Splendora Impact Fees by Project Type
Splendora: Single-Family Impact Fees
A new single-family home in Splendora pays $2,700.00 per unit in impact fees (rates sourced October 20, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (City of Splendora) — 5/8" short tap ($1,900.00) and Sewer Tap Fee (City of Splendora) ($800.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Splendora Impact Fee Schedule
- Water Tap Fee (City of Splendora) — 5/8" short tap$1,900.00City of SplendoraThe City of Splendora supplies water. Residential new-service tap fees inside the city (rate sheet updated January 27, 2025) run by meter size and tap length: 5/8 inch $1,900 short or $2,100 long, 1 inch $2,200 or $2,400, 2 inch $3,800 or $4,000, plus $22 per foot for any line extension. Outside-city taps cost $200 more. The city has no water impact fee.
- Sewer Tap Fee (City of Splendora)$800.00City of SplendoraThe City of Splendora operates the sewer system. Residential new sewer service is a one-time $800 fee (rate sheet updated January 27, 2025); where the connection needs a road bore, the charge is $1,000 plus cost. The city offers no sewer service outside its limits. The city has no wastewater impact fee.
- City Impact Fee (City of Splendora)$0.00City of SplendoraNo municipal impact fee. Splendora has adopted no Chapter 395 impact fee and no parkland dedication fee.
- County Impact Fee (Montgomery County)$0.00Montgomery CountyTexas counties do not charge development impact fees under Local Government Code Chapter 395, and Montgomery County has adopted no drainage impact fee.
Where in Montgomery County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Splendora: Multifamily Impact Fees
A new multifamily unit in Splendora pays $2,700.00 per unit in impact fees (rates sourced October 20, 2026). Every line item is levied at the municipal or utility level.
Water Tap Fee (City of Splendora, MF) — 5/8" short tap and Sewer Tap Fee (City of Splendora, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Splendora Impact Fee Schedule
- Water Tap Fee (City of Splendora, MF) — 5/8" short tap$1,900.00Requires confirmationCity of SplendoraThe City of Splendora supplies water. The rate sheet (updated January 27, 2025) has no multifamily rate; this shows the residential tap fee per unit, assuming one tap per unit. A building served by one tap pays once, and commercial tap rates ($2,300 and up) may apply instead. The city has no water impact fee.
- Sewer Tap Fee (City of Splendora, MF)$800.00Requires confirmationCity of SplendoraThe City of Splendora operates the sewer system. The rate sheet (updated January 27, 2025) has no multifamily rate; this shows the $800 residential new-service fee per unit. A building on one connection pays once, and the commercial sewer tap ($1,500 for a 4 inch tap, $2,500 for a 6 inch tap) may apply instead.
- City Impact Fee (City of Splendora, MF)$0.00City of SplendoraNo municipal impact fee. Splendora has adopted no Chapter 395 impact fee and no parkland dedication fee.
- County Impact Fee (Montgomery County, MF)$0.00Montgomery CountyTexas counties do not charge development impact fees under Local Government Code Chapter 395, and Montgomery County has adopted no drainage impact fee.
Where in Montgomery County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Splendora: Commercial Impact Fees
Commercial development in Splendora pays no per-square-foot impact fees, but owes $4,100.00 in one-time water and sewer connection fees (rates sourced October 20, 2026).
For a 50,000 sq ft building, that comes to about $4,100.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Splendora) — 1" short tap ($2,600.00 one-time) and Sewer Tap Fee (City of Splendora) — 4" tap ($1,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Splendora Impact Fee Schedule
- Water Tap Fee (City of Splendora) — 1" short tap$2,600.00 one-timeCity of SplendoraThe City of Splendora supplies water. Commercial new-service tap fees inside the city (rate sheet updated January 27, 2025) run by meter size and tap length: 5/8 inch $2,300 short or $2,500 long, 1 inch $2,600 or $2,800, 2 inch $4,000 or $4,200, 4 inch $6,500, 6 inch $8,100, plus $22 per foot for any line extension. Outside-city taps cost $200 more up to 2 inches. The city has no water impact fee.
- Sewer Tap Fee (City of Splendora) — 4" tap$1,500.00 one-timeCity of SplendoraThe City of Splendora operates the sewer system. Commercial new sewer service inside the city (rate sheet updated January 27, 2025) is $1,500 for a 4 inch tap or $2,500 for a 6 inch tap; where a road bore is needed the charge is $1,700 or $2,700 plus cost. The city offers no sewer service outside its limits and has no wastewater impact fee.
- City Impact Fee (City of Splendora, Commercial)$0.00City of SplendoraNo municipal impact fee. Splendora has adopted no Chapter 395 roadway, drainage, water or wastewater impact fee.
