Manvel, Texas Impact Fees

Manvel applies its own fee schedule: municipal fees plus the Brazoria County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $27,595.00 per unit (rates sourced ). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Manvel Impact Fees by Project Type

Manvel: Single-Family Impact Fees

A new single-family home in Manvel pays at least $27,595.00 per unit in impact fees (rates sourced November 26, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Manvel) — 3/4" meter ($19,937.00), Water Impact Fee (City of Manvel) — 3/4" meter ($5,458.00) and Parkland Dedication Fee in Lieu (City of Manvel) ($900.00).

County Impact Fee (Brazoria County) is set by the county and has no published standard rate. City Impact Fee (City of Manvel) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Manvel Impact Fee Schedule
Water$6,008.00
  • Water Impact Fee (City of Manvel) — 3/4" meter
    City of Manvel
    City of Manvel Chapter 395 water impact fee for a standard home meter (3/4 in., 1 equivalent single-family connection), adopted by Ordinance 2026-O-22 on 9/21/2026. Larger meters pay more. Charged where the city provides water; many subdivisions are served by municipal utility districts with their own fees.
    $5,458.00
  • Water Connection Fee (City of Manvel) — 3/4" meter
    City of Manvel
    City of Manvel water connection fee for a single-family home with a 3/4 in. meter; a larger meter is $750. Half the cost of any required road bore is added. Charged in addition to the water impact fee where the city provides water.
    $550.00
Sewer$20,687.00
  • Wastewater Impact Fee (City of Manvel) — 3/4" meter
    City of Manvel
    City of Manvel Chapter 395 wastewater impact fee for a standard home meter (3/4 in., 1 equivalent single-family connection), adopted by Ordinance 2026-O-22 on 9/21/2026. Larger meters pay more. Charged where the city provides wastewater service; many subdivisions are served by municipal utility districts with their own fees.
    $19,937.00
  • Sewer Connection Fee (City of Manvel)
    City of Manvel
    City of Manvel sewer connection fee for a single-family home, plus half the cost of any required road bore. Charged in addition to the wastewater impact fee where the city provides sewer.
    $750.00
City$900.00
County$0.00
  • County Impact Fee (Brazoria County)
    No Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
    Requires confirmation
Total (Manvel): $27,595.00
Sources last checked Official fee schedule:City of Manvel
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brazoria County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Manvel: Multifamily Impact Fees

A new multifamily unit in Manvel pays at least $26,295.00 per unit in impact fees (rates sourced November 26, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Manvel, MF) — 3/4" meter ($19,937.00), Water Impact Fee (City of Manvel, MF) — 3/4" meter ($5,458.00) and Parkland Dedication Fee in Lieu (City of Manvel, MF) ($900.00).

Water Connection Fee (City of Manvel, MF) and Sewer Connection Fee (City of Manvel, MF) are set by the utility and not published online. County Impact Fee (Brazoria County, MF) is set by the county and has no published standard rate. City Impact Fee (City of Manvel, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Manvel Impact Fee Schedule
Water$5,458.00
  • Water Impact Fee (City of Manvel, MF) — 3/4" meter
    City of Manvel
    City of Manvel Chapter 395 water impact fee, adopted by Ordinance 2026-O-22 on 9/21/2026. Charged by meter size, not per dwelling unit; shown for the smallest meter (3/4 in.), and a building on a larger master meter pays that meter's fee. Charged where the city provides water; many subdivisions are served by municipal utility districts.
    $5,458.00
  • Water Connection Fee (City of Manvel, MF)
    City of Manvel
    City of Manvel water connection fee for multifamily buildings is not published; the adopted schedule prices single-family connections only. A water impact fee also applies.
    Requires confirmation
Sewer$19,937.00
  • Wastewater Impact Fee (City of Manvel, MF) — 3/4" meter
    City of Manvel
    City of Manvel Chapter 395 wastewater impact fee, adopted by Ordinance 2026-O-22 on 9/21/2026. Charged by meter size, not per dwelling unit; shown for the smallest meter (3/4 in.), and a building on a larger master meter pays that meter's fee. Charged where the city provides wastewater service; many subdivisions are served by municipal utility districts.
    $19,937.00
  • Sewer Connection Fee (City of Manvel, MF)
    City of Manvel
    City of Manvel sets the multifamily sewer connection fee case by case from the facility's engineering requirements. A wastewater impact fee also applies.
    Requires confirmation
City$900.00
County$0.00
  • County Impact Fee (Brazoria County, MF)
    No Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
    Requires confirmation
Total (Manvel): $26,295.00
Sources last checked Official fee schedule:City of Manvel
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Brazoria County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Manvel: Commercial Impact Fees

Commercial development in Manvel pays no per-square-foot impact fees, but owes $40,631.00 in one-time water and sewer connection fees (rates sourced November 26, 2026).

