Callaway impact fees by project type
Callaway: Single-Family Impact Fees
A new single-family home in Callaway pays $1,754.00 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (City of Callaway) — 45 FU ÷ 36 × $970/ERC ($1,212.50) and Water Impact Fee (City of Callaway) — 57 FU ÷ 60 × $570/ERC ($541.50).
View the full fee schedule
- Water Impact Fee (City of Callaway) — 57 FU ÷ 60 × $570/ERC$541.50City of CallawayCORRECTED 7/11/2026 (was $1,020.02 from 2004 Ord. 713 — superseded). CONFIRMED from Code §18-215(b)(1), Ord. 974 (8-22-2017): impact fee for one equivalent residential water connection = $570.00. Fee = (sum of fixture values ÷ 60) × $570 (fixture weights §18-216). Canonical SFR (3BR/2BA), Callaway's own values: kitchen sink ½" 3 + dishwasher ½" 4 + washing machine ½" 5 + laundry tray ½" 3 + 2 baths × (water closet tank 3 + lavatory ½" 4 + bathtub 8 = 15) = 30 + 2 hose bibs ½" @6 = 12 → 57 FU. 57 ÷ 60 × $570 = $541.50. +25% surcharge outside city. Exclusive of, and in addition to, any tap-on fee (§18-217).
- Sewer Impact Fee (City of Callaway) — 45 FU ÷ 36 × $970/ERC$1,212.50City of CallawayCORRECTED 7/11/2026 (was $1,735.00 from 2004 Ord. 713 — superseded). CONFIRMED from Code §18-215(b)(1), Ord. 974 (8-22-2017): impact fee for one equivalent residential sewer connection = $970.00. Fee = (sum of sewage-related fixture values ÷ 36) × $970. Canonical SFR (3BR/2BA), hose bibs excluded: kitchen sink 3 + dishwasher 4 + washing machine 5 + laundry tray 3 + 2 baths × 15 = 30 → 45 FU. 45 ÷ 36 × $970 = $1,212.50. +25% surcharge outside city.
- City Impact Fees — None found (researched June 2026)$0.00City of CallawayResearched June 2026. No transportation, parks, fire, or other city impact fees found beyond utility fees above.
- County Overlay Fees — None applying (researched June 2026)$0.00Bay CountyResearched June 2026. Bay County Library/Parks/MSTU-Fire apply unincorporated only. Callaway is incorporated.
Where in Bay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Callaway: Multifamily Impact Fees
A new multifamily unit in Callaway pays $1,530.67 per unit in impact fees (rates sourced July 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Sewer Impact Fee (City of Callaway, MF) — 42 FU ÷ 36 × $970/ERC ($1,131.67) and Water Impact Fee (City of Callaway, MF) — 42 FU ÷ 60 × $570/ERC ($399.00).
View the full fee schedule
- Water Impact Fee (City of Callaway, MF) — 42 FU ÷ 60 × $570/ERC$399.00City of CallawayCORRECTED 7/11/2026 (was $1,020.02 from 2004 Ord. 713 — superseded). CONFIRMED from Code §18-215(b)(1), Ord. 974 (8-22-2017): one equivalent residential water connection = $570.00; fee = (fixture values ÷ 60) × $570. Canonical MF unit (2BR/2BA), Callaway's values (§18-216), no hose bibs / laundry tray: kitchen sink ½" 3 + dishwasher ½" 4 + washing machine ½" 5 + 2 baths × (water closet tank 3 + lavatory ½" 4 + bathtub 8 = 15) = 30 → 42 FU. 42 ÷ 60 × $570 = $399.00. +25% surcharge outside city.
- Sewer Impact Fee (City of Callaway, MF) — 42 FU ÷ 36 × $970/ERC$1,131.67City of CallawayCORRECTED 7/11/2026 (was $1,735.00 from 2004 Ord. 713 — superseded). CONFIRMED from Code §18-215(b)(1), Ord. 974 (8-22-2017): one equivalent residential sewer connection = $970.00; fee = (sewage-related fixture values ÷ 36) × $970. Canonical MF unit (2BR/2BA): 42 FU. 42 ÷ 36 × $970 = $1,131.67. +25% surcharge outside city.
- City/County Fees — None found (researched June 2026)$0.00City of CallawayJune 2026. No city impact fees found. Bay County overlay N/A (incorporated).
