Unincorporated Clay County: Single-Family Impact Fees
A new single-family home in unincorporated Clay County pays $20,632.31 per unit in impact fees (rates sourced July 23, 2026). All of it is levied by Clay County.
The largest line items are County Impact Fees (Clay County - Unincorporated) ($15,296.00), Sewer Connection Fee (CCUA, Clay County - Unincorporated) ($4,345.34) and Water Connection Fee (CCUA, Clay County - Unincorporated) ($990.97).
View the full fee schedule
- Water Connection Fee (CCUA, Clay County - Unincorporated)$990.97Clay County Utility Authority (CCUA)CCUA serves most developed parts of unincorporated Clay County. Water per ERC = Water Capacity $476.93 + Alternative Water Supply $411.64 + SJRWMD Black Creek $102.40 = $990.97, eff. 10/1/2025; SFR = 1.0 ERC. Additional one-time items not included in Fee Amount: potable water meter w/ backflow + box $501.34 (5/8x3/4in; larger at cost), Debt Service Charge $246.79/ERC, and a $410.00 surcharge where no reclaimed piping is installed. CCUA re-adopts each Oct 1. Source: clayutility.org Service Charges and Miscellaneous Fees.
- Sewer Connection Fee (CCUA, Clay County - Unincorporated)$4,345.34Clay County Utility Authority (CCUA)CCUA provides wastewater to most developed parts of unincorporated Clay County. Wastewater Connection Charge = $4,345.34 per ERC, eff. 10/1/2025; SFR = 1.0 ERC. The schedule carves out Keystone Heights properties in FDEP Grants SG481030 / LP0512. CCUA re-adopts each Oct 1. Source: clayutility.org Service Charges and Miscellaneous Fees.
- City Impact Fee (Clay County - Unincorporated)$0.00N/A — Unincorporated AreaUnincorporated area — no municipal/city-level impact fees apply by definition. Confirmed $0 (not a gap).
- County Impact Fees (Clay County - Unincorporated)$15,296.00Clay CountyVERIFIED 8/3/2026 to the dollar, both components, correct SF tier (1,501–2,499 sqft). County Comprehensive Impact Fees rev. 10/1/2025 (incl. the +1.79% adjustment): Gov/Jails $562 + Fire & Rescue $1,278 + Law Enforcement $968 + Community Parks $1,228 + Regional Parks $356 + Libraries $353 = $4,745 (footnotes confirm all six apply in unincorporated Clay; other tiers: ≤1,500 sf $3,563, 2,500+ $5,927). School Impact Fee Ord. 2023-24 Year 4 eff. 6/1/2026: $10,551. Total $15,296. Mobility fee deliberately EXCLUDED (parcel's district is developer input) — NEW: the five scanned district PDFs ARE readable via OCR; Branan Field & Oakleaf SF 1,500–2,499: $5,083 (2025) → $5,718.38 post-6/15/2026 → ramps annually to $7,624.50 post-2029 — district-tier records can now be built from the posted PDFs. Collection at electrical power clearance.
Where in Clay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Clay County: Multifamily Impact Fees
A new multifamily unit in unincorporated Clay County pays $12,972.31 per unit in impact fees (rates sourced July 23, 2026). All of it is levied by Clay County.
The largest line items are County Impact Fees (Clay County - Unincorporated, MF) ($7,636.00).
Water Connection Fee (CCUA, Clay County - Unincorporated, MF) and Sewer Connection Fee (CCUA, Clay County - Unincorporated, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Connection Fee (CCUA, Clay County - Unincorporated, MF)$990.97Requires confirmationClay County Utility Authority (CCUA)AMOUNT VERIFIED, MF ERC FACTOR UNPUBLISHED (re-checked 8/3/2026; CCUA family — same fee page as the Keystone Heights sibling, eff. 10/1/2025). $990.97/ERC = Water Capacity $476.93 + AWS $411.64 + SJRWMD Black Creek $102.40. CCUA publishes no residential ERC-equivalency table — 1.0 ERC/unit is an assumption. CCUA (904) 272-5999.
