Lake Jackson Impact Fees by Project Type
Lake Jackson: Single-Family Impact Fees
A new single-family home in Lake Jackson pays at least $2,100.00 per unit in impact fees (rates sourced November 17, 2026). Every line item is levied at the municipal or utility level.
Water Tap Fee (City of Lake Jackson) — 3/4" tap and Sewer Tap Fee (City of Lake Jackson) — 4" line are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
County Impact Fee (Brazoria County) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lake Jackson Impact Fee Schedule
- Water Tap Fee (City of Lake Jackson) — 3/4" tap$1,100.00Requires confirmationCity of Lake JacksonOne-time City of Lake Jackson water tap fee for a 3/4 in. tap; a 1 in. tap is $1,675 and a 2 in. tap $3,800, and 3 in. and larger taps are priced by the city. A separate tap inspection fee applies. No water impact fee.
- Sewer Tap Fee (City of Lake Jackson) — 4" line$1,000.00Requires confirmationCity of Lake JacksonOne-time City of Lake Jackson sewer tap fee for a 4 in. line; larger lines cost more (6 in. $1,150, 8 in. $1,200, 10 in. $1,500). A separate tap inspection fee applies. No wastewater impact fee.
- City Impact Fee (City of Lake Jackson)$0.00City of Lake JacksonNo city impact fee. New subdivisions dedicate parkland, or pay a per-lot amount in its place when the City Council accepts money instead.
- County Impact Fee (Brazoria County)Requires confirmationNo Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
Where in Brazoria County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Jackson: Multifamily Impact Fees
A new multifamily unit in Lake Jackson pays at least $2,100.00 per unit in impact fees (rates sourced November 17, 2026). Every line item is levied at the municipal or utility level.
Sewer Tap Fee (City of Lake Jackson, MF) and Water Tap Fee (City of Lake Jackson, MF) — 3/4" tap are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
County Impact Fee (Brazoria County, MF) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lake Jackson Impact Fee Schedule
- Water Tap Fee (City of Lake Jackson, MF) — 3/4" tap$1,100.00Requires confirmationCity of Lake JacksonOne-time City of Lake Jackson water tap fee, charged per tap, so a building on one tap pays once; shown for a 3/4 in. tap (1 in. $1,675, 2 in. $3,800; larger taps priced by the city). A separate tap inspection fee applies. No water impact fee.
- Sewer Tap Fee (City of Lake Jackson, MF)$1,000.00Requires confirmationCity of Lake JacksonOne-time City of Lake Jackson sewer tap fee, charged per tap, so a building on one tap pays once; shown for a 4 in. line. Larger lines cost more (6 in. $1,150, 8 in. $1,200, 10 in. $1,500). A separate tap inspection fee applies. No wastewater impact fee.
- City Impact Fee (City of Lake Jackson, MF)$0.00City of Lake JacksonNo city impact fee. New subdivisions dedicate parkland, or pay an amount per multifamily unit in its place when the City Council accepts money instead.
- County Impact Fee (Brazoria County, MF)Requires confirmationNo Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
Where in Brazoria County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Jackson: Commercial Impact Fees
Commercial development in Lake Jackson pays no per-square-foot impact fees, but owes $2,675.00 in one-time water and sewer connection fees (rates sourced November 17, 2026).
For a 50,000 sq ft building, that comes to at least $2,675.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (City of Lake Jackson) — 4" line and Water Tap Fee (City of Lake Jackson) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
County Impact Fee (Brazoria County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Lake Jackson Impact Fee Schedule
- Water Tap Fee (City of Lake Jackson) — 1" meter$1,675.00 one-timeRequires confirmationCity of Lake JacksonCity of Lake Jackson water tap fee by meter size, from the city's building permit application. Taps 3 inches and larger are priced by the city on request. A separate $150 water tap inspection fee applies.
- Sewer Tap Fee (City of Lake Jackson) — 4" line$1,000.00 one-timeRequires confirmationCity of Lake JacksonCity of Lake Jackson sewer tap fee by line size, from the city's building permit application. Taps outside city limits are completed by the developer's contractor. A separate $150 sewer tap inspection fee applies.
- City Impact Fee (City of Lake Jackson, Commercial)$0.00City of Lake JacksonThe City of Lake Jackson has not adopted impact fees. Water and sewer tap charges are listed separately.
- County Impact Fee (Brazoria County, Commercial)Requires confirmationBrazoria CountyNo Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
Where in Brazoria County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Jackson: Industrial Impact Fees
Industrial development in Lake Jackson pays no per-square-foot impact fees, but owes $2,675.00 in one-time water and sewer connection fees (rates sourced November 17, 2026).
For a 50,000 sq ft building, that comes to at least $2,675.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (City of Lake Jackson) — 4" line and Water Tap Fee (City of Lake Jackson) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
County Impact Fee (Brazoria County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Lake Jackson Impact Fee Schedule
- Water Tap Fee (City of Lake Jackson) — 1" meter$1,675.00 one-timeRequires confirmationCity of Lake JacksonCity of Lake Jackson water tap fee by meter size, from the city's building permit application. Taps 3 inches and larger are priced by the city on request. A separate $150 water tap inspection fee applies.
- Sewer Tap Fee (City of Lake Jackson) — 4" line$1,000.00 one-timeRequires confirmationCity of Lake JacksonCity of Lake Jackson sewer tap fee by line size, from the city's building permit application. Taps outside city limits are completed by the developer's contractor. A separate $150 sewer tap inspection fee applies.
- City Impact Fee (City of Lake Jackson, Industrial)$0.00City of Lake JacksonThe City of Lake Jackson has not adopted impact fees. Water and sewer tap charges are listed separately.
- County Impact Fee (Brazoria County, Industrial)Requires confirmationBrazoria CountyNo Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
Where in Brazoria County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Jackson: Office Impact Fees
Office development in Lake Jackson pays no per-square-foot impact fees, but owes $2,675.00 in one-time water and sewer connection fees (rates sourced November 17, 2026).
For a 25,000 sq ft building, that comes to at least $2,675.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Tap Fee (City of Lake Jackson) — 4" line and Water Tap Fee (City of Lake Jackson) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
County Impact Fee (Brazoria County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Lake Jackson Impact Fee Schedule
- Water Tap Fee (City of Lake Jackson) — 1" meter$1,675.00 one-timeRequires confirmationCity of Lake JacksonCity of Lake Jackson water tap fee by meter size, from the city's building permit application. Taps 3 inches and larger are priced by the city on request. A separate $150 water tap inspection fee applies.
- Sewer Tap Fee (City of Lake Jackson) — 4" line$1,000.00 one-timeRequires confirmationCity of Lake JacksonCity of Lake Jackson sewer tap fee by line size, from the city's building permit application. Taps outside city limits are completed by the developer's contractor. A separate $150 sewer tap inspection fee applies.
- City Impact Fee (City of Lake Jackson, Office)$0.00City of Lake JacksonThe City of Lake Jackson has not adopted impact fees. Water and sewer tap charges are listed separately.
- County Impact Fee (Brazoria County, Office)Requires confirmationBrazoria CountyNo Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
Where in Brazoria County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lake Jackson Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Lake Jackson Impact Fee FAQs
What are the total impact fees for a single-family home in Lake Jackson, Texas?
A new single-family home in Lake Jackson pays at least $2,100.00 per unit in combined impact fees (rates sourced November 17, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Lake Jackson?
Commercial development in Lake Jackson pays no per-square-foot impact fees, but owes $2,675.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Lake Jackson charge its own impact fees?
Yes. Lake Jackson levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Lake Jackson, with the combined total.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Brazoria County impact fees page.