Keystone Heights impact fees by project type
Keystone Heights: Single-Family Impact Fees
A new single-family home in Keystone Heights pays $15,918.97 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Clay County.
The largest line items are Water Connection Fee (CCUA, City of Keystone Heights) ($990.97).
County Impact Fees (City of Keystone Heights) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Connection Fee (CCUA, City of Keystone Heights)$990.97Clay County Utility Authority (CCUA)CONFIRMED 7/11/2026. CCUA provides water to Keystone Heights. Water per ERC = Water Capacity $476.93 + Alternative Water Supply $411.64 + SJRWMD Black Creek $102.40 = $990.97/ERC (eff. 10/01/2025). The Keystone FDEP-grant exclusion in the CCUA schedule applies to the WASTEWATER connection charge only — the water charges carry no such carve-out. SFR = 1.0 ERC. Source: clayutility.org Service Charges and Miscellaneous Fees.
- Sewer Connection Fee (CCUA, City of Keystone Heights)$0.00City of Keystone Heights / CCUACONFIRMED $0 — 7/11/2026. CCUA's adopted Service Availability Charges (eff. 10/01/2025) list the Wastewater Connection Charge Per ERC at $4,345.34 'excluding Keystone included in FDEP Grant SG481030 and LP0512' — i.e. Keystone Heights is expressly carved out; the septic-to-sewer conversion is grant-funded and no capital wastewater connection charge is levied there. This is a confirmed zero, not an unverified placeholder. Re-check if the FDEP grant period ends. Source: clayutility.org Service Charges and Miscellaneous Fees.
- City Impact Fees (City of Keystone Heights)$0.00City of Keystone HeightsConfirmed $0. City of Keystone Heights levies no municipal development impact fees. Full Municode chapter list reviewed — no impact-fee chapter (Ch. 15 checked). Pop. ~1,400. Source: library.municode.com/fl/keystone_heights.
- County Impact Fees (City of Keystone Heights)$14,928.00Requires confirmationClay CountyCounty Comprehensive Impact Fees rev. 10/1/2025 (CONFIRMED still operative 7/11/2026) — 5 categories apply in KH (Law Enforcement per footnote 3): Gov Jails $562 + Fire $1,278 + Law Enf $968 + Regional Parks $356 + Libraries $353 = $3,517. Community Parks N/A (unincorporated only). School Year 4 (eff. 6/1/2026): $10,551. Mobility (Keystone Heights & South Clay district): $860 — ⚠️ THIS IS THE SUPERSEDED 2025 RATE. Clay's new Mobility Fee Ordinance + district rate schedules took effect JUNE 15, 2026; the 2026 KH/South Clay PDF is image-only (no text layer; Chrome PDF plugin and Google Docs viewer both fail to render) so the current rate is unverified. Stored total $14,928 therefore carries a stale mobility component. Get the 2026 rate → Planning & Zoning 904-269-6300.
Where in Clay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Keystone Heights: Multifamily Impact Fees
A new multifamily unit in Keystone Heights pays $8,701.97 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Clay County.
Water Connection Fee (CCUA, City of Keystone Heights, MF) and County Impact Fees (City of Keystone Heights, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Connection Fee (CCUA, City of Keystone Heights, MF)$990.97Requires confirmationClay County Utility Authority (CCUA)Rate CONFIRMED 7/11/2026: CCUA water per ERC = $990.97 (Water Capacity $476.93 + Alternative Water Supply $411.64 + SJRWMD Black Creek $102.40; eff. 10/01/2025). CCUA serves Keystone Heights water; the Keystone FDEP-grant carve-out applies to wastewater only. Entered at 1.0 ERC/unit. ⚠️ Still Unconfirmed: per-MF-unit ERC factor → CCUA 904-272-5999.
- Sewer Connection Fee (CCUA, City of Keystone Heights, MF)$0.00City of Keystone Heights / CCUACONFIRMED $0 — 7/11/2026. CCUA's adopted Service Availability Charges (eff. 10/01/2025) set the Wastewater Connection Charge Per ERC at $4,345.34 'excluding Keystone included in FDEP Grant SG481030 and LP0512' — Keystone Heights is expressly carved out (grant-funded septic-to-sewer conversion), so no capital wastewater connection charge is levied there, for SFR or MF. Confirmed zero, not an unverified placeholder. Re-check if the FDEP grant period ends. Source: clayutility.org Service Charges and Miscellaneous Fees.
