Keystone Heights, Florida Impact Fees

Keystone Heights does not levy its own municipal impact fees. New development in Keystone Heights pays Clay County impact fees, shown below: $20,458.48 per single-family unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Keystone Heights Impact Fees by Project Type

Keystone Heights: Single-Family Impact Fees

A new single-family home in Keystone Heights pays $20,458.48 per unit in impact fees (rates sourced October 17, 2026). All of it is levied by Clay County.

The largest line items are County Impact Fees (City of Keystone Heights) ($14,148.19), Water Connection Fee (CCUA, City of Keystone Heights) ($1,019.88) and Water Meter and Backflow Device Charge (CCUA, City of Keystone Heights) ($522.06).

Sewer Connection Fee (CCUA, City of Keystone Heights) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Keystone Heights Impact Fee Schedule
Water$1,541.94
  • Water Connection Fee (CCUA, City of Keystone Heights)
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) provides water service to the City of Keystone Heights. The one-time water capacity charge is $1,019.88 per equivalent residential connection (ERC) under the Service Availability Charges effective October 1, 2026, made up of a Water Capacity Charge of $492.67, an Alternative Water Supply Charge of $423.99, and an SJRWMD Black Creek Water Resource Development Project Connection Charge of $103.22. A single-family home is 1.0 ERC. The FDEP-grant exclusion in CCUA's schedule reaches the wastewater charge only. The potable water meter with backflow device and meter box is a separate one-time charge; a Debt Service Charge of $279.61 per ERC and the reclaimed-program charges are billed on top and not included. CCUA re-adopts its charges annually effective October 1.
    $1,019.88
  • Water Meter and Backflow Device Charge (CCUA, City of Keystone Heights)
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) charges $522.06 for the potable water meter with backflow device and meter box on a new connection, for the standard 5/8 by 3/4 inch meter, under the Service Availability Charges effective October 1, 2026. Larger meters are charged at cost. CCUA re-adopts its charges annually effective October 1.
    $522.06
Sewer$4,488.74
  • Sewer Connection Fee (CCUA, City of Keystone Heights)
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) provides wastewater service in the City of Keystone Heights. The one-time wastewater connection charge is $4,488.74 per equivalent residential connection (ERC) under the Service Availability Charges effective October 1, 2026, and a single-family home is 1.0 ERC. CCUA's schedule excludes Keystone Heights properties included in FDEP grants SG481030 and LP0512 (the grant-funded septic-to-sewer conversion); those properties pay no wastewater connection charge. CCUA re-adopts its charges annually effective October 1.
    $4,488.74Requires confirmation
City$0.00
  • City Impact Fees (City of Keystone Heights)
    City of Keystone Heights
    The City of Keystone Heights levies no municipal development impact fees. Development in the city pays Clay County impact fees, the county school impact fee, and CCUA water connection charges. The Clay County mobility fee does not apply inside the city.
    $0.00
County$14,148.19
  • County Impact Fees (City of Keystone Heights)
    1,501 to 2,499 sq ft
    Clay County
    A new single-family home of 1,501 to 2,499 square feet in the City of Keystone Heights pays $14,148.19 in Clay County impact fees: $3,597.19 in County Comprehensive Impact Fees for permit packages submitted after October 1, 2026 (Government/Jails & Constitutional Facilities $574.81, Fire & Rescue $1,307.14, Law Enforcement $990.07, Regional Parks $364.12, Libraries & Cultural $361.05), plus a $10,551 School Impact Fee at the Year 4 rate effective June 1, 2026 and continuing until amended. The Community Parks fee applies only in unincorporated Clay. The comprehensive fees are adjusted each October 1. The Clay County mobility fee does not apply inside the city (Mobility Fee Ordinance 2026-8 reaches only the unincorporated area). County impact fees are collected at electrical power clearance (the equipment-check inspection), not when the building permit is issued.
    $14,148.19
Other$279.61
  • Debt Service Charge (CCUA, City of Keystone Heights)
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) charges a one-time Debt Service Charge of $279.61 per equivalent residential connection (ERC) on every new connection, under the Service Availability Charges effective October 1, 2026. It is billed in addition to the water capacity and wastewater connection charges. CCUA re-adopts its charges annually effective October 1.
    $279.61
Total (Keystone Heights): $20,458.48
Sources last checked Official fee schedules:Clay County Utility Authority (CCUA) City of Keystone Heights Clay County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Clay County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Keystone Heights: Multifamily Impact Fees

A new multifamily unit in Keystone Heights pays $13,262.11 per unit in impact fees (rates sourced October 17, 2026). All of it is levied by Clay County.

