Hawthorne, Florida Impact Fees

Hawthorne applies its own fee schedule: municipal fees plus the Alachua County-levied fees that apply inside city limits. There are currently no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The full breakdown is below.

Hawthorne impact fees by project type

Hawthorne: Single-Family Impact Fees

Hawthorne has no published impact fee amounts for a new single-family home (rates sourced July 12, 2026). The schedule below documents the status of each fee.

Sewer Connection Fee (Hawthorne) and Water Connection Fee (Hawthorne) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Hawthorne)
    City of Hawthorne
    ⚠️ UNCONFIRMED. Re-checked 7/11/2026: cityofhawthorne.net Utility Billing / Public Works pages publish deposits ($300 residential / $400 commercial) and monthly rates only — no connection/tap/capacity fee schedule posted; nothing in Municode. Renamed from a combined 'Water/Sewer' label (a separate Sewer record exists). Call Hawthorne Utility Billing, 352-481-2432 ext. 707.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Hawthorne)
    City of Hawthorne
    ⚠️ VERIFY. Searched Municode and city website — no sewer connection fee found online. Call Hawthorne City Hall at 352-481-2432 to confirm if city sewer exists and connection fee amount.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fees — None found (researched June 2026)
    City of Hawthorne
    Researched June 4, 2026. No city impact fees found online. Small city (~1,400 pop). Call Utility Billing 352-481-2432 ext. 707 to verify.
    $0.00
County$0.00
  • County Overlay Fees — None applying (researched June 2026)
    Alachua County
    Researched June 4, 2026. Alachua County capacity fees (Mobility/Fire/Park) do not apply within incorporated municipalities.
    $0.00
Total (Hawthorne): $0.00
Sources last checked July 12, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Alachua County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Hawthorne: Multifamily Impact Fees

Hawthorne has no published impact fee amounts for a new multifamily unit (rates sourced July 12, 2026). The schedule below documents the status of each fee.

Water Connection Fee (Hawthorne, MF) and Sewer Connection Fee (Hawthorne, MF) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Hawthorne, MF)
    City of Hawthorne
    ⚠️ UNCONFIRMED. Re-checked 7/11/2026: cityofhawthorne.net posts deposits and monthly rates only — no connection/capacity fee schedule and no per-unit MF basis. Renamed from a combined 'Water/Sewer' label (a separate Sewer record exists). Call 352-481-2432 ext. 707.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Sewer Connection Fee (Hawthorne, MF)
    City of Hawthorne
    ⚠️ VERIFY. No sewer connection fee found online. Call Hawthorne City Hall at 352-481-2432.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fees — None found (researched June 2026)
    City of Hawthorne
    Researched June 4, 2026. No city impact fees found online. Call 352-481-2432 ext. 707.
    $0.00
County$0.00
  • County Overlay Fees — None applying (researched June 2026)
    Alachua County
    Researched June 4, 2026. Alachua County capacity fees do not apply within incorporated municipalities.
    $0.00
Total (Hawthorne): $0.00
Sources last checked July 12, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Alachua County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Hawthorne: Commercial Impact Fees

Commercial development in Hawthorne pays no per-square-foot impact fees, but owes $8,500.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $8,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $2,100/ERU ($5,250.00 one-time) and Water System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $1,300/ERU ($3,250.00 one-time).