- City Impact Fees (City of Keystone Heights, MF)$0.00City of Keystone HeightsConfirmed $0. City of Keystone Heights levies no municipal development impact fees. Municode chapter list reviewed — no impact-fee chapter. Pop. ~1,400.
- County Impact Fees (City of Keystone Heights, MF)$7,711.00Requires confirmationClay CountyCounty Comprehensive Impact Fees rev. 10/1/2025 (CONFIRMED still operative 7/11/2026), MF column — 5 categories apply (Law Enforcement per footnote 3): Gov Jails $335 + Fire $761 + Law Enf $577 + Regional Parks $213 + Libraries $211 = $2,097. Community Parks N/A. School Year 4 (eff. 6/1/2026): $4,807. Mobility (Keystone Heights & South Clay district): $807 — ⚠️ SUPERSEDED 2025 RATE. Clay's 2026 mobility ordinance + district rate schedules took effect JUNE 15, 2026; the 2026 PDF is image-only and unreadable via fetch, Chrome PDF plugin, or Google Docs viewer. Stored total $7,711 carries a stale mobility component. Get the 2026 rate → Planning & Zoning 904-269-6300.
Where in Clay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Keystone Heights: Commercial Impact Fees
Commercial development in Keystone Heights pays $2.46 per square foot in impact fees, plus $2,477.43 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $125,677.43. The calculator below adjusts to your exact square footage.
The largest line items are County Comprehensive Impact Fees (City of Keystone Heights, Commercial) ($2.46/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $990.97/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $990.97/ERC$2,477.43 one-timeRequires confirmationClay County Utility Authority (CCUA)CCUA provides water to Keystone Heights. Water Service Availability Charges eff. 10/01/2025, per ERC: Water Capacity $476.93 + Alternative Water Supply $411.64 + SJRWMD Black Creek Water Resource Development Project $102.40 = $990.97/ERC. The Keystone FDEP-grant exclusion in CCUA's schedule applies to the WASTEWATER connection charge ONLY — water carries no carve-out. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder on its Commercial Rates page (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), where base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Other one-time items not included: potable water meter w/ backflow + box $501.34 (5/8x3/4; larger at cost); Debt Service Charge $246.79/ERC; reclaimed surcharge $410.00 if no reclaimed piping.
- Sewer Connection Fee (CCUA, City of Keystone Heights)$0.00Clay County Utility Authority (CCUA)CONFIRMED $0 — not an unverified placeholder. CCUA's adopted Service Availability Charges (eff. 10/01/2025) list the Wastewater Connection Charge Per ERC at $4,345.34 'excluding Keystone included in FDEP Grant SG481030 and LP0512'. Keystone Heights is expressly carved out: the septic-to-sewer conversion there is grant-funded and no capital wastewater connection charge is levied, for any customer class including nonresidential. Because the charge is $0 regardless of meter size, no meter tiers exist. Re-check if the FDEP grant period ends. Contact CCUA 904-272-5999.
- City Impact Fees (City of Keystone Heights, Commercial)$0.00City of Keystone HeightsConfirmed $0 — not an unverified placeholder. City of Keystone Heights (pop. ~1,450) levies no municipal development impact fees of any kind, residential or nonresidential. Full Municode chapter list reviewed; no impact-fee or development-fee chapter exists. Development in the city is subject to Clay County comprehensive impact fees and the county mobility fee (separate County records).
- County Comprehensive Impact Fees (City of Keystone Heights, Commercial)$2.46/sq ftClay CountyClay County Comprehensive Impact Fees, permits submitted after 10/1/2025. Schedule row: 'Commercial: Retail and Services', per 1,000 sq ft. Applicable in Keystone Heights: Gov Jails $443 (countywide, footnote 1) + Fire & Rescue $1,257 (footnote 2 — all cities except Orange Park) + Law Enforcement $764 (footnote 3 — unincorporated + Keystone Heights + Penney Farms) = $2,464. Community Parks (footnote 4, unincorporated only), Regional Parks and Libraries are $0 for all nonres rows. School impact fees do not apply to nonresidential. Rates adjust each Oct 1 by ENR CCI.