The largest line items are County Impact Fees (City of Keystone Heights, MF) ($6,951.82) and Water Meter and Backflow Device Charge (CCUA, City of Keystone Heights, MF) ($522.06).

Debt Service Charge (CCUA, City of Keystone Heights, MF), Water Connection Fee (CCUA, City of Keystone Heights, MF), and Sewer Connection Fee (CCUA, City of Keystone Heights, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Keystone Heights Impact Fee Schedule
Water$1,541.94
  • Water Connection Fee (CCUA, City of Keystone Heights, MF)
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) provides water service to the City of Keystone Heights. The one-time water capacity charge is $1,019.88 per equivalent residential connection (ERC) under the Service Availability Charges effective October 1, 2026 (Water Capacity $492.67, Alternative Water Supply $423.99, SJRWMD Black Creek $103.22). The amount shown assumes 1.0 ERC per multifamily unit; CCUA publishes no residential ERC-equivalency table, so a project's actual ERC count may differ. The FDEP-grant exclusion in CCUA's schedule reaches the wastewater charge only. The meter with backflow device and a Debt Service Charge of $279.61 per ERC are billed on top and not included. CCUA re-adopts its charges annually effective October 1.
    $1,019.88Requires confirmation
  • Water Meter and Backflow Device Charge (CCUA, City of Keystone Heights, MF)
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) charges $522.06 for the potable water meter with backflow device and meter box on a new connection, for the standard 5/8 by 3/4 inch meter, under the Service Availability Charges effective October 1, 2026. Shown per unit for a unit on its own meter; a building served through one master meter pays the meter charge once, and larger meters are charged at cost.
    $522.06
Sewer$4,488.74
  • Sewer Connection Fee (CCUA, City of Keystone Heights, MF)
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) provides wastewater service in the City of Keystone Heights. The one-time wastewater connection charge is $4,488.74 per equivalent residential connection (ERC) under the Service Availability Charges effective October 1, 2026, shown at 1.0 ERC per multifamily unit; CCUA publishes no residential ERC-equivalency table, so a project's ERC count may differ. CCUA's schedule excludes Keystone Heights properties included in FDEP grants SG481030 and LP0512 (the grant-funded septic-to-sewer conversion); those properties pay no wastewater connection charge. CCUA re-adopts its charges annually effective October 1.
    $4,488.74Requires confirmation
City$0.00
  • City Impact Fees (City of Keystone Heights, MF)
    City of Keystone Heights
    The City of Keystone Heights levies no municipal development impact fees. Multifamily development in the city pays Clay County impact fees, the county school impact fee, and CCUA water connection charges. The Clay County mobility fee does not apply inside the city.
    $0.00
County$6,951.82
  • County Impact Fees (City of Keystone Heights, MF)
    Clay County
    Each new multifamily unit in the City of Keystone Heights pays $6,951.82 in Clay County impact fees: $2,144.82 in County Comprehensive Impact Fees for permit packages submitted after October 1, 2026 (Government/Jails & Constitutional Facilities $342.64, Fire & Rescue $778.35, Law Enforcement $590.16, Regional Parks $217.86, Libraries & Cultural $215.81), plus a $4,807 per-unit School Impact Fee at the Year 4 rate effective June 1, 2026 and continuing until amended. The Community Parks fee applies only in unincorporated Clay. The comprehensive fees are adjusted each October 1. The Clay County mobility fee does not apply inside the city (Mobility Fee Ordinance 2026-8 reaches only the unincorporated area). County impact fees are collected at electrical power clearance (the equipment-check inspection), not when the building permit is issued.
    $6,951.82
Other$279.61
  • Debt Service Charge (CCUA, City of Keystone Heights, MF)
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) charges a one-time Debt Service Charge of $279.61 per equivalent residential connection (ERC) on every new connection, under the Service Availability Charges effective October 1, 2026. It is billed in addition to the water capacity and wastewater connection charges. The amount shown assumes 1.0 ERC per multifamily unit; CCUA publishes no residential ERC-equivalency table. CCUA re-adopts its charges annually effective October 1.
    $279.61Requires confirmation
Total (Keystone Heights): $13,262.11
Sources last checked Official fee schedules:Clay County Utility Authority (CCUA) City of Keystone Heights Clay County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Clay County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Keystone Heights: Commercial Impact Fees