- County Overlay Fees (Callaway, MF) — None applying$0.00Bay County Library/Parks/MSTU-Fire apply unincorporated only. Callaway is incorporated — these fees do not apply within city limits.
Where in Bay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Callaway: Commercial Impact Fees
Commercial development in Callaway pays no per-square-foot impact fees, but owes $1,540.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 50,000 sq ft building, that comes to about $1,540.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Callaway) — 1 ERC × $970.00/ERC ($970.00 one-time) and Water Impact Fee (City of Callaway) — 1 ERC × $570.00/ERC ($570.00 one-time).
View the full fee schedule
- Water Impact Fee (City of Callaway) — 1 ERC × $570.00/ERC$570.00 one-timeCity of CallawayCode Sec. 18-215(b)(1), Ord. 974 (8-22-2017): impact fee for ONE equivalent residential water connection = $570.00. FIXTURE-UNIT based, not meter-size based — fee = (sum of plumbing fixture values ÷ 60) × $570 (fixture weights in Sec. 18-216). The same formula and per-ERC rate apply to nonresidential; only the fixture count differs, so the stored amount is the published 1-ERC base. +25% surcharge for service outside city limits. Exclusive of and in addition to any tap-on fee (Sec. 18-217). CONFIRMED (audit 2026-07-11): the fixture formula and the per-ERC rate are both published in the adopted code, so the stored 1-ERC base is the confirmed published figure; per-project totals scale with the fixture count by design (Guide precedent: Macclenny / Bay County / GRU). Callaway City Hall (850) 871-6000.
- Sewer Impact Fee (City of Callaway) — 1 ERC × $970.00/ERC$970.00 one-timeCity of CallawayCode Sec. 18-215(b)(1), Ord. 974 (8-22-2017): impact fee for ONE equivalent residential sewer connection = $970.00. FIXTURE-UNIT based — fee = (sum of sewage-related fixture values ÷ 36) × $970; hose bibs excluded. Same formula and per-ERC rate for nonresidential; stored amount is the published 1-ERC base. +25% surcharge outside city limits. CONFIRMED (audit 2026-07-11): formula and per-ERC rate both published in the adopted code; per-project totals scale with fixture count by design. Callaway City Hall (850) 871-6000.
- City Impact Fees — None (City of Callaway, Commercial)$0.00City of CallawayCONFIRMED $0. Callaway's only impact fees are the water and sewer impact fees in Code Ch. 18 (Utilities), Art. VI (Ord. 974, 8-22-2017) — those are utility fees and live in the Water/Sewer table. No transportation, mobility, parks, fire, police or library impact fee chapter exists in the Callaway code. Water/sewer are NOT City fees.
- County Overlay Fees — None applying (Bay County, Callaway, Commercial)$0.00Bay CountyCONFIRMED $0. Bay County's only nonresidential impact fee is the MSTU-Fire per-sq-ft fee, which applies in the unincorporated MSTU fire service area only. Library and Parks & Rec impact fees are residential-only AND unincorporated-only. Callaway is incorporated and has its own fire department — no county overlay impact fee applies. Bay County levies no county transportation/road impact fee.
Where in Bay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).
Callaway: Industrial Impact Fees
Industrial development in Callaway pays no per-square-foot impact fees, but owes $1,540.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 50,000 sq ft building, that comes to about $1,540.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Callaway) — 1 ERC × $970.00/ERC ($970.00 one-time) and Water Impact Fee (City of Callaway) — 1 ERC × $570.00/ERC ($570.00 one-time).
View the full fee schedule
- Water Impact Fee (City of Callaway) — 1 ERC × $570.00/ERC$570.00 one-timeCity of CallawayCode Sec. 18-215(b)(1), Ord. 974 (8-22-2017): impact fee for ONE equivalent residential water connection = $570.00. FIXTURE-UNIT based, not meter-size based — fee = (sum of plumbing fixture values ÷ 60) × $570 (fixture weights in Sec. 18-216). The same formula and per-ERC rate apply to nonresidential; only the fixture count differs, so the stored amount is the published 1-ERC base. +25% surcharge for service outside city limits. Exclusive of and in addition to any tap-on fee (Sec. 18-217). CONFIRMED (audit 2026-07-11): the fixture formula and the per-ERC rate are both published in the adopted code, so the stored 1-ERC base is the confirmed published figure; per-project totals scale with the fixture count by design (Guide precedent: Macclenny / Bay County / GRU). Callaway City Hall (850) 871-6000.
