Waldo impact fees by project type
Waldo: Single-Family Impact Fees
Waldo has no published impact fee amounts for a new single-family home (rates sourced July 11, 2026). The schedule below documents the status of each fee.
Water Connection Fee (Waldo) and Sewer Connection Fee (Waldo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Waldo)Requires confirmationCity of WaldoThe City of Waldo operates a water/sewer utility, but no connection or capacity fee schedule is published in its code (waldo.municipalcodeonline.com) or on the city website. A separate sewer record is tracked.
- Sewer Connection Fee (Waldo)Requires confirmationCity of WaldoNo sewer connection fee for the City of Waldo is published in Municode or on the city website. A separate water record is tracked.
- City Impact Fees — None found (researched June 2026)$0.00City of WaldoNo city impact fees are found for the City of Waldo (pop. ~900); its code is at waldo.municipalcodeonline.com. Water and sewer utility fees are tracked separately.
- County Overlay Fees — None applying (researched June 2026)$0.00Alachua CountyResearched June 4, 2026. Alachua County capacity fees do not apply within incorporated municipalities.
Where in Alachua County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Waldo: Multifamily Impact Fees
Waldo has no published impact fee amounts for a new multifamily unit (rates sourced July 11, 2026). The schedule below documents the status of each fee.
Sewer Connection Fee (Waldo, MF) and Water Connection Fee (Waldo, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (Waldo, MF)Requires confirmationCity of WaldoThe City of Waldo operates a water/sewer utility, but no connection or capacity fee schedule is published online and no per-unit MF basis is established. A separate sewer record is tracked.
- Sewer Connection Fee (Waldo, MF)Requires confirmationCity of WaldoNo sewer connection fee for the City of Waldo is published online. No per-unit MF basis is established.
- City Impact Fees — None found (researched June 2026)$0.00City of WaldoNo city impact fees are found for the City of Waldo. Water and sewer utility fees are tracked separately.
- County Overlay Fees — None applying (researched June 2026)$0.00Alachua CountyResearched June 4, 2026. Alachua County capacity fees do not apply within incorporated municipalities.
Where in Alachua County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Waldo: Commercial Impact Fees
Commercial development in Waldo pays no per-square-foot impact fees (rates sourced July 11, 2026).
Water Connection Fee (City of Waldo) and Sewer Connection Fee (City of Waldo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (City of Waldo)Requires confirmationCity of Waldo⚠️ UNCONFIRMED — the fee EXISTS but its amount is published nowhere. AUDIT 2026-07-12: Waldo operates a municipal water utility and DOES charge a water capacity fee. Code Sec. 7-3 'Water Capacity Charges' requires each applicant to pay a capacity charge prior to service, computed on ERUs; for NONRESIDENTIAL users 1 ERU = 300 gallons/day (flows per F.A.C. ch. 64E). Sec. 7-9 adds a 25% surcharge outside city limits. The FY2025-26 adopted budget confirms the revenue accounts are live: 343320 Water Tap Fees, 343330 Water Line Charges. HOWEVER Sec. 7-3 sets the dollar amount 'by resolution of the City Council' and Waldo publishes no agendas, minutes or resolutions online (the site directs requests to the City Manager) — so the per-ERU amount is genuinely unobtainable online. PHONE CALL REQUIRED: Kim Worley, City Manager / Public Records Custodian, kim@waldo-fl.com, 352-468-1001 — ask for the current water/sewer capacity fee resolution. (Also Bernard Carter, Public Works Director, 352-258-3110.) Applies to all nonres categories.
- Sewer Connection Fee (City of Waldo)Requires confirmationCity of Waldo⚠️ UNCONFIRMED — the fee EXISTS but its amount is published nowhere. AUDIT 2026-07-12: Waldo operates a municipal sewer utility and DOES charge a sewer capacity fee. Code Sec. 7-5 'Sewer Capacity Charges' requires each applicant to pay a capacity charge prior to service, computed on ERUs; for NONRESIDENTIAL users 1 ERU = 300 gallons/day (flows per F.A.C. ch. 64E). Sec. 7-9 adds a 25% surcharge outside city limits. The FY2025-26 adopted budget confirms the revenue accounts are live: 343520 Sewer Tap Fees, 345530 Sewer Line Charge. HOWEVER Sec. 7-5 sets the dollar amount 'by resolution of the City Council' and Waldo publishes no agendas, minutes or resolutions online (the site directs requests to the City Manager) — so the per-ERU amount is genuinely unobtainable online. PHONE CALL REQUIRED: Kim Worley, City Manager / Public Records Custodian, kim@waldo-fl.com, 352-468-1001 — ask for the current water/sewer capacity fee resolution. (Also Bernard Carter, Public Works Director, 352-258-3110.) Applies to all nonres categories.