Commercial development in Keystone Heights pays $2.52 per square foot in impact fees, plus $14,470.58 in one-time water and sewer connection fees (rates sourced October 17, 2026).

For a 50,000 sq ft building, that comes to about $140,479.58. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $1,019.88/ERC ($2,549.70 one-time), Debt Service Charge (CCUA, City of Keystone Heights) ($699.03 one-time) and County Comprehensive Impact Fees (City of Keystone Heights, Commercial) ($2.52/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $4,488.74/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Keystone Heights Impact Fee Schedule
Water$2,549.70 one-time
  • Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $1,019.88/ERC
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) water service availability charge effective October 1, 2026: $1,019.88 per ERC (equivalent residential connection), made up of water capacity ($492.67), alternative water supply ($423.99) and SJRWMD Black Creek ($103.22) charges. A nonresidential 1-inch meter is billed at 2.5 ERC; other meter sizes carry proportional ERC factors (5/8 by 3/4-inch 1.0, 1-1/2-inch 5.0, 2-inch 8.0). Not included: the meter installation charge and the $279.61 per ERC debt service charge.
    $2,549.70 one-time
Sewer$11,221.85 one-time
  • Sewer Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $4,488.74/ERC
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) wastewater connection charge effective October 1, 2026: $4,488.74 per ERC (equivalent residential connection); a nonresidential 1-inch meter is billed at 2.5 ERC, and other meter sizes carry proportional ERC factors. CCUA's schedule excludes Keystone Heights properties included in the FDEP grant-funded septic-to-sewer conversion (grants SG481030 and LP0512). Not included: the $279.61 per ERC debt service charge.
    $11,221.85 one-timeRequires confirmation
City$0.00
  • City Impact Fees (City of Keystone Heights, Commercial)
    City of Keystone Heights
    The City of Keystone Heights levies no municipal development impact fee; its code of ordinances has no impact fee, capacity fee or mobility fee provision. New commercial construction in the city pays the Clay County comprehensive impact fee, listed separately.
    $0.00
County$2.52/sq ft
  • County Comprehensive Impact Fees (City of Keystone Heights, Commercial)
    Clay County
    Clay County comprehensive impact fee for new commercial (retail and services) construction in the City of Keystone Heights: $2,520.18 per 1,000 sq ft for permit packages submitted after October 1, 2026, the sum of Government/Jails and Constitutional Facilities ($453.10), Fire and Rescue ($1,285.66) and Law Enforcement ($781.42). The schedule is adjusted each October 1. The Clay County mobility fee does not apply inside the city.
    $2.52/sq ft
  • County Mobility Fee (City of Keystone Heights, Commercial)
    Clay County
    The Clay County mobility fee does not apply in the City of Keystone Heights: Mobility Fee Ordinance 2026-8 imposes it only on new construction in unincorporated Clay County, and the city levies no mobility fee of its own.
    $0.00
Other$699.03 one-time
  • Debt Service Charge (CCUA, City of Keystone Heights)
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) charges a one-time Debt Service Charge of $279.61 per equivalent residential connection (ERC), effective October 1, 2026. The amount shown is for the standard 1-inch nonresidential meter (2.5 ERC); larger meters pay proportionally more.
    $699.03 one-time
Total (Keystone Heights): $2.52/sq ft + $14,470.58 one-time (≈ $140,479.58 at 50,000 sq ft)
Sources last checked Official fee schedules:Clay County Utility Authority (CCUA) City of Keystone Heights Clay County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clay County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Keystone Heights: Industrial Impact Fees

Industrial development in Keystone Heights pays $1.06 per square foot in impact fees, plus $14,470.58 in one-time water and sewer connection fees (rates sourced October 17, 2026).

