    Sewer provided by the City of Columbia. A city-installed sewer tap is $1,300 per tap (a developer-installed tap is $300). The separate sewer capacity fee is charged in addition.
    $1,300.00 one-time
County$0.00
Total (Columbia): $7,408.00 one-time (≈ $7,408.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Columbia Richland County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Richland County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Columbia: Office Impact Fees

Office development in Columbia pays no per-square-foot impact fees, but owes $7,408.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).

For a 25,000 sq ft building, that comes to about $7,408.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Tap & Meter Fee (City of Columbia) — 1" meter ($3,468.00 one-time), Sewer Capacity Fee (City of Columbia) — per 400 GPD tap ($2,640.00 one-time) and Sewer Tap Fee (City of Columbia) ($1,300.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Columbia Impact Fee Schedule
Water$3,468.00 one-time
  • Water Tap & Meter Fee (City of Columbia) — 1" meter
    City of Columbia
    Water provided by City of Columbia Water. City-made tap and meter fee by meter size, 1-inch meter shown as the default, rates effective July 1, 2026. No separate water capacity or impact fee.
    $3,468.00 one-time
Sewer$3,940.00 one-time
  • Sewer Capacity Fee (City of Columbia) — per 400 GPD tap
    City of Columbia
    City of Columbia sewer capacity fee: $2,640 per tap, where one tap equals 400 gallons per day of flow and flow beyond the first whole tap is charged in tenths. The amount shown is one tap; discharges over 300,000 gallons per day add $1 per gallon per day. On redevelopment, credit is given for the existing water meter size, and commercial accounts under 4 inches that change use without upsizing the meter pay no capacity fee. Charged in addition to the sewer tap fee.
    $2,640.00 one-time
  • Sewer Tap Fee (City of Columbia)
    City-installed tap
    City of Columbia
    Sewer provided by the City of Columbia. A city-installed sewer tap is $1,300 per tap (a developer-installed tap is $300). The separate sewer capacity fee is charged in addition.
    $1,300.00 one-time
City$0.00
County$0.00
Total (Columbia): $7,408.00 one-time (≈ $7,408.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Columbia Richland County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Richland County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Columbia Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Development Impact Fees Work in South Carolina

South Carolina counties and municipalities assess development impact fees under the Development Impact Fee Act (S.C. Code 6-1-910 et seq.). Only a government with a comprehensive plan (or a capital improvements plan that substantially complies with the Act) may impose one, by an ordinance approved by a positive majority, and before charging residential units it must report how the fee affects the availability of affordable housing.

Fees may fund only the public facilities the Act lists: water and wastewater, solid waste, roads and bridges, stormwater and flood control, public safety (law enforcement, fire, emergency medical and street lighting), capital equipment and vehicles of at least $100,000 a unit, parks, libraries and recreation, and, since 2016, K-12 public school facilities. A fee may not exceed the development's proportionate share of the cost, after credits for land, money or improvements the developer contributes and for other funding sources.

Fee revenue is kept in interest-bearing accounts by category and service area and spent only on that category in that area. A fee not spent within three years of the date it was scheduled to be spent, or paid on a building permit that is denied, is refunded with its share of interest. The fee is due no earlier than the building permit (or the development permit where no building permit is needed).

Water and sewer charges usually come from the utility that serves a parcel: the Act's definition of an impact fee excludes connection or hookup charges, and a water or wastewater provider meeting the conditions of 6-1-1080 sets its impact fees outside the Act. That is why totals differ between a city, its neighbors and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Columbia Impact Fee FAQs

What are the total impact fees for a single-family home in Columbia, South Carolina?

A new single-family home in Columbia pays $6,452.00 per unit in combined impact fees (rates sourced November 18, 2026).

How much are commercial impact fees in Columbia?

Commercial development in Columbia pays no per-square-foot impact fees, but owes $7,408.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Columbia charge its own impact fees?

Yes. Columbia levies its own municipal impact or utility fees. Richland County does not currently add county-level impact fees inside Columbia. The schedule on this page shows every fee that applies to development in Columbia.

Can a South Carolina impact fee be raised after it is adopted?

Only through a new ordinance. Under S.C. Code 6-1-940 the government is bound by the amount its impact fee ordinance sets for each unit of development and may not charge higher or additional impact fees for the same purpose unless the project's service units increase or its scope changes, and then only for the added share. Water and sewer capacity and tap fees set by utilities follow each provider's own rate process.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Richland County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000