For a 50,000 sq ft building, that comes to at least $40,631.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Manvel) — 1" meter ($31,899.00 one-time) and Water Impact Fee (City of Manvel) — 1" meter ($8,732.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Manvel) and Water Connection Fee (City of Manvel) are set by the utility and not published online. County Impact Fee (Brazoria County, Commercial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Manvel Impact Fee Schedule
Water$8,732.00 one-time
  • Water Impact Fee (City of Manvel) — 1" meter
    City of Manvel
    Chapter 395 water impact fee adopted by Ordinance 2026-O-22 on September 21, 2026, charged by meter size from $5,458 for a 3/4 inch meter (1 equivalent connection) up to $1,182,202 for a 10 inch meter; a 1 inch meter counts as 1.6 connections. It applies inside Manvel city limits where the City of Manvel provides water; many subdivisions are served by municipal utility districts that set their own fees. A separate wastewater impact fee and connection charges also apply.
    $8,732.00 one-time
  • Water Connection Fee (City of Manvel)
    City of Manvel
    The City of Manvel's published water connection fees cover single-family homes only; a nonresidential water connection charge is not published. Separate water and wastewater impact fees apply.
    Requires confirmation
Sewer$31,899.00 one-time
  • Wastewater Impact Fee (City of Manvel) — 1" meter
    City of Manvel
    Chapter 395 wastewater impact fee adopted by Ordinance 2026-O-22 on September 21, 2026, charged by water meter size from $19,937 for a 3/4 inch meter (1 equivalent connection) up to $4,318,354 for a 10 inch meter; a 1 inch meter counts as 1.6 connections. It applies inside Manvel city limits where the City of Manvel provides sewer service; many subdivisions are served by municipal utility districts that set their own fees.
    $31,899.00 one-time
  • Sewer Connection Fee (City of Manvel)
    City of Manvel
    The City of Manvel sets a nonresidential sewer connection fee case by case from the facility's engineering requirements. A separate wastewater impact fee applies.
    Requires confirmation
City$0.00
County$0.00
  • County Impact Fee (Brazoria County, Commercial)
    Brazoria County
    No Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
    Requires confirmation
Total (Manvel): $40,631.00 one-time (≈ $40,631.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Manvel Brazoria County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brazoria County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Manvel: Industrial Impact Fees

Industrial development in Manvel pays no per-square-foot impact fees, but owes $40,631.00 in one-time water and sewer connection fees (rates sourced November 26, 2026).