For a 50,000 sq ft building, that comes to about $67,554.08. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $1,019.88/ERC ($2,549.70 one-time), Debt Service Charge (CCUA, City of Keystone Heights) ($699.03 one-time) and County Comprehensive Impact Fees (City of Keystone Heights, Industrial) ($1.06/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $4,488.74/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Keystone Heights Impact Fee Schedule
Water$2,549.70 one-time
  • Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $1,019.88/ERC
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) water service availability charge effective October 1, 2026: $1,019.88 per ERC (equivalent residential connection), made up of water capacity ($492.67), alternative water supply ($423.99) and SJRWMD Black Creek ($103.22) charges. A nonresidential 1-inch meter is billed at 2.5 ERC; other meter sizes carry proportional ERC factors (5/8 by 3/4-inch 1.0, 1-1/2-inch 5.0, 2-inch 8.0). Not included: the meter installation charge and the $279.61 per ERC debt service charge.
    $2,549.70 one-time
Sewer$11,221.85 one-time
  • Sewer Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $4,488.74/ERC
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) wastewater connection charge effective October 1, 2026: $4,488.74 per ERC (equivalent residential connection); a nonresidential 1-inch meter is billed at 2.5 ERC, and other meter sizes carry proportional ERC factors. CCUA's schedule excludes Keystone Heights properties included in the FDEP grant-funded septic-to-sewer conversion (grants SG481030 and LP0512). Not included: the $279.61 per ERC debt service charge.
    $11,221.85 one-timeRequires confirmation
City$0.00
  • City Impact Fees (City of Keystone Heights, Industrial)
    City of Keystone Heights
    The City of Keystone Heights levies no municipal development impact fee; its code of ordinances has no impact fee, capacity fee or mobility fee provision. New industrial construction in the city pays the Clay County comprehensive impact fee, listed separately.
    $0.00
County$1.06/sq ft
  • County Comprehensive Impact Fees (City of Keystone Heights, Industrial)
    Clay County
    Clay County comprehensive impact fee for new industrial construction in the City of Keystone Heights: $1,061.67 per 1,000 sq ft for permit packages submitted after October 1, 2026, the sum of Government/Jails and Constitutional Facilities ($130.92), Fire and Rescue ($703.69) and Law Enforcement ($227.06). The schedule is adjusted each October 1. The Clay County mobility fee does not apply inside the city.
    $1.06/sq ft
  • County Mobility Fee (City of Keystone Heights, Industrial)
    Clay County
    The Clay County mobility fee does not apply in the City of Keystone Heights: Mobility Fee Ordinance 2026-8 imposes it only on new construction in unincorporated Clay County, and the city levies no mobility fee of its own.
    $0.00
Other$699.03 one-time
  • Debt Service Charge (CCUA, City of Keystone Heights)
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) charges a one-time Debt Service Charge of $279.61 per equivalent residential connection (ERC), effective October 1, 2026. The amount shown is for the standard 1-inch nonresidential meter (2.5 ERC); larger meters pay proportionally more.
    $699.03 one-time
Total (Keystone Heights): $1.06/sq ft + $14,470.58 one-time (≈ $67,554.08 at 50,000 sq ft)
Sources last checked Official fee schedules:Clay County Utility Authority (CCUA) City of Keystone Heights Clay County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clay County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Keystone Heights: Office Impact Fees

Office development in Keystone Heights pays $3.02 per square foot in impact fees, plus $14,470.58 in one-time water and sewer connection fees (rates sourced October 17, 2026).

