Shenandoah, Texas Impact Fees

Shenandoah applies its own fee schedule. Montgomery County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $5,533.70 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Shenandoah Impact Fees by Project Type

Shenandoah: Single-Family Impact Fees

A new single-family home in Shenandoah pays at least $5,533.70 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

Wastewater Impact Fee (City of Shenandoah) and Water Impact Fee (City of Shenandoah) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Sewer Tap Inspection Fee (City of Shenandoah) and Water Tap Fee (City of Shenandoah) are set by the utility and not published online. City Impact Fee (City of Shenandoah) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Shenandoah Impact Fee Schedule
Water$841.21
  • Water Impact Fee (City of Shenandoah)
    City of Shenandoah
    City of Shenandoah water impact fee of $841.21 per service unit, adopted October 22, 2025 (Ordinance O-25-022), replacing $1,962. A single-family home up to 3,000 sq ft is one service unit, plus 0.0002 service units per sq ft above 3,000. The fee is assessed when the final plat is recorded, or at building permit or utility connection where no plat is required, and a development keeps the rate assessed then. Applies citywide.
    $841.21Requires confirmation
  • Water Tap Fee (City of Shenandoah)
    City of Shenandoah
    The city also charges a residential water tap fee, which includes the meter, meter box and installation, set by meter size (3/4 inch or less, 1 inch and 1 1/2 inch). The amounts are kept on file at City Hall rather than in the code.
    Requires confirmation
Sewer$4,692.49
  • Wastewater Impact Fee (City of Shenandoah)
    City of Shenandoah
    City of Shenandoah wastewater impact fee of $4,692.49 per service unit, adopted October 22, 2025 (Ordinance O-25-022), replacing $2,522. A single-family home up to 3,000 sq ft is one service unit, plus 0.0002 service units per sq ft above 3,000. The fee is assessed when the final plat is recorded, or at building permit or utility connection where no plat is required, and a development keeps the rate assessed then. Applies citywide.
    $4,692.49Requires confirmation
  • Sewer Tap Inspection Fee (City of Shenandoah)
    City of Shenandoah
    Residential sewer taps are made by the owner's plumber, and the city charges an inspection fee per sewer tap; the amount is kept on file at City Hall rather than in the code.
    Requires confirmation
City$0.00
  • City Impact Fee (City of Shenandoah)
    City of Shenandoah
    Shenandoah has no roadway impact fee. Subdivisions may be required to dedicate parkland to the city; a fee in lieu of dedication is referenced but no amount is published.
    Requires confirmation
County$0.00
  • County Impact Fee (Montgomery County)
    Montgomery County
    Texas counties do not charge development impact fees under Local Government Code Chapter 395, and Montgomery County has adopted no drainage impact fee.
    $0.00
Total (Shenandoah): $5,533.70
Sources last checked Official fee schedules:City of Shenandoah Montgomery County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Montgomery County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Shenandoah: Multifamily Impact Fees

A new multifamily unit in Shenandoah pays at least $2,635.14 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