- County Mobility Fee (City of Keystone Heights, Commercial)$0.00Clay CountyCONFIRMED $0 — the Clay County Mobility Fee does NOT apply inside municipal limits. Clay County Mobility Fee Ordinance (2026 restatement, eff. 6/15/2026), Sec. 2.01.A (Imposition): 'All New Construction occurring within the unincorporated area of the County shall pay the applicable Mobility Fee established in this Ordinance.' Sec. 3.06 (Applicability): the Ordinance applies to New Construction 'within the unincorporated area of the County'. The ordinance contains NO interlocal agreement or municipal opt-in provision, and its 'County Transportation System' definition expressly excludes roads within a City Street System. Keystone Heights levies no municipal mobility or impact fee of its own (full Municode chapter list reviewed). CORRECTED ON AUDIT 2026-07-12: this record previously carried the Keystone Heights & South Clay DISTRICT rate ($2,250/1,000 sq ft), entered in error — the district rate governs the surrounding unincorporated area, not the city. County Comprehensive Impact Fees DO apply in Keystone Heights (separate County record). Contact: Planning & Zoning 904-269-6300.
Where in Clay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Keystone Heights: Industrial Impact Fees
Industrial development in Keystone Heights pays $1.04 per square foot in impact fees, plus $2,477.43 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $54,377.43. The calculator below adjusts to your exact square footage.
The largest line items are County Comprehensive Impact Fees (City of Keystone Heights, Industrial) ($1.04/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $990.97/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $990.97/ERC$2,477.43 one-timeRequires confirmationClay County Utility Authority (CCUA)CCUA provides water to Keystone Heights. Water Service Availability Charges eff. 10/01/2025, per ERC: Water Capacity $476.93 + Alternative Water Supply $411.64 + SJRWMD Black Creek Water Resource Development Project $102.40 = $990.97/ERC. The Keystone FDEP-grant exclusion in CCUA's schedule applies to the WASTEWATER connection charge ONLY — water carries no carve-out. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder on its Commercial Rates page (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), where base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Other one-time items not included: potable water meter w/ backflow + box $501.34 (5/8x3/4; larger at cost); Debt Service Charge $246.79/ERC; reclaimed surcharge $410.00 if no reclaimed piping.
- Sewer Connection Fee (CCUA, City of Keystone Heights)$0.00Clay County Utility Authority (CCUA)CONFIRMED $0 — not an unverified placeholder. CCUA's adopted Service Availability Charges (eff. 10/01/2025) list the Wastewater Connection Charge Per ERC at $4,345.34 'excluding Keystone included in FDEP Grant SG481030 and LP0512'. Keystone Heights is expressly carved out: the septic-to-sewer conversion there is grant-funded and no capital wastewater connection charge is levied, for any customer class including nonresidential. Because the charge is $0 regardless of meter size, no meter tiers exist. Re-check if the FDEP grant period ends. Contact CCUA 904-272-5999.
- City Impact Fees (City of Keystone Heights, Industrial)$0.00City of Keystone HeightsConfirmed $0. City of Keystone Heights levies no municipal development impact fees. Full Municode chapter list reviewed — no impact-fee chapter.
- County Comprehensive Impact Fees (City of Keystone Heights, Industrial)$1.04/sq ftClay CountyClay County Comprehensive Impact Fees, after 10/1/2025. Schedule row: 'Industrial', per 1,000 sq ft. Applicable in Keystone Heights: Gov Jails $128 + Fire $688 + Law Enforcement $222 = $1,038. Parks/Libraries $0 for nonres.
- County Mobility Fee (City of Keystone Heights, Industrial)$0.00Clay CountyCONFIRMED $0 — the Clay County Mobility Fee does NOT apply inside municipal limits. Mobility Fee Ordinance (2026 restatement, eff. 6/15/2026), Sec. 2.01.A + Sec. 3.06: the fee reaches only New Construction 'within the unincorporated area of the County'. No interlocal/municipal opt-in provision; 'County Transportation System' excludes City Street System roads. Keystone Heights levies no municipal mobility/impact fee. CORRECTED ON AUDIT 2026-07-12: previously held the Keystone Heights & South Clay DISTRICT rate ($355/1,000 sq ft, ITE 140 Manufacturing), entered in error. County Comprehensive Impact Fees DO apply here (separate County record). Contact: Planning & Zoning 904-269-6300.
