Angleton applies its own fee schedule: municipal fees plus the Brazoria County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $1,668.00 per unit (rates sourced ). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Angleton Impact Fees by Project Type

Angleton: Single-Family Impact Fees

A new single-family home in Angleton pays at least $1,668.00 per unit in impact fees (rates sourced November 17, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (City of Angleton) — 4" tap ($700.00), Water Meter Installation Fee (City of Angleton) — 3/4" meter ($500.00) and Sewer Capital Cost Recovery Fee (City of Angleton) ($312.00).

Utility Impact Fee (City of Angleton) — designated impact fee areas is set by the utility and not published online. County Impact Fee (Brazoria County) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Angleton Impact Fee Schedule
Water$656.00
Sewer$1,012.00
  • Sewer Tap Fee (City of Angleton) — 4" tap
    City of Angleton
    City of Angleton one-time 4-inch sewer tap fee. The sewer capital cost recovery fee is charged in addition.
    $700.00
  • Sewer Capital Cost Recovery Fee (City of Angleton)
    City of Angleton
    City of Angleton one-time residential sewer capital cost recovery fee inside the city limits; the outside-city fee is double. A sewer tap fee is charged in addition, and larger developments may owe a capacity acquisition fee set by study.
    $312.00
City$0.00
County$0.00
  • County Impact Fee (Brazoria County)
    Brazoria County
    No Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
    Requires confirmation
Total (Angleton): $1,668.00
Sources last checked Official fee schedules:City of Angleton Brazoria County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brazoria County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Angleton: Multifamily Impact Fees

A new multifamily unit in Angleton pays at least $1,668.00 per unit in impact fees (rates sourced November 17, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (City of Angleton, MF) — 4" tap ($700.00), Water Meter Installation Fee (City of Angleton, MF) — 3/4" meter ($500.00) and Sewer Capital Cost Recovery Fee (City of Angleton, MF) ($312.00).

Utility Impact Fee (City of Angleton, MF) — designated impact fee areas is set by the utility and not published online. County Impact Fee (Brazoria County, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Angleton Impact Fee Schedule
Water$656.00
Sewer$1,012.00
City$0.00
County$0.00
  • County Impact Fee (Brazoria County, MF)
    Brazoria County
    No Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
    Requires confirmation
Total (Angleton): $1,668.00
Sources last checked Official fee schedules:City of Angleton Brazoria County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brazoria County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Angleton: Commercial Impact Fees

Commercial development in Angleton pays no per-square-foot impact fees, but owes $1,843.00 in one-time water and sewer connection fees (rates sourced November 17, 2026).

For a 50,000 sq ft building, that comes to at least $1,843.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Angleton) — 4" tap ($700.00 one-time), Water Meter Installation Fee (City of Angleton) — 1" meter ($575.00 one-time) and Sewer Capital Cost Recovery Fee (City of Angleton) — per restroom ($400.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Utility Impact Fee (City of Angleton) — designated impact fee areas, Sewer Capacity Acquisition Fee (City of Angleton), and Water Capacity Acquisition Fee (City of Angleton) are set by the utility and not published online. County Impact Fee (Brazoria County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Angleton Impact Fee Schedule
Water$743.00 one-time
  • Water Meter Installation Fee (City of Angleton) — 1" meter
    City of Angleton
    One-time water meter installation fee charged by the City of Angleton by meter size (3/4 in. $500, 1 in. $575, 1.5 in. $1,000, 2 in. $1,200), adopted February and March 2025. A separate water capital cost recovery fee applies by meter size.
    $575.00 one-time
  • Water Capital Cost Recovery Fee (City of Angleton) — 1" meter
    City of Angleton
    One-time water capital cost recovery fee inside the City of Angleton by meter size (3/4 in. $156, 1 in. $168, 1.5 in. $192, 2 in. $216); meters over 2 in. are set by the city administrator. Outside the city limits the fee doubles (3/4 in. $312, 1 in. $336, 1.5 in. $384, 2 in. $432). Adopted February and March 2025.
    $168.00 one-time
  • Utility Impact Fee (City of Angleton) — designated impact fee areas
    City of Angleton
    Water and wastewater impact fees apply in Angleton's SH 288 and CR 220 development areas under City Code Chapter 26, Article VIII; utility accounts in those areas get a lower monthly base rate. The amounts are not published in the city fee schedule.
    Requires confirmation
  • Water Capacity Acquisition Fee (City of Angleton)
    City of Angleton
    The City of Angleton charges a water capacity acquisition fee set by the City Engineer for each nonresidential project under the Land Development Code; the schedule prints $536.70 per dwelling unit for residential use.
    Requires confirmation
Sewer$1,100.00 one-time
  • Sewer Tap Fee (City of Angleton) — 4" tap
    City of Angleton
    One-time sewer tap fee charged by the City of Angleton by tap size: 4 in. $700, 6 in. $950. Adopted February and March 2025.
    $700.00 one-time
  • Sewer Capital Cost Recovery Fee (City of Angleton) — per restroom
    City of Angleton
    One-time nonresidential sewer capital cost recovery fee of $400 per restroom inside the City of Angleton ($800 per restroom outside the city limits); the amount shown is for one restroom. Adopted February and March 2025.
    $400.00 one-time
  • Sewer Capacity Acquisition Fee (City of Angleton)
    City of Angleton
    The City of Angleton computes a sanitary sewer capacity acquisition fee for each development from the improvements it requires (treatment plant, lift station and collection lines), based on a capacity study that carries a $4,000 study fee.
    Requires confirmation
City$0.00
  • City Impact Fee (City of Angleton, Commercial)
    City of Angleton
    The City of Angleton charges no roadway impact fee. Water and wastewater impact fees apply only in the SH 288 and CR 220 development areas and are listed under water and sewer. The city accepted a utility master plan in January 2026 and has started work toward a city-wide impact fee.
    $0.00
County$0.00
  • County Impact Fee (Brazoria County, Commercial)
    Brazoria County
    No Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
    Requires confirmation
Total (Angleton): $1,843.00 one-time (≈ $1,843.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Angleton Brazoria County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brazoria County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Angleton: Industrial Impact Fees