Water Impact Fee (City of Shenandoah, MF) — 0.4762 SU × $841.21/SU and Wastewater Impact Fee (City of Shenandoah, MF) — 0.4762 SU × $4,692.49/SU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Sewer Tap Inspection Fee (City of Shenandoah, MF) and Water Tap Fee (City of Shenandoah, MF) are set by the utility and not published online. City Impact Fee (City of Shenandoah, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Shenandoah Impact Fee Schedule
Water$400.58
  • Water Impact Fee (City of Shenandoah, MF) — 0.4762 SU × $841.21/SU
    City of Shenandoah
    City of Shenandoah water impact fee of $841.21 per service unit, adopted October 22, 2025 (Ordinance O-25-022). The city's impact fee study counts a multifamily unit as 0.4762 service units; an apartment without an in-unit washer and dryer counts as 0.4046 service units. Assessed when the final plat is recorded, or at building permit or utility connection where no plat is required.
    $400.58Requires confirmation
  • Water Tap Fee (City of Shenandoah, MF)
    City of Shenandoah
    The city also charges a water tap fee, which includes the meter, meter box and installation, set by meter size; the amounts are kept on file at City Hall rather than in the code.
    Requires confirmation
Sewer$2,234.56
  • Wastewater Impact Fee (City of Shenandoah, MF) — 0.4762 SU × $4,692.49/SU
    City of Shenandoah
    City of Shenandoah wastewater impact fee of $4,692.49 per service unit, adopted October 22, 2025 (Ordinance O-25-022). The city's impact fee study counts a multifamily unit as 0.4762 service units; an apartment without an in-unit washer and dryer counts as 0.4046 service units. Assessed when the final plat is recorded, or at building permit or utility connection where no plat is required.
    $2,234.56Requires confirmation
  • Sewer Tap Inspection Fee (City of Shenandoah, MF)
    City of Shenandoah
    Sewer taps are made by the owner's plumber, and the city charges an inspection fee per sewer tap; the amount is kept on file at City Hall rather than in the code.
    Requires confirmation
City$0.00
  • City Impact Fee (City of Shenandoah, MF)
    City of Shenandoah
    Shenandoah has no roadway impact fee. Subdivisions may be required to dedicate parkland to the city; a fee in lieu of dedication is referenced but no amount is published.
    Requires confirmation
County$0.00
  • County Impact Fee (Montgomery County, MF)
    Montgomery County
    Texas counties do not charge development impact fees under Local Government Code Chapter 395, and Montgomery County has adopted no drainage impact fee.
    $0.00
Total (Shenandoah): $2,635.14
Sources last checked Official fee schedules:City of Shenandoah Montgomery County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Montgomery County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Shenandoah: Commercial Impact Fees

Commercial development in Shenandoah pays $1.55 per square foot in impact fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $77,748.50. The calculator below adjusts to your exact square footage.

Wastewater Impact Fee (City of Shenandoah, Commercial) — 0.281 SU per 1,000 sf × $4,692.49/SU and Water Impact Fee (City of Shenandoah, Commercial) — 0.281 SU per 1,000 sf × $841.21/SU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Commercial Water and Sewer Tap Charge (City of Shenandoah) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Shenandoah Impact Fee Schedule
Water$0.24/sq ft
  • Water Impact Fee (City of Shenandoah, Commercial) — 0.281 SU per 1,000 sf × $841.21/SU
    City of Shenandoah
    City of Shenandoah water impact fee of $841.21 per service unit, adopted October 22, 2025 (Ordinance O-25-022). The city's 2025 study sets nonresidential service units by floor area and use: retail is 0.000281 units per sq ft, so $236.38 per 1,000 sq ft. Restaurants, grocery stores and other listed uses have their own rates. The fee is assessed when the final plat is recorded, or at building permit or utility connection where no plat is required.
    $0.24/sq ftRequires confirmation
  • Commercial Water and Sewer Tap Charge (City of Shenandoah)
    City of Shenandoah
    Commercial taps to the city's water and sewer systems are charged per square foot of the whole tract, plus the cost of the meter, meter box and installation. The rate is kept on file at City Hall rather than in the code.
    Requires confirmation
Sewer$1.32/sq ft
  • Wastewater Impact Fee (City of Shenandoah, Commercial) — 0.281 SU per 1,000 sf × $4,692.49/SU
    City of Shenandoah
    City of Shenandoah wastewater impact fee of $4,692.49 per service unit, adopted October 22, 2025 (Ordinance O-25-022). The city's 2025 study sets nonresidential service units by floor area and use: retail is 0.000281 units per sq ft, so $1,318.59 per 1,000 sq ft. Restaurants, grocery stores and other listed uses have their own rates. The fee is assessed when the final plat is recorded, or at building permit or utility connection where no plat is required.
    $1.32/sq ftRequires confirmation
City$0.00
County$0.00
Total (Shenandoah): $1.55/sq ft (≈ $77,748.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Shenandoah Montgomery County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Montgomery County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Shenandoah: Industrial Impact Fees

Industrial development in Shenandoah pays $1.11 per square foot in impact fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $55,337.00. The calculator below adjusts to your exact square footage.