Where in Clay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Keystone Heights: Office Impact Fees
Office development in Keystone Heights pays $2.95 per square foot in impact fees, plus $2,477.43 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 25,000 sq ft building, that comes to about $76,177.43. The calculator below adjusts to your exact square footage.
The largest line items are County Comprehensive Impact Fees (City of Keystone Heights, Office) ($2.95/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $990.97/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $990.97/ERC$2,477.43 one-timeRequires confirmationClay County Utility Authority (CCUA)CCUA provides water to Keystone Heights. Water Service Availability Charges eff. 10/01/2025, per ERC: Water Capacity $476.93 + Alternative Water Supply $411.64 + SJRWMD Black Creek Water Resource Development Project $102.40 = $990.97/ERC. The Keystone FDEP-grant exclusion in CCUA's schedule applies to the WASTEWATER connection charge ONLY — water carries no carve-out. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder on its Commercial Rates page (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), where base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Other one-time items not included: potable water meter w/ backflow + box $501.34 (5/8x3/4; larger at cost); Debt Service Charge $246.79/ERC; reclaimed surcharge $410.00 if no reclaimed piping.
- Sewer Connection Fee (CCUA, City of Keystone Heights)$0.00Clay County Utility Authority (CCUA)CONFIRMED $0 — not an unverified placeholder. CCUA's adopted Service Availability Charges (eff. 10/01/2025) list the Wastewater Connection Charge Per ERC at $4,345.34 'excluding Keystone included in FDEP Grant SG481030 and LP0512'. Keystone Heights is expressly carved out: the septic-to-sewer conversion there is grant-funded and no capital wastewater connection charge is levied, for any customer class including nonresidential. Because the charge is $0 regardless of meter size, no meter tiers exist. Re-check if the FDEP grant period ends. Contact CCUA 904-272-5999.
- City Impact Fees (City of Keystone Heights, Office)$0.00City of Keystone HeightsConfirmed $0. City of Keystone Heights levies no municipal development impact fees. Full Municode chapter list reviewed — no impact-fee chapter.
- County Comprehensive Impact Fees (City of Keystone Heights, Office)$2.95/sq ftClay CountyClay County Comprehensive Impact Fees, after 10/1/2025. Schedule row: 'Office', per 1,000 sq ft. Applicable in Keystone Heights: Gov Jails $372 + Fire $1,934 + Law Enforcement $642 = $2,948. Parks/Libraries $0 for nonres.
- County Mobility Fee (City of Keystone Heights, Office)$0.00Clay CountyCONFIRMED $0 — the Clay County Mobility Fee does NOT apply inside municipal limits. Mobility Fee Ordinance (2026 restatement, eff. 6/15/2026), Sec. 2.01.A: fee is imposed on 'All New Construction occurring within the unincorporated area of the County'; Sec. 3.06 (Applicability) repeats the unincorporated-area limit. No interlocal or municipal opt-in provision exists; 'County Transportation System' expressly excludes roads within a City Street System. Keystone Heights levies no municipal mobility/impact fee of its own. CORRECTED ON AUDIT 2026-07-12: previously held the Keystone Heights & South Clay DISTRICT rate ($879/1,000 sq ft, ITE 710 General Office), entered in error. County Comprehensive Impact Fees DO apply here (separate County record). Contact: Planning & Zoning 904-269-6300.
Where in Clay County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Keystone Heights
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Keystone Heights, Florida?
A new single-family home in Keystone Heights pays $15,918.97 per unit in combined impact fees (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Keystone Heights?
Commercial development in Keystone Heights pays $2.46 per square foot in impact fees, plus $2,477.43 in one-time water and sewer connection fees (assuming a 1-inch meter), about $125,677.43 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Keystone Heights charge its own impact fees?
No. Keystone Heights does not levy its own municipal impact fees. New development in Keystone Heights pays Clay County impact fees, shown on this page.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.