- City Impact Fees (City of Waldo, Commercial) — None$0.00City of WaldoCONFIRMED $0 — mandatory City placeholder. AUDIT 2026-07-12: Waldo Land Development Code Sec. 4.03.09 states verbatim: 'If in the future the City adopts one or more impact fees, proportionate fair-share contributions shall be applied as a credit...' — dispositive that NO impact fees have been adopted. No transportation, parks, fire or police impact fee exists. (Waldo does charge water and sewer CAPACITY fees under Code Ch. 7 — utility charges, tracked separately in the Water/Sewer table, where their amounts remain unconfirmed.) Prior Unconfirmed flag RESOLVED for the City impact-fee question.
- County Overlay Fees (Alachua County, Commercial) — None applying inside Waldo$0.00Alachua CountyCONFIRMED $0. Alachua County capacity fees (Mobility Ord. 23-18; Park Ord. 23-19 Sec. 368.02(c); Fire Ord. 23-20 Sec. 362.22(c)) apply in the unincorporated area only.
Where in Alachua County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Waldo: Industrial Impact Fees
Industrial development in Waldo pays no per-square-foot impact fees (rates sourced July 11, 2026).
Water Connection Fee (City of Waldo) and Sewer Connection Fee (City of Waldo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (City of Waldo)Requires confirmationCity of Waldo⚠️ UNCONFIRMED — the fee EXISTS but its amount is published nowhere. AUDIT 2026-07-12: Waldo operates a municipal water utility and DOES charge a water capacity fee. Code Sec. 7-3 'Water Capacity Charges' requires each applicant to pay a capacity charge prior to service, computed on ERUs; for NONRESIDENTIAL users 1 ERU = 300 gallons/day (flows per F.A.C. ch. 64E). Sec. 7-9 adds a 25% surcharge outside city limits. The FY2025-26 adopted budget confirms the revenue accounts are live: 343320 Water Tap Fees, 343330 Water Line Charges. HOWEVER Sec. 7-3 sets the dollar amount 'by resolution of the City Council' and Waldo publishes no agendas, minutes or resolutions online (the site directs requests to the City Manager) — so the per-ERU amount is genuinely unobtainable online. PHONE CALL REQUIRED: Kim Worley, City Manager / Public Records Custodian, kim@waldo-fl.com, 352-468-1001 — ask for the current water/sewer capacity fee resolution. (Also Bernard Carter, Public Works Director, 352-258-3110.) Applies to all nonres categories.
- Sewer Connection Fee (City of Waldo)Requires confirmationCity of Waldo⚠️ UNCONFIRMED — the fee EXISTS but its amount is published nowhere. AUDIT 2026-07-12: Waldo operates a municipal sewer utility and DOES charge a sewer capacity fee. Code Sec. 7-5 'Sewer Capacity Charges' requires each applicant to pay a capacity charge prior to service, computed on ERUs; for NONRESIDENTIAL users 1 ERU = 300 gallons/day (flows per F.A.C. ch. 64E). Sec. 7-9 adds a 25% surcharge outside city limits. The FY2025-26 adopted budget confirms the revenue accounts are live: 343520 Sewer Tap Fees, 345530 Sewer Line Charge. HOWEVER Sec. 7-5 sets the dollar amount 'by resolution of the City Council' and Waldo publishes no agendas, minutes or resolutions online (the site directs requests to the City Manager) — so the per-ERU amount is genuinely unobtainable online. PHONE CALL REQUIRED: Kim Worley, City Manager / Public Records Custodian, kim@waldo-fl.com, 352-468-1001 — ask for the current water/sewer capacity fee resolution. (Also Bernard Carter, Public Works Director, 352-258-3110.) Applies to all nonres categories.
- City Impact Fees (City of Waldo, Industrial) — None$0.00City of WaldoCONFIRMED $0 — mandatory City placeholder. AUDIT 2026-07-12: Waldo Land Development Code Sec. 4.03.09 states verbatim: 'If in the future the City adopts one or more impact fees, proportionate fair-share contributions shall be applied as a credit...' — dispositive that NO impact fees have been adopted. No transportation, parks, fire or police impact fee exists. (Waldo's water and sewer capacity fees under Code Ch. 7 are utility charges, tracked separately in the Water/Sewer table.) Prior Unconfirmed flag RESOLVED for the City impact-fee question.