Industrial development in Angleton pays no per-square-foot impact fees, but owes $1,843.00 in one-time water and sewer connection fees (rates sourced November 17, 2026).

For a 50,000 sq ft building, that comes to at least $1,843.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Angleton) — 4" tap ($700.00 one-time), Water Meter Installation Fee (City of Angleton) — 1" meter ($575.00 one-time) and Sewer Capital Cost Recovery Fee (City of Angleton) — per restroom ($400.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Utility Impact Fee (City of Angleton) — designated impact fee areas, Sewer Capacity Acquisition Fee (City of Angleton), and Water Capacity Acquisition Fee (City of Angleton) are set by the utility and not published online. County Impact Fee (Brazoria County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Angleton Impact Fee Schedule
Water$743.00 one-time
  • Water Meter Installation Fee (City of Angleton) — 1" meter
    City of Angleton
    One-time water meter installation fee charged by the City of Angleton by meter size (3/4 in. $500, 1 in. $575, 1.5 in. $1,000, 2 in. $1,200), adopted February and March 2025. A separate water capital cost recovery fee applies by meter size.
    $575.00 one-time
  • Water Capital Cost Recovery Fee (City of Angleton) — 1" meter
    City of Angleton
    One-time water capital cost recovery fee inside the City of Angleton by meter size (3/4 in. $156, 1 in. $168, 1.5 in. $192, 2 in. $216); meters over 2 in. are set by the city administrator. Outside the city limits the fee doubles (3/4 in. $312, 1 in. $336, 1.5 in. $384, 2 in. $432). Adopted February and March 2025.
    $168.00 one-time
  • Utility Impact Fee (City of Angleton) — designated impact fee areas
    City of Angleton
    Water and wastewater impact fees apply in Angleton's SH 288 and CR 220 development areas under City Code Chapter 26, Article VIII; utility accounts in those areas get a lower monthly base rate. The amounts are not published in the city fee schedule.
    Requires confirmation
  • Water Capacity Acquisition Fee (City of Angleton)
    City of Angleton
    The City of Angleton charges a water capacity acquisition fee set by the City Engineer for each nonresidential project under the Land Development Code; the schedule prints $536.70 per dwelling unit for residential use.
    Requires confirmation
Sewer$1,100.00 one-time
  • Sewer Tap Fee (City of Angleton) — 4" tap
    City of Angleton
    One-time sewer tap fee charged by the City of Angleton by tap size: 4 in. $700, 6 in. $950. Adopted February and March 2025.
    $700.00 one-time
  • Sewer Capital Cost Recovery Fee (City of Angleton) — per restroom
    City of Angleton
    One-time nonresidential sewer capital cost recovery fee of $400 per restroom inside the City of Angleton ($800 per restroom outside the city limits); the amount shown is for one restroom. Adopted February and March 2025.
    $400.00 one-time
  • Sewer Capacity Acquisition Fee (City of Angleton)
    City of Angleton
    The City of Angleton computes a sanitary sewer capacity acquisition fee for each development from the improvements it requires (treatment plant, lift station and collection lines), based on a capacity study that carries a $4,000 study fee.
    Requires confirmation
City$0.00
  • City Impact Fee (City of Angleton, Industrial)
    City of Angleton
    The City of Angleton charges no roadway impact fee. Water and wastewater impact fees apply only in the SH 288 and CR 220 development areas and are listed under water and sewer. The city accepted a utility master plan in January 2026 and has started work toward a city-wide impact fee.
    $0.00
County$0.00
  • County Impact Fee (Brazoria County, Industrial)
    Brazoria County
    No Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
    Requires confirmation
Total (Angleton): $1,843.00 one-time (≈ $1,843.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Angleton Brazoria County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brazoria County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Angleton: Office Impact Fees

Office development in Angleton pays no per-square-foot impact fees, but owes $1,843.00 in one-time water and sewer connection fees (rates sourced November 17, 2026).