For a 25,000 sq ft building, that comes to about $89,851.08. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $1,019.88/ERC ($2,549.70 one-time), Debt Service Charge (CCUA, City of Keystone Heights) ($699.03 one-time) and County Comprehensive Impact Fees (City of Keystone Heights, Office) ($3.02/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $4,488.74/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Keystone Heights Impact Fee Schedule
Water$2,549.70 one-time
  • Water Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $1,019.88/ERC
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) water service availability charge effective October 1, 2026: $1,019.88 per ERC (equivalent residential connection), made up of water capacity ($492.67), alternative water supply ($423.99) and SJRWMD Black Creek ($103.22) charges. A nonresidential 1-inch meter is billed at 2.5 ERC; other meter sizes carry proportional ERC factors (5/8 by 3/4-inch 1.0, 1-1/2-inch 5.0, 2-inch 8.0). Not included: the meter installation charge and the $279.61 per ERC debt service charge.
    $2,549.70 one-time
Sewer$11,221.85 one-time
  • Sewer Connection Fee (CCUA, City of Keystone Heights) — 1" meter, 2.5 ERC × $4,488.74/ERC
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) wastewater connection charge effective October 1, 2026: $4,488.74 per ERC (equivalent residential connection); a nonresidential 1-inch meter is billed at 2.5 ERC, and other meter sizes carry proportional ERC factors. CCUA's schedule excludes Keystone Heights properties included in the FDEP grant-funded septic-to-sewer conversion (grants SG481030 and LP0512). Not included: the $279.61 per ERC debt service charge.
    $11,221.85 one-timeRequires confirmation
City$0.00
  • City Impact Fees (City of Keystone Heights, Office)
    City of Keystone Heights
    The City of Keystone Heights levies no municipal development impact fee; its code of ordinances has no impact fee, capacity fee or mobility fee provision. New office construction in the city pays the Clay County comprehensive impact fee, listed separately.
    $0.00
County$3.02/sq ft
  • County Comprehensive Impact Fees (City of Keystone Heights, Office)
    Clay County
    Clay County comprehensive impact fee for new office construction in the City of Keystone Heights: $3,015.22 per 1,000 sq ft for permit packages submitted after October 1, 2026, the sum of Government/Jails and Constitutional Facilities ($380.48), Fire and Rescue ($1,978.10) and Law Enforcement ($656.64). The schedule is adjusted each October 1. The Clay County mobility fee does not apply inside the city.
    $3.02/sq ft
  • County Mobility Fee (City of Keystone Heights, Office)
    Clay County
    The Clay County mobility fee does not apply in the City of Keystone Heights: Mobility Fee Ordinance 2026-8 imposes it only on new construction in unincorporated Clay County, and the city levies no mobility fee of its own.
    $0.00
Other$699.03 one-time
  • Debt Service Charge (CCUA, City of Keystone Heights)
    Clay County Utility Authority (CCUA)
    Clay County Utility Authority (CCUA) charges a one-time Debt Service Charge of $279.61 per equivalent residential connection (ERC), effective October 1, 2026. The amount shown is for the standard 1-inch nonresidential meter (2.5 ERC); larger meters pay proportionally more.
    $699.03 one-time
Total (Keystone Heights): $3.02/sq ft + $14,470.58 one-time (≈ $89,851.08 at 25,000 sq ft)
Sources last checked Official fee schedules:Clay County Utility Authority (CCUA) City of Keystone Heights Clay County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clay County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Keystone Heights Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Keystone Heights Impact Fee FAQs

What are the total impact fees for a single-family home in Keystone Heights, Florida?

A new single-family home in Keystone Heights pays $20,458.48 per unit in combined impact fees (rates sourced October 17, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Keystone Heights?

Commercial development in Keystone Heights pays $2.52 per square foot in impact fees, plus $14,470.58 in one-time water and sewer connection fees (assuming a 1-inch meter), about $140,479.58 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Keystone Heights charge its own impact fees?

No. Keystone Heights does not levy its own municipal impact fees. New development in Keystone Heights pays Clay County impact fees, shown on this page.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Clay County impact fees page.

Missing a jurisdiction? Get in touch.