- County Overlay Fees (Alachua County, Industrial) — None applying inside Waldo$0.00Alachua CountyCONFIRMED $0. Alachua County capacity fees apply in the unincorporated area only (Ord. 23-18/23-19/23-20).
Where in Alachua County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Waldo: Office Impact Fees
Office development in Waldo pays no per-square-foot impact fees (rates sourced July 11, 2026).
Water Connection Fee (City of Waldo) and Sewer Connection Fee (City of Waldo) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (City of Waldo)Requires confirmationCity of Waldo⚠️ UNCONFIRMED — the fee EXISTS but its amount is published nowhere. AUDIT 2026-07-12: Waldo operates a municipal water utility and DOES charge a water capacity fee. Code Sec. 7-3 'Water Capacity Charges' requires each applicant to pay a capacity charge prior to service, computed on ERUs; for NONRESIDENTIAL users 1 ERU = 300 gallons/day (flows per F.A.C. ch. 64E). Sec. 7-9 adds a 25% surcharge outside city limits. The FY2025-26 adopted budget confirms the revenue accounts are live: 343320 Water Tap Fees, 343330 Water Line Charges. HOWEVER Sec. 7-3 sets the dollar amount 'by resolution of the City Council' and Waldo publishes no agendas, minutes or resolutions online (the site directs requests to the City Manager) — so the per-ERU amount is genuinely unobtainable online. PHONE CALL REQUIRED: Kim Worley, City Manager / Public Records Custodian, kim@waldo-fl.com, 352-468-1001 — ask for the current water/sewer capacity fee resolution. (Also Bernard Carter, Public Works Director, 352-258-3110.) Applies to all nonres categories.
- Sewer Connection Fee (City of Waldo)Requires confirmationCity of Waldo⚠️ UNCONFIRMED — the fee EXISTS but its amount is published nowhere. AUDIT 2026-07-12: Waldo operates a municipal sewer utility and DOES charge a sewer capacity fee. Code Sec. 7-5 'Sewer Capacity Charges' requires each applicant to pay a capacity charge prior to service, computed on ERUs; for NONRESIDENTIAL users 1 ERU = 300 gallons/day (flows per F.A.C. ch. 64E). Sec. 7-9 adds a 25% surcharge outside city limits. The FY2025-26 adopted budget confirms the revenue accounts are live: 343520 Sewer Tap Fees, 345530 Sewer Line Charge. HOWEVER Sec. 7-5 sets the dollar amount 'by resolution of the City Council' and Waldo publishes no agendas, minutes or resolutions online (the site directs requests to the City Manager) — so the per-ERU amount is genuinely unobtainable online. PHONE CALL REQUIRED: Kim Worley, City Manager / Public Records Custodian, kim@waldo-fl.com, 352-468-1001 — ask for the current water/sewer capacity fee resolution. (Also Bernard Carter, Public Works Director, 352-258-3110.) Applies to all nonres categories.
- City Impact Fees (City of Waldo, Office) — None$0.00City of WaldoCONFIRMED $0 — mandatory City placeholder. AUDIT 2026-07-12: Waldo Land Development Code Sec. 4.03.09 states verbatim: 'If in the future the City adopts one or more impact fees, proportionate fair-share contributions shall be applied as a credit...' — dispositive that NO impact fees have been adopted. No transportation, parks, fire or police impact fee exists. (Waldo's water and sewer capacity fees under Code Ch. 7 are utility charges, tracked separately in the Water/Sewer table.) Prior Unconfirmed flag RESOLVED for the City impact-fee question.
- County Overlay Fees (Alachua County, Office) — None applying inside Waldo$0.00Alachua CountyCONFIRMED $0. Alachua County capacity fees apply in the unincorporated area only (Ord. 23-18/23-19/23-20).
Where in Alachua County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Waldo
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
How much are commercial impact fees in Waldo?
Waldo does not currently levy impact fees on commercial development.
Does Waldo charge its own impact fees?
Yes. Waldo levies its own municipal impact or utility fees. Alachua County does not currently add county-level impact fees inside Waldo. The schedule on this page shows every fee that applies to development in Waldo.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Alachua County impact fees page.