For a 25,000 sq ft building, that comes to at least $1,843.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Angleton) — 4" tap ($700.00 one-time), Water Meter Installation Fee (City of Angleton) — 1" meter ($575.00 one-time) and Sewer Capital Cost Recovery Fee (City of Angleton) — per restroom ($400.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Utility Impact Fee (City of Angleton) — designated impact fee areas, Sewer Capacity Acquisition Fee (City of Angleton), and Water Capacity Acquisition Fee (City of Angleton) are set by the utility and not published online. County Impact Fee (Brazoria County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Angleton Impact Fee Schedule
Water$743.00 one-time
  • Water Meter Installation Fee (City of Angleton) — 1" meter
    City of Angleton
    One-time water meter installation fee charged by the City of Angleton by meter size (3/4 in. $500, 1 in. $575, 1.5 in. $1,000, 2 in. $1,200), adopted February and March 2025. A separate water capital cost recovery fee applies by meter size.
    $575.00 one-time
  • Water Capital Cost Recovery Fee (City of Angleton) — 1" meter
    City of Angleton
    One-time water capital cost recovery fee inside the City of Angleton by meter size (3/4 in. $156, 1 in. $168, 1.5 in. $192, 2 in. $216); meters over 2 in. are set by the city administrator. Outside the city limits the fee doubles (3/4 in. $312, 1 in. $336, 1.5 in. $384, 2 in. $432). Adopted February and March 2025.
    $168.00 one-time
  • Utility Impact Fee (City of Angleton) — designated impact fee areas
    City of Angleton
    Water and wastewater impact fees apply in Angleton's SH 288 and CR 220 development areas under City Code Chapter 26, Article VIII; utility accounts in those areas get a lower monthly base rate. The amounts are not published in the city fee schedule.
    Requires confirmation
  • Water Capacity Acquisition Fee (City of Angleton)
    City of Angleton
    The City of Angleton charges a water capacity acquisition fee set by the City Engineer for each nonresidential project under the Land Development Code; the schedule prints $536.70 per dwelling unit for residential use.
    Requires confirmation
Sewer$1,100.00 one-time
  • Sewer Tap Fee (City of Angleton) — 4" tap
    City of Angleton
    One-time sewer tap fee charged by the City of Angleton by tap size: 4 in. $700, 6 in. $950. Adopted February and March 2025.
    $700.00 one-time
  • Sewer Capital Cost Recovery Fee (City of Angleton) — per restroom
    City of Angleton
    One-time nonresidential sewer capital cost recovery fee of $400 per restroom inside the City of Angleton ($800 per restroom outside the city limits); the amount shown is for one restroom. Adopted February and March 2025.
    $400.00 one-time
  • Sewer Capacity Acquisition Fee (City of Angleton)
    City of Angleton
    The City of Angleton computes a sanitary sewer capacity acquisition fee for each development from the improvements it requires (treatment plant, lift station and collection lines), based on a capacity study that carries a $4,000 study fee.
    Requires confirmation
City$0.00
  • City Impact Fee (City of Angleton, Office)
    City of Angleton
    The City of Angleton charges no roadway impact fee. Water and wastewater impact fees apply only in the SH 288 and CR 220 development areas and are listed under water and sewer. The city accepted a utility master plan in January 2026 and has started work toward a city-wide impact fee.
    $0.00
County$0.00
  • County Impact Fee (Brazoria County, Office)
    Brazoria County
    No Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
    Requires confirmation
Total (Angleton): $1,843.00 one-time (≈ $1,843.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Angleton Brazoria County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brazoria County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Angleton Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Angleton Impact Fee FAQs

What are the total impact fees for a single-family home in Angleton, Texas?

A new single-family home in Angleton pays at least $1,668.00 per unit in combined impact fees (rates sourced November 17, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Angleton?

Commercial development in Angleton pays no per-square-foot impact fees, but owes $1,843.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 4 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Angleton charge its own impact fees?

Yes. Angleton levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Angleton, with the combined total.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Brazoria County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.