Waldo impact fees by project type
Waldo: Single-Family Impact Fees
Waldo has no published impact fee amounts for a new single-family home (rates sourced July 11, 2026). The schedule below documents the status of each fee.
Water Connection Fee (Waldo) and Sewer Connection Fee (Waldo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Waldo impact fee schedule
- Water Connection Fee (Waldo)Requires confirmationCity of Waldo
- Sewer Connection Fee (Waldo)Requires confirmationCity of Waldo
- City Impact Fees — None found (researched June 2026)$0.00City of Waldo
- County Overlay Fees — None applying (researched June 2026)$0.00Alachua County
Where in Alachua County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Waldo: Multifamily Impact Fees
Waldo has no published impact fee amounts for a new multifamily unit (rates sourced July 11, 2026). The schedule below documents the status of each fee.
Sewer Connection Fee (Waldo, MF) and Water Connection Fee (Waldo, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Waldo impact fee schedule
- Water Connection Fee (Waldo, MF)Requires confirmationCity of Waldo
- Sewer Connection Fee (Waldo, MF)Requires confirmationCity of Waldo
- City Impact Fees — None found (researched June 2026)$0.00City of Waldo
- County Overlay Fees — None applying (researched June 2026)$0.00Alachua County
Where in Alachua County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Waldo: Commercial Impact Fees
Commercial development in Waldo pays no per-square-foot impact fees (rates sourced July 11, 2026).
Water Connection Fee (City of Waldo) and Sewer Connection Fee (City of Waldo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Waldo impact fee schedule
- Water Connection Fee (City of Waldo)Requires confirmationCity of WaldoThe City of Waldo charges a water capacity fee under Code Sec. 7-3, computed on equivalent residential units; for nonresidential users 1 ERU equals 300 gallons per day. A 25% surcharge applies to service outside the city limits. The dollar amount per ERU is set by City Council resolution and is not published, so no rate can be shown.
- Sewer Connection Fee (City of Waldo)Requires confirmationCity of WaldoThe City of Waldo charges a sewer capacity fee under Code Sec. 7-5, computed on equivalent residential units; for nonresidential users 1 ERU equals 300 gallons per day. A 25% surcharge applies to service outside the city limits. The dollar amount per ERU is set by City Council resolution and is not published, so no rate can be shown.
- City Impact Fees (City of Waldo, Commercial) — None$0.00City of WaldoThe City of Waldo has not adopted any impact fees; its land development code refers to impact fees only as something the city may adopt in the future. The city does charge water and sewer capacity fees, which are listed separately.
- County Overlay Fees (Alachua County, Commercial) — None applying inside Waldo$0.00Alachua CountyNo Alachua County impact fees apply here. The county's mobility, fire protection and park system capacity fees are charged only on development in the unincorporated county, not within incorporated municipalities.
Where in Alachua County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Waldo: Industrial Impact Fees
Industrial development in Waldo pays no per-square-foot impact fees (rates sourced July 11, 2026).
Water Connection Fee (City of Waldo) and Sewer Connection Fee (City of Waldo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Waldo impact fee schedule
- Water Connection Fee (City of Waldo)Requires confirmationCity of WaldoThe City of Waldo charges a water capacity fee under Code Sec. 7-3, computed on equivalent residential units; for nonresidential users 1 ERU equals 300 gallons per day. A 25% surcharge applies to service outside the city limits. The dollar amount per ERU is set by City Council resolution and is not published, so no rate can be shown.
- Sewer Connection Fee (City of Waldo)Requires confirmationCity of WaldoThe City of Waldo charges a sewer capacity fee under Code Sec. 7-5, computed on equivalent residential units; for nonresidential users 1 ERU equals 300 gallons per day. A 25% surcharge applies to service outside the city limits. The dollar amount per ERU is set by City Council resolution and is not published, so no rate can be shown.
- City Impact Fees (City of Waldo, Industrial) — None$0.00City of WaldoThe City of Waldo has not adopted any impact fees; its land development code refers to impact fees only as something the city may adopt in the future. The city does charge water and sewer capacity fees, which are listed separately.
- County Overlay Fees (Alachua County, Industrial) — None applying inside Waldo$0.00Alachua CountyNo Alachua County impact fees apply here. The county's mobility, fire protection and park system capacity fees are charged only on development in the unincorporated county, not within incorporated municipalities.
Where in Alachua County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Waldo: Office Impact Fees
Office development in Waldo pays no per-square-foot impact fees (rates sourced July 11, 2026).
Water Connection Fee (City of Waldo) and Sewer Connection Fee (City of Waldo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Waldo impact fee schedule
- Water Connection Fee (City of Waldo)Requires confirmationCity of WaldoThe City of Waldo charges a water capacity fee under Code Sec. 7-3, computed on equivalent residential units; for nonresidential users 1 ERU equals 300 gallons per day. A 25% surcharge applies to service outside the city limits. The dollar amount per ERU is set by City Council resolution and is not published, so no rate can be shown.
- Sewer Connection Fee (City of Waldo)Requires confirmationCity of WaldoThe City of Waldo charges a sewer capacity fee under Code Sec. 7-5, computed on equivalent residential units; for nonresidential users 1 ERU equals 300 gallons per day. A 25% surcharge applies to service outside the city limits. The dollar amount per ERU is set by City Council resolution and is not published, so no rate can be shown.
- City Impact Fees (City of Waldo, Office) — None$0.00City of WaldoThe City of Waldo has not adopted any impact fees; its land development code refers to impact fees only as something the city may adopt in the future. The city does charge water and sewer capacity fees, which are listed separately.
- County Overlay Fees (Alachua County, Office) — None applying inside Waldo$0.00Alachua CountyNo Alachua County impact fees apply here. The county's mobility, fire protection and park system capacity fees are charged only on development in the unincorporated county, not within incorporated municipalities.
Where in Alachua County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Waldo impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Waldo impact fee FAQs
How much are commercial impact fees in Waldo?
Waldo does not currently levy impact fees on commercial development.
Does Waldo charge its own impact fees?
Yes. Waldo levies its own municipal impact or utility fees. Alachua County does not currently add county-level impact fees inside Waldo. The schedule on this page shows every fee that applies to development in Waldo.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Alachua County impact fees page.