- County Impact Fee (Montgomery County, Commercial)$0.00Montgomery CountyTexas counties do not charge development impact fees under Local Government Code Chapter 395, and Montgomery County has adopted no drainage impact fee.
Where in Montgomery County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Splendora: Industrial Impact Fees
Industrial development in Splendora pays no per-square-foot impact fees, but owes $4,100.00 in one-time water and sewer connection fees (rates sourced October 20, 2026).
For a 50,000 sq ft building, that comes to about $4,100.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Splendora) — 1" short tap ($2,600.00 one-time) and Sewer Tap Fee (City of Splendora) — 4" tap ($1,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Splendora Impact Fee Schedule
- Water Tap Fee (City of Splendora) — 1" short tap$2,600.00 one-timeCity of SplendoraThe City of Splendora supplies water. Commercial new-service tap fees inside the city (rate sheet updated January 27, 2025) run by meter size and tap length: 5/8 inch $2,300 short or $2,500 long, 1 inch $2,600 or $2,800, 2 inch $4,000 or $4,200, 4 inch $6,500, 6 inch $8,100, plus $22 per foot for any line extension. Outside-city taps cost $200 more up to 2 inches. The city has no water impact fee.
- Sewer Tap Fee (City of Splendora) — 4" tap$1,500.00 one-timeCity of SplendoraThe City of Splendora operates the sewer system. Commercial new sewer service inside the city (rate sheet updated January 27, 2025) is $1,500 for a 4 inch tap or $2,500 for a 6 inch tap; where a road bore is needed the charge is $1,700 or $2,700 plus cost. The city offers no sewer service outside its limits and has no wastewater impact fee.
- City Impact Fee (City of Splendora, Industrial)$0.00City of SplendoraNo municipal impact fee. Splendora has adopted no Chapter 395 roadway, drainage, water or wastewater impact fee.
- County Impact Fee (Montgomery County, Industrial)$0.00Montgomery CountyTexas counties do not charge development impact fees under Local Government Code Chapter 395, and Montgomery County has adopted no drainage impact fee.
Where in Montgomery County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Splendora: Office Impact Fees
Office development in Splendora pays no per-square-foot impact fees, but owes $4,100.00 in one-time water and sewer connection fees (rates sourced October 20, 2026).
For a 25,000 sq ft building, that comes to about $4,100.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tap Fee (City of Splendora) — 1" short tap ($2,600.00 one-time) and Sewer Tap Fee (City of Splendora) — 4" tap ($1,500.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Splendora Impact Fee Schedule
- Water Tap Fee (City of Splendora) — 1" short tap$2,600.00 one-timeCity of SplendoraThe City of Splendora supplies water. Commercial new-service tap fees inside the city (rate sheet updated January 27, 2025) run by meter size and tap length: 5/8 inch $2,300 short or $2,500 long, 1 inch $2,600 or $2,800, 2 inch $4,000 or $4,200, 4 inch $6,500, 6 inch $8,100, plus $22 per foot for any line extension. Outside-city taps cost $200 more up to 2 inches. The city has no water impact fee.
- Sewer Tap Fee (City of Splendora) — 4" tap$1,500.00 one-timeCity of SplendoraThe City of Splendora operates the sewer system. Commercial new sewer service inside the city (rate sheet updated January 27, 2025) is $1,500 for a 4 inch tap or $2,500 for a 6 inch tap; where a road bore is needed the charge is $1,700 or $2,700 plus cost. The city offers no sewer service outside its limits and has no wastewater impact fee.
- City Impact Fee (City of Splendora, Office)$0.00City of SplendoraNo municipal impact fee. Splendora has adopted no Chapter 395 roadway, drainage, water or wastewater impact fee.
- County Impact Fee (Montgomery County, Office)$0.00Montgomery CountyTexas counties do not charge development impact fees under Local Government Code Chapter 395, and Montgomery County has adopted no drainage impact fee.
Where in Montgomery County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Splendora Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Splendora Impact Fee FAQs
What are the total impact fees for a single-family home in Splendora, Texas?
A new single-family home in Splendora pays $2,700.00 per unit in combined impact fees (rates sourced October 20, 2026).
How much are commercial impact fees in Splendora?
Commercial development in Splendora pays no per-square-foot impact fees, but owes $4,100.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Splendora charge its own impact fees?
Yes. Splendora levies its own municipal impact or utility fees. Montgomery County does not currently add county-level impact fees inside Splendora. The schedule on this page shows every fee that applies to development in Splendora.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Montgomery County impact fees page.