Official fee schedule

View the full fee schedule
Water$3,250.00 one-time
  • Water System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $1,300/ERU
    City of Hawthorne
    AUDIT 2026-07-12 — RESOLVED, was $0 Unconfirmed. Hawthorne DOES levy a water impact fee: Code Ch. 27 Art. II, Sec. 27-71, adopted by Ord. No. 2006-04 (1-9-2006), code current through 5/13/2026. Charged per ERU by meter size, with NO nonresidential exemption — applies to all development. Base rate $1,300.00 per ERU. Meter schedule: 5/8" = 1.0 ERU $1,300; 3/4" = 1.5 ERU $1,950; 1" = 2.5 ERU $3,250 (canonical default, stored here); 1.5" = 5.0 ERU $6,500; 2" = 8.0 ERU $10,400; 3" = 16.0 $20,800; 4" = 25.0 $32,500; 6" = 50.0 $65,000; 8" = 80.0 $104,000; over 8" negotiated. SEPARATE from the physical connection/tap charge in Sec. 58-37 ('not less than $750.00' or estimated city cost; Ord. 90-3, Ord. 2011-14) — that is an installation cost, not a capacity charge, and is not stored. Commercial utility deposit $400 (refundable, not a fee). Prior pass searched only the city website and missed the Ch. 27 impact-fee chapter in Municode.
    $3,250.00 one-time
Sewer$5,250.00 one-time
  • Sewer System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $2,100/ERU
    City of Hawthorne
    AUDIT 2026-07-12 — RESOLVED, was $0 Unconfirmed. Hawthorne DOES levy a sewer impact fee: Code Ch. 27 Art. II, Sec. 27-51, adopted by Ord. No. 2006-04 (1-9-2006), code current through 5/13/2026. Charged per ERU by meter size, with NO nonresidential exemption. Base rate $2,100.00 per ERU. Meter schedule: 5/8" = 1.0 ERU $2,100; 3/4" = 1.5 ERU $3,150; 1" = 2.5 ERU $5,250 (canonical default, stored here); 1.5" = 5.0 ERU $10,500; 2" = 8.0 ERU $16,800; 3" = 16.0 $33,600; 4" = 25.0 $52,500; 6" = 50.0 $105,000; 8" = 80.0 $168,000; over 8" negotiated. SEPARATE from the physical connection/tap charge in Sec. 58-74 ('not less than $1,200.00' or estimated city cost; Ord. 2004-04, Ord. 2011-14) — that is an installation cost, not a capacity charge, and is not stored. Prior pass searched only the city website and missed the Ch. 27 impact-fee chapter in Municode.
    $5,250.00 one-time
City$0.00
  • City Non-Utility Impact Fees (City of Hawthorne, Commercial) — None
    City of Hawthorne
    CONFIRMED $0 — mandatory City placeholder. AUDIT 2026-07-12: Hawthorne DOES have an impact-fee chapter (Code Ch. 27 Art. II, Ord. No. 2006-04) — but it levies WATER and SEWER impact fees ONLY. There is no transportation/roads, parks, fire or police impact fee. The water ($1,300/ERU) and sewer ($2,100/ERU) impact fees are recorded in the Water/Sewer table. This City-type record is therefore a confirmed $0 for non-utility municipal impact fees. Prior Unconfirmed flag RESOLVED.
    $0.00
County$0.00
Total (Hawthorne): $8,500.00 one-time (≈ $8,500.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule

Where in Alachua County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Hawthorne: Industrial Impact Fees

Industrial development in Hawthorne pays no per-square-foot impact fees, but owes $8,500.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $8,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $2,100/ERU ($5,250.00 one-time) and Water System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $1,300/ERU ($3,250.00 one-time).

Official fee schedule

View the full fee schedule
Water$3,250.00 one-time
  • Water System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $1,300/ERU
    City of Hawthorne
    AUDIT 2026-07-12 — RESOLVED, was $0 Unconfirmed. Hawthorne DOES levy a water impact fee: Code Ch. 27 Art. II, Sec. 27-71, adopted by Ord. No. 2006-04 (1-9-2006), code current through 5/13/2026. Charged per ERU by meter size, with NO nonresidential exemption — applies to all development. Base rate $1,300.00 per ERU. Meter schedule: 5/8" = 1.0 ERU $1,300; 3/4" = 1.5 ERU $1,950; 1" = 2.5 ERU $3,250 (canonical default, stored here); 1.5" = 5.0 ERU $6,500; 2" = 8.0 ERU $10,400; 3" = 16.0 $20,800; 4" = 25.0 $32,500; 6" = 50.0 $65,000; 8" = 80.0 $104,000; over 8" negotiated. SEPARATE from the physical connection/tap charge in Sec. 58-37 ('not less than $750.00' or estimated city cost; Ord. 90-3, Ord. 2011-14) — that is an installation cost, not a capacity charge, and is not stored. Commercial utility deposit $400 (refundable, not a fee). Prior pass searched only the city website and missed the Ch. 27 impact-fee chapter in Municode.
    $3,250.00 one-time
Sewer$5,250.00 one-time
  • Sewer System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $2,100/ERU
    City of Hawthorne
    AUDIT 2026-07-12 — RESOLVED, was $0 Unconfirmed. Hawthorne DOES levy a sewer impact fee: Code Ch. 27 Art. II, Sec. 27-51, adopted by Ord. No. 2006-04 (1-9-2006), code current through 5/13/2026. Charged per ERU by meter size, with NO nonresidential exemption. Base rate $2,100.00 per ERU. Meter schedule: 5/8" = 1.0 ERU $2,100; 3/4" = 1.5 ERU $3,150; 1" = 2.5 ERU $5,250 (canonical default, stored here); 1.5" = 5.0 ERU $10,500; 2" = 8.0 ERU $16,800; 3" = 16.0 $33,600; 4" = 25.0 $52,500; 6" = 50.0 $105,000; 8" = 80.0 $168,000; over 8" negotiated. SEPARATE from the physical connection/tap charge in Sec. 58-74 ('not less than $1,200.00' or estimated city cost; Ord. 2004-04, Ord. 2011-14) — that is an installation cost, not a capacity charge, and is not stored. Prior pass searched only the city website and missed the Ch. 27 impact-fee chapter in Municode.
    $5,250.00 one-time
City$0.00
  • City Non-Utility Impact Fees (City of Hawthorne, Industrial) — None
    City of Hawthorne
    CONFIRMED $0 — mandatory City placeholder. AUDIT 2026-07-12: Hawthorne DOES have an impact-fee chapter (Code Ch. 27 Art. II, Ord. No. 2006-04) — but it levies WATER and SEWER impact fees ONLY. There is no transportation/roads, parks, fire or police impact fee. The water ($1,300/ERU) and sewer ($2,100/ERU) impact fees are recorded in the Water/Sewer table. This City-type record is therefore a confirmed $0 for non-utility municipal impact fees. Prior Unconfirmed flag RESOLVED.
    $0.00
County$0.00
Total (Hawthorne): $8,500.00 one-time (≈ $8,500.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule

Where in Alachua County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Hawthorne: Office Impact Fees

Office development in Hawthorne pays no per-square-foot impact fees, but owes $8,500.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $8,500.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $2,100/ERU ($5,250.00 one-time) and Water System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $1,300/ERU ($3,250.00 one-time).

Official fee schedule

View the full fee schedule
Water$3,250.00 one-time
  • Water System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $1,300/ERU
    City of Hawthorne
    AUDIT 2026-07-12 — RESOLVED, was $0 Unconfirmed. Hawthorne DOES levy a water impact fee: Code Ch. 27 Art. II, Sec. 27-71, adopted by Ord. No. 2006-04 (1-9-2006), code current through 5/13/2026. Charged per ERU by meter size, with NO nonresidential exemption — applies to all development. Base rate $1,300.00 per ERU. Meter schedule: 5/8" = 1.0 ERU $1,300; 3/4" = 1.5 ERU $1,950; 1" = 2.5 ERU $3,250 (canonical default, stored here); 1.5" = 5.0 ERU $6,500; 2" = 8.0 ERU $10,400; 3" = 16.0 $20,800; 4" = 25.0 $32,500; 6" = 50.0 $65,000; 8" = 80.0 $104,000; over 8" negotiated. SEPARATE from the physical connection/tap charge in Sec. 58-37 ('not less than $750.00' or estimated city cost; Ord. 90-3, Ord. 2011-14) — that is an installation cost, not a capacity charge, and is not stored. Commercial utility deposit $400 (refundable, not a fee). Prior pass searched only the city website and missed the Ch. 27 impact-fee chapter in Municode.
    $3,250.00 one-time
Sewer$5,250.00 one-time
  • Sewer System Impact Fee (City of Hawthorne) — 1" meter, 2.5 ERU × $2,100/ERU
    City of Hawthorne
    AUDIT 2026-07-12 — RESOLVED, was $0 Unconfirmed. Hawthorne DOES levy a sewer impact fee: Code Ch. 27 Art. II, Sec. 27-51, adopted by Ord. No. 2006-04 (1-9-2006), code current through 5/13/2026. Charged per ERU by meter size, with NO nonresidential exemption. Base rate $2,100.00 per ERU. Meter schedule: 5/8" = 1.0 ERU $2,100; 3/4" = 1.5 ERU $3,150; 1" = 2.5 ERU $5,250 (canonical default, stored here); 1.5" = 5.0 ERU $10,500; 2" = 8.0 ERU $16,800; 3" = 16.0 $33,600; 4" = 25.0 $52,500; 6" = 50.0 $105,000; 8" = 80.0 $168,000; over 8" negotiated. SEPARATE from the physical connection/tap charge in Sec. 58-74 ('not less than $1,200.00' or estimated city cost; Ord. 2004-04, Ord. 2011-14) — that is an installation cost, not a capacity charge, and is not stored. Prior pass searched only the city website and missed the Ch. 27 impact-fee chapter in Municode.
    $5,250.00 one-time
City$0.00
  • City Non-Utility Impact Fees (City of Hawthorne, Office) — None
    City of Hawthorne
    CONFIRMED $0 — mandatory City placeholder. AUDIT 2026-07-12: Hawthorne DOES have an impact-fee chapter (Code Ch. 27 Art. II, Ord. No. 2006-04) — but it levies WATER and SEWER impact fees ONLY. There is no transportation/roads, parks, fire or police impact fee. The water ($1,300/ERU) and sewer ($2,100/ERU) impact fees are recorded in the Water/Sewer table. This City-type record is therefore a confirmed $0 for non-utility municipal impact fees. Prior Unconfirmed flag RESOLVED.
    $0.00
County$0.00
Total (Hawthorne): $8,500.00 one-time (≈ $8,500.00 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedule

Where in Alachua County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Estimate your project in Hawthorne

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

How much are commercial impact fees in Hawthorne?

Commercial development in Hawthorne pays no per-square-foot impact fees, but owes $8,500.00 in one-time water and sewer connection fees.

Does Hawthorne charge its own impact fees?

Yes. Hawthorne levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Hawthorne, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.