- Sewer Connection Fee (CCUA, Clay County - Unincorporated, MF)$4,345.34Requires confirmationClay County Utility Authority (CCUA)CCUA provides wastewater to most developed parts of unincorporated Clay County. Wastewater Connection Charge = $4,345.34 per ERC, eff. 10/1/2025. Entered at 1.0 ERC/unit. Unconfirmed: the per-MF-unit ERC factor — CCUA publishes no residential ERC-equivalency table. The schedule carves out Keystone Heights properties in FDEP Grants SG481030 / LP0512. CCUA re-adopts each Oct 1. Source: clayutility.org Service Charges and Miscellaneous Fees.
- City Impact Fee (Clay County - Unincorporated, MF)$0.00N/AUnincorporated area — no municipal/city-level impact fees apply by definition. MF development pays county impact fees, the Clay County mobility fee, the school fee, and utility connection charges. Confirmed $0 (not a gap).
- County Impact Fees (Clay County - Unincorporated, MF)$7,636.00Clay CountyVERIFIED 8/3/2026, BOTH COMPONENTS CURRENT. $7,636/unit = $2,829 comprehensive (Gov/Jails $335 + Fire $761 + Law $577 + Comm. Parks $732 + Reg. Parks $213 + Libraries $211; applies to permit packages after 10/1/2025, all six categories unincorporated per schedule footnotes) + $4,807 school (Ord. 2023-24 Year 4 MF rate, eff. 6/1/2026 ongoing). Scope note: county MOBILITY fee excluded — district rates (Ord. 2026-8, scanned PDFs) to be modeled as separate records. Sources: county comprehensive schedule PDF + school-concurrency page.
Where in Clay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Clay County: Commercial Impact Fees
Commercial development in unincorporated Clay County pays $22.59 per square foot in impact fees, plus $13,340.78 in one-time water and sewer connection fees (rates sourced July 23, 2026).
For a 50,000 sq ft building, that comes to about $1,143,090.78. The calculator below adjusts to your exact square footage.
The largest line items are County Comprehensive Impact Fees (Clay County - Unincorporated, Commercial) ($2.46/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Mobility Fee (Clay County - Unincorporated, Commercial), Sewer Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $4,345.34/ERC, and Water Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $990.97/ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $990.97/ERC$2,477.43 one-timeRequires confirmationClay County Utility Authority (CCUA)CCUA is the primary water provider in unincorporated Clay County. Water Service Availability Charges eff. 10/01/2025, per ERC: Water Capacity $476.93 + Alternative Water Supply $411.64 + SJRWMD Black Creek $102.40 = $990.97/ERC. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder on its Commercial Rates page (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), whose base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Other one-time items not included: potable water meter w/ backflow + box $501.34 (5/8x3/4; larger at cost); Debt Service Charge $246.79/ERC; reclaimed surcharge $410.00 if no reclaimed piping. Note also the Middleburg Service Area Development Policy per-acre infrastructure charges ($5,786/acre water) and LAMPA infrastructure fee ($823.92/ERC water), which apply only in those specific service areas.
- Sewer Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $4,345.34/ERC$10,863.35 one-timeRequires confirmationClay County Utility Authority (CCUA)CCUA is the primary wastewater provider in unincorporated Clay County. Wastewater Connection Charge = $4,345.34 per ERC (Service Availability Charges eff. 10/01/2025); the schedule's exclusion applies to Keystone Heights only. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), whose base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Debt Service Charge $246.79/ERC not included. Middleburg Service Area per-acre wastewater infrastructure charge ($11,131/acre) and LAMPA wastewater infrastructure fee ($1,194.87/ERC) apply only in those service areas.
- City Impact Fee (Clay County - Unincorporated, Commercial)$0.00N/A — Unincorporated AreaUnincorporated area — no municipal/city-level impact fees apply by definition. Confirmed $0, not a gap.
- County Mobility Fee (Clay County - Unincorporated, Commercial)$20.13/sq ftRequires confirmationLake Asbury & Green Cove Springs DistrictClay County Mobility Fee — Lake Asbury & Green Cove Springs benefit district (HIGHEST-rate of 5; set as Is Default). Schedule row ITE 820 Retail Shopping Center, per 1,000 sq ft GFA. Amount = last-published 2025 rate. UNCONFIRMED/SUPERSEDED: 6/15/2026 step-up district PDF (claycountygov showpublisheddocument/9324) image-only, no text layer — re-attempted 2026-07-23 (direct fetch, Chrome render, Google Docs viewer) all failed. Applies only to new construction in unincorporated Clay (Ord. Sec. 2.01.A/3.06); auto-adjusts each June 15 through 6/15/2029, next 6/15/2027. Exploded from note-only district rates on audit 2026-07-23. 2026 rates → Planning & Zoning 904-269-6300 / Impact Fee Coordinator 904-529-3836.