- Sewer Impact Fee (City of Callaway) — 1 ERC × $970.00/ERC$970.00 one-timeCity of CallawayCode Sec. 18-215(b)(1), Ord. 974 (8-22-2017): impact fee for ONE equivalent residential sewer connection = $970.00. FIXTURE-UNIT based — fee = (sum of sewage-related fixture values ÷ 36) × $970; hose bibs excluded. Same formula and per-ERC rate for nonresidential; stored amount is the published 1-ERC base. +25% surcharge outside city limits. CONFIRMED (audit 2026-07-11): formula and per-ERC rate both published in the adopted code; per-project totals scale with fixture count by design. Callaway City Hall (850) 871-6000.
- City Impact Fees — None (City of Callaway, Industrial)$0.00City of CallawayCONFIRMED $0. Callaway levies no nonresidential city impact fee — its only impact fees are water/sewer (Code Ch. 18 Art. VI, Ord. 974), tracked in the Water/Sewer table.
- County Overlay Fees — None applying (Bay County, Callaway, Industrial)$0.00Bay CountyCONFIRMED $0. Bay County impact fees (MSTU-Fire, Library, Parks & Rec) apply in the unincorporated area only. Callaway is incorporated.
Where in Bay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).
Callaway: Office Impact Fees
Office development in Callaway pays no per-square-foot impact fees, but owes $1,540.00 in one-time water and sewer connection fees (rates sourced July 11, 2026).
For a 25,000 sq ft building, that comes to about $1,540.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Impact Fee (City of Callaway) — 1 ERC × $970.00/ERC ($970.00 one-time) and Water Impact Fee (City of Callaway) — 1 ERC × $570.00/ERC ($570.00 one-time).
View the full fee schedule
- Water Impact Fee (City of Callaway) — 1 ERC × $570.00/ERC$570.00 one-timeCity of CallawayCode Sec. 18-215(b)(1), Ord. 974 (8-22-2017): impact fee for ONE equivalent residential water connection = $570.00. FIXTURE-UNIT based, not meter-size based — fee = (sum of plumbing fixture values ÷ 60) × $570 (fixture weights in Sec. 18-216). The same formula and per-ERC rate apply to nonresidential; only the fixture count differs, so the stored amount is the published 1-ERC base. +25% surcharge for service outside city limits. Exclusive of and in addition to any tap-on fee (Sec. 18-217). CONFIRMED (audit 2026-07-11): the fixture formula and the per-ERC rate are both published in the adopted code, so the stored 1-ERC base is the confirmed published figure; per-project totals scale with the fixture count by design (Guide precedent: Macclenny / Bay County / GRU). Callaway City Hall (850) 871-6000.
- Sewer Impact Fee (City of Callaway) — 1 ERC × $970.00/ERC$970.00 one-timeCity of CallawayCode Sec. 18-215(b)(1), Ord. 974 (8-22-2017): impact fee for ONE equivalent residential sewer connection = $970.00. FIXTURE-UNIT based — fee = (sum of sewage-related fixture values ÷ 36) × $970; hose bibs excluded. Same formula and per-ERC rate for nonresidential; stored amount is the published 1-ERC base. +25% surcharge outside city limits. CONFIRMED (audit 2026-07-11): formula and per-ERC rate both published in the adopted code; per-project totals scale with fixture count by design. Callaway City Hall (850) 871-6000.
- City Impact Fees — None (City of Callaway, Office)$0.00City of CallawayCONFIRMED $0. Callaway levies no nonresidential city impact fee — its only impact fees are water/sewer (Code Ch. 18 Art. VI, Ord. 974), tracked in the Water/Sewer table.
- County Overlay Fees — None applying (Bay County, Callaway, Office)$0.00Bay CountyCONFIRMED $0. Bay County impact fees (MSTU-Fire, Library, Parks & Rec) apply in the unincorporated area only. Callaway is incorporated.
Where in Bay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).
Estimate your project in Callaway
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Callaway, Florida?
A new single-family home in Callaway pays $1,754.00 per unit in combined impact fees (rates sourced July 11, 2026).
How much are commercial impact fees in Callaway?
Commercial development in Callaway pays no per-square-foot impact fees, but owes $1,540.00 in one-time water and sewer connection fees.
Does Callaway charge its own impact fees?
Yes. Callaway levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Callaway, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Bay County impact fees page.