Water Impact Fee (City of Shenandoah, Industrial) — 0.200 SU per 1,000 sf × $841.21/SU and Wastewater Impact Fee (City of Shenandoah, Industrial) — 0.200 SU per 1,000 sf × $4,692.49/SU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Commercial Water and Sewer Tap Charge (City of Shenandoah) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Shenandoah Impact Fee Schedule
Water$0.17/sq ft
  • Water Impact Fee (City of Shenandoah, Industrial) — 0.200 SU per 1,000 sf × $841.21/SU
    City of Shenandoah
    City of Shenandoah water impact fee of $841.21 per service unit, adopted October 22, 2025 (Ordinance O-25-022). The city's 2025 study sets nonresidential service units by floor area and use: manufacturing is 0.0002 units per sq ft, so $168.24 per 1,000 sq ft. Warehouse space is lower (0.000121 units per sq ft). The fee is assessed when the final plat is recorded, or at building permit or utility connection where no plat is required.
    $0.17/sq ftRequires confirmation
  • Commercial Water and Sewer Tap Charge (City of Shenandoah)
    City of Shenandoah
    Commercial taps to the city's water and sewer systems are charged per square foot of the whole tract, plus the cost of the meter, meter box and installation. The rate is kept on file at City Hall rather than in the code.
    Requires confirmation
Sewer$0.94/sq ft
  • Wastewater Impact Fee (City of Shenandoah, Industrial) — 0.200 SU per 1,000 sf × $4,692.49/SU
    City of Shenandoah
    City of Shenandoah wastewater impact fee of $4,692.49 per service unit, adopted October 22, 2025 (Ordinance O-25-022). The city's 2025 study sets nonresidential service units by floor area and use: manufacturing is 0.0002 units per sq ft, so $938.50 per 1,000 sq ft. Warehouse space is lower (0.000121 units per sq ft). The fee is assessed when the final plat is recorded, or at building permit or utility connection where no plat is required.
    $0.94/sq ftRequires confirmation
City$0.00
County$0.00
Total (Shenandoah): $1.11/sq ft (≈ $55,337.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Shenandoah Montgomery County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Montgomery County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Shenandoah: Office Impact Fees

Office development in Shenandoah pays $1.31 per square foot in impact fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to at least $32,787.25. The calculator below adjusts to your exact square footage.

Wastewater Impact Fee (City of Shenandoah, Office) — 0.237 SU per 1,000 sf × $4,692.49/SU and Water Impact Fee (City of Shenandoah, Office) — 0.237 SU per 1,000 sf × $841.21/SU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Commercial Water and Sewer Tap Charge (City of Shenandoah) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Shenandoah Impact Fee Schedule
Water$0.20/sq ft
  • Water Impact Fee (City of Shenandoah, Office) — 0.237 SU per 1,000 sf × $841.21/SU
    City of Shenandoah
    City of Shenandoah water impact fee of $841.21 per service unit, adopted October 22, 2025 (Ordinance O-25-022). The city's 2025 study sets nonresidential service units by floor area and use: office is 0.000237 units per sq ft, so $199.37 per 1,000 sq ft. The fee is assessed when the final plat is recorded, or at building permit or utility connection where no plat is required.
    $0.20/sq ftRequires confirmation
  • Commercial Water and Sewer Tap Charge (City of Shenandoah)
    City of Shenandoah
    Commercial taps to the city's water and sewer systems are charged per square foot of the whole tract, plus the cost of the meter, meter box and installation. The rate is kept on file at City Hall rather than in the code.
    Requires confirmation
Sewer$1.11/sq ft
  • Wastewater Impact Fee (City of Shenandoah, Office) — 0.237 SU per 1,000 sf × $4,692.49/SU
    City of Shenandoah
    City of Shenandoah wastewater impact fee of $4,692.49 per service unit, adopted October 22, 2025 (Ordinance O-25-022). The city's 2025 study sets nonresidential service units by floor area and use: office is 0.000237 units per sq ft, so $1,112.12 per 1,000 sq ft. The fee is assessed when the final plat is recorded, or at building permit or utility connection where no plat is required.
    $1.11/sq ftRequires confirmation
City$0.00
County$0.00
Total (Shenandoah): $1.31/sq ft (≈ $32,787.25 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Shenandoah Montgomery County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Montgomery County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Shenandoah Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Shenandoah Impact Fee FAQs

What are the total impact fees for a single-family home in Shenandoah, Texas?

A new single-family home in Shenandoah pays at least $5,533.70 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Shenandoah?

Commercial development in Shenandoah pays $1.55 per square foot in impact fees, at least $77,748.50 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Shenandoah charge its own impact fees?

Yes. Shenandoah levies its own municipal impact or utility fees. Montgomery County does not currently add county-level impact fees inside Shenandoah. The schedule on this page shows every fee that applies to development in Shenandoah.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Montgomery County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.