- County Comprehensive Impact Fees (Clay County - Unincorporated, Commercial)$2.46/sq ftClay CountyClay County Comprehensive Impact Fees, permits submitted after 10/1/2025. Schedule row: 'Commercial: Retail and Services', per 1,000 sq ft. All applicable categories in the unincorporated area: Gov Jails $443 + Fire & Rescue $1,257 + Law Enforcement $764 = $2,464. Community Parks (footnote 4), Regional Parks and Libraries all show $0 in every nonresidential row of the schedule — these categories are residential-only. School impact fees do not apply to nonresidential. Rates adjust each Oct 1 by ENR CCI. Mobility fee is a separate County record.
Where in Clay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Clay County: Industrial Impact Fees
Industrial development in unincorporated Clay County pays $4.21 per square foot in impact fees, plus $13,340.78 in one-time water and sewer connection fees (rates sourced July 23, 2026).
For a 50,000 sq ft building, that comes to about $223,990.78. The calculator below adjusts to your exact square footage.
The largest line items are County Comprehensive Impact Fees (Clay County - Unincorporated, Industrial) ($1.04/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Mobility Fee (Clay County - Unincorporated, Industrial), Sewer Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $4,345.34/ERC, and Water Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $990.97/ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $990.97/ERC$2,477.43 one-timeRequires confirmationClay County Utility Authority (CCUA)CCUA is the primary water provider in unincorporated Clay County. Water Service Availability Charges eff. 10/01/2025, per ERC: Water Capacity $476.93 + Alternative Water Supply $411.64 + SJRWMD Black Creek $102.40 = $990.97/ERC. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder on its Commercial Rates page (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), whose base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Other one-time items not included: potable water meter w/ backflow + box $501.34 (5/8x3/4; larger at cost); Debt Service Charge $246.79/ERC; reclaimed surcharge $410.00 if no reclaimed piping. Note also the Middleburg Service Area Development Policy per-acre infrastructure charges ($5,786/acre water) and LAMPA infrastructure fee ($823.92/ERC water), which apply only in those specific service areas.
- Sewer Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $4,345.34/ERC$10,863.35 one-timeRequires confirmationClay County Utility Authority (CCUA)CCUA is the primary wastewater provider in unincorporated Clay County. Wastewater Connection Charge = $4,345.34 per ERC (Service Availability Charges eff. 10/01/2025); the schedule's exclusion applies to Keystone Heights only. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), whose base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Debt Service Charge $246.79/ERC not included. Middleburg Service Area per-acre wastewater infrastructure charge ($11,131/acre) and LAMPA wastewater infrastructure fee ($1,194.87/ERC) apply only in those service areas.
- City Impact Fee (Clay County - Unincorporated, Industrial)$0.00N/A — Unincorporated AreaUnincorporated area — no municipal/city-level impact fees apply by definition. Confirmed $0, not a gap.
- County Mobility Fee (Clay County - Unincorporated, Industrial)$3.17/sq ftRequires confirmationLake Asbury & Green Cove Springs DistrictClay County Mobility Fee — Lake Asbury & Green Cove Springs benefit district (HIGHEST-rate of 5; Is Default). No ITE 110 row; nearest general industrial row ITE 140 Manufacturing, per 1,000 sq ft GFA. Amount = last-published 2025 rate. UNCONFIRMED/SUPERSEDED: 6/15/2026 step-up district PDF (claycountygov showpublisheddocument/9324) image-only, no text layer — re-attempted 2026-07-23 (direct fetch, Chrome render, Google Docs viewer) all failed. Applies only in unincorporated Clay (Ord. Sec. 2.01.A/3.06); auto-adjusts each June 15 through 6/15/2029, next 6/15/2027. Exploded from note-only district rates on audit 2026-07-23. 2026 rates → Planning & Zoning 904-269-6300 / Impact Fee Coordinator 904-529-3836.
- County Comprehensive Impact Fees (Clay County - Unincorporated, Industrial)$1.04/sq ftClay CountyClay County Comprehensive Impact Fees, after 10/1/2025. Schedule row: 'Industrial', per 1,000 sq ft. Unincorporated: Gov Jails $128 + Fire $688 + Law Enforcement $222 = $1,038. Parks/Libraries $0 for nonres.