For a 50,000 sq ft building, that comes to at least $40,631.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Manvel) — 1" meter ($31,899.00 one-time) and Water Impact Fee (City of Manvel) — 1" meter ($8,732.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Manvel) and Water Connection Fee (City of Manvel) are set by the utility and not published online. County Impact Fee (Brazoria County, Industrial) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Manvel Impact Fee Schedule
Water$8,732.00 one-time
  • Water Impact Fee (City of Manvel) — 1" meter
    City of Manvel
    Chapter 395 water impact fee adopted by Ordinance 2026-O-22 on September 21, 2026, charged by meter size from $5,458 for a 3/4 inch meter (1 equivalent connection) up to $1,182,202 for a 10 inch meter; a 1 inch meter counts as 1.6 connections. It applies inside Manvel city limits where the City of Manvel provides water; many subdivisions are served by municipal utility districts that set their own fees. A separate wastewater impact fee and connection charges also apply.
    $8,732.00 one-time
  • Water Connection Fee (City of Manvel)
    City of Manvel
    The City of Manvel's published water connection fees cover single-family homes only; a nonresidential water connection charge is not published. Separate water and wastewater impact fees apply.
    Requires confirmation
Sewer$31,899.00 one-time
  • Wastewater Impact Fee (City of Manvel) — 1" meter
    City of Manvel
    Chapter 395 wastewater impact fee adopted by Ordinance 2026-O-22 on September 21, 2026, charged by water meter size from $19,937 for a 3/4 inch meter (1 equivalent connection) up to $4,318,354 for a 10 inch meter; a 1 inch meter counts as 1.6 connections. It applies inside Manvel city limits where the City of Manvel provides sewer service; many subdivisions are served by municipal utility districts that set their own fees.
    $31,899.00 one-time
  • Sewer Connection Fee (City of Manvel)
    City of Manvel
    The City of Manvel sets a nonresidential sewer connection fee case by case from the facility's engineering requirements. A separate wastewater impact fee applies.
    Requires confirmation
City$0.00
County$0.00
  • County Impact Fee (Brazoria County, Industrial)
    Brazoria County
    No Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
    Requires confirmation
Total (Manvel): $40,631.00 one-time (≈ $40,631.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Manvel Brazoria County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brazoria County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Manvel: Office Impact Fees

Office development in Manvel pays no per-square-foot impact fees, but owes $40,631.00 in one-time water and sewer connection fees (rates sourced November 26, 2026).

For a 25,000 sq ft building, that comes to at least $40,631.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Manvel) — 1" meter ($31,899.00 one-time) and Water Impact Fee (City of Manvel) — 1" meter ($8,732.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (City of Manvel) and Water Connection Fee (City of Manvel) are set by the utility and not published online. County Impact Fee (Brazoria County, Office) is set by the county and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Manvel Impact Fee Schedule
Water$8,732.00 one-time
  • Water Impact Fee (City of Manvel) — 1" meter
    City of Manvel
    Chapter 395 water impact fee adopted by Ordinance 2026-O-22 on September 21, 2026, charged by meter size from $5,458 for a 3/4 inch meter (1 equivalent connection) up to $1,182,202 for a 10 inch meter; a 1 inch meter counts as 1.6 connections. It applies inside Manvel city limits where the City of Manvel provides water; many subdivisions are served by municipal utility districts that set their own fees. A separate wastewater impact fee and connection charges also apply.
    $8,732.00 one-time
  • Water Connection Fee (City of Manvel)
    City of Manvel
    The City of Manvel's published water connection fees cover single-family homes only; a nonresidential water connection charge is not published. Separate water and wastewater impact fees apply.
    Requires confirmation
Sewer$31,899.00 one-time
  • Wastewater Impact Fee (City of Manvel) — 1" meter
    City of Manvel
    Chapter 395 wastewater impact fee adopted by Ordinance 2026-O-22 on September 21, 2026, charged by water meter size from $19,937 for a 3/4 inch meter (1 equivalent connection) up to $4,318,354 for a 10 inch meter; a 1 inch meter counts as 1.6 connections. It applies inside Manvel city limits where the City of Manvel provides sewer service; many subdivisions are served by municipal utility districts that set their own fees.
    $31,899.00 one-time
  • Sewer Connection Fee (City of Manvel)
    City of Manvel
    The City of Manvel sets a nonresidential sewer connection fee case by case from the facility's engineering requirements. A separate wastewater impact fee applies.
    Requires confirmation
City$0.00
County$0.00
  • County Impact Fee (Brazoria County, Office)
    Brazoria County
    No Brazoria County impact fee has been adopted. Texas law limits county impact fees to drainage facilities; county plat, septic and permit fees are separate.
    Requires confirmation
Total (Manvel): $40,631.00 one-time (≈ $40,631.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Manvel Brazoria County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Brazoria County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Manvel Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Manvel Impact Fee FAQs

What are the total impact fees for a single-family home in Manvel, Texas?

A new single-family home in Manvel pays at least $27,595.00 per unit in combined impact fees (rates sourced November 26, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Manvel?

Commercial development in Manvel pays no per-square-foot impact fees, but owes $40,631.00 in one-time water and sewer connection fees (assuming a 1-inch meter). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Manvel charge its own impact fees?

Yes. Manvel levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Manvel, with the combined total.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Brazoria County impact fees page.