Where in Clay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Clay County: Office Impact Fees
Office development in unincorporated Clay County pays $7.14 per square foot in impact fees, plus $13,340.78 in one-time water and sewer connection fees (rates sourced July 23, 2026).
For a 25,000 sq ft building, that comes to about $191,865.78. The calculator below adjusts to your exact square footage.
The largest line items are County Comprehensive Impact Fees (Clay County - Unincorporated, Office) ($2.95/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
County Mobility Fee (Clay County - Unincorporated, Office), Sewer Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $4,345.34/ERC, and Water Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $990.97/ERC are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $990.97/ERC$2,477.43 one-timeRequires confirmationClay County Utility Authority (CCUA)CCUA is the primary water provider in unincorporated Clay County. Water Service Availability Charges eff. 10/01/2025, per ERC: Water Capacity $476.93 + Alternative Water Supply $411.64 + SJRWMD Black Creek $102.40 = $990.97/ERC. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder on its Commercial Rates page (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), whose base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Other one-time items not included: potable water meter w/ backflow + box $501.34 (5/8x3/4; larger at cost); Debt Service Charge $246.79/ERC; reclaimed surcharge $410.00 if no reclaimed piping. Note also the Middleburg Service Area Development Policy per-acre infrastructure charges ($5,786/acre water) and LAMPA infrastructure fee ($823.92/ERC water), which apply only in those specific service areas.
- Sewer Connection Fee (CCUA, Clay County - Unincorporated) — 1" meter, 2.5 ERC × $4,345.34/ERC$10,863.35 one-timeRequires confirmationClay County Utility Authority (CCUA)CCUA is the primary wastewater provider in unincorporated Clay County. Wastewater Connection Charge = $4,345.34 per ERC (Service Availability Charges eff. 10/01/2025); the schedule's exclusion applies to Keystone Heights only. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), whose base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Debt Service Charge $246.79/ERC not included. Middleburg Service Area per-acre wastewater infrastructure charge ($11,131/acre) and LAMPA wastewater infrastructure fee ($1,194.87/ERC) apply only in those service areas.
- City Impact Fee (Clay County - Unincorporated, Office)$0.00N/A — Unincorporated AreaUnincorporated area — no municipal/city-level impact fees apply by definition. Confirmed $0, not a gap.
- County Mobility Fee (Clay County - Unincorporated, Office)$4.19/sq ftRequires confirmationLake Asbury & Green Cove Springs DistrictClay County Mobility Fee — Lake Asbury & Green Cove Springs benefit district (HIGHEST-rate of 5; Is Default). Schedule row ITE 710 General Office Building; net = gross $7,870 − subsidy $3,677 = $4,193, per 1,000 sq ft GFA. Amount = last-published 2025 rate. UNCONFIRMED/SUPERSEDED: 6/15/2026 step-up district PDF (claycountygov showpublisheddocument/9324) image-only, no text layer — re-attempted 2026-07-23 (direct fetch, Chrome render, Google Docs viewer) all failed. Applies only in unincorporated Clay (Ord. Sec. 2.01.A/3.06); auto-adjusts each June 15 through 6/15/2029, next 6/15/2027. Exploded from note-only district rates on audit 2026-07-23. 2026 rates → Planning & Zoning 904-269-6300 / Impact Fee Coordinator 904-529-3836.
- County Comprehensive Impact Fees (Clay County - Unincorporated, Office)$2.95/sq ftClay CountyClay County Comprehensive Impact Fees, after 10/1/2025. Schedule row: 'Office', per 1,000 sq ft. Unincorporated: Gov Jails $372 + Fire $1,934 + Law Enforcement $642 = $2,948. Parks/Libraries $0 for nonres.
Estimate your project in Clay County
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are single-family impact fees in Clay County, Florida?
A new single-family home in unincorporated Clay County pays $20,632.31 per unit in impact fees (rates sourced July 23, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Clay County?
Multifamily development in unincorporated Clay County pays $12,972.31 per unit in impact fees (rates sourced July 23, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Clay County?
Commercial development in unincorporated Clay County pays $22.59 per square foot in impact fees, plus $13,340.78 in one-time water and sewer connection fees (assuming a 1-inch meter), about $1,143,090.78 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Do cities in Clay County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 2 of 4 cities in Clay County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.