Orange Park, Florida Impact Fees

Orange Park applies its own fee schedule: municipal fees plus the Clay County-levied fees that apply inside city limits. Combined, a new single-family home pays $14,425.98 per unit (rates sourced ). The full breakdown is below.

Orange Park Impact Fees by Project Type

Orange Park: Single-Family Impact Fees

A new single-family home in Orange Park pays $14,425.98 per unit in impact fees (rates sourced October 16, 2026). Of that, Clay County-levied fees account for $11,850.98 and municipal or utility fees for $2,575.00.

The largest line items are County Impact Fees (Town of Orange Park) ($11,850.98), Sewer Connection Fee (Town of Orange Park) ($1,325.00) and Water Connection Fee (Town of Orange Park) ($650.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Orange Park Impact Fee Schedule
Water$650.00
  • Water Connection Fee (Town of Orange Park)
    3/4 inch
    Town of Orange Park
    The Town of Orange Park charges a water meter installation charge that covers materials, labor, and the proportionate cost of water plant and distribution system. For the smallest residential service, a three-quarter-inch service with a three-quarter-inch meter, the charge is $650 where an existing service stub-out is within ten feet of the property line. Larger services cost more, and the cost of extending a water main or service line to reach the property is the applicant's.
    $650.00
Sewer$1,925.00
  • Sewer Connection Fee (Town of Orange Park)
    3/4 inch
    Town of Orange Park
    The Town of Orange Park's residential sewer connection charge is twice the water meter installation charge for the service plus a $25 inspection fee. For the smallest residential service (a three-quarter-inch service and meter, installation charge $650) that works out to $1,325 where an existing service stub-out is within ten feet of the property line. A separate water pollution control charge of $40 per fixture unit is also due at connection, and any cost of extending a sewer main or service line to reach the property is the applicant's.
    $1,325.00
  • Water Pollution Control Charge (Town of Orange Park) — 15 FU × $40/FU
    Town of Orange Park
    The Town of Orange Park charges a one-time water pollution control charge of $40 per plumbing fixture unit when a property first receives town sewer service, paid with the connection charges and deposited in the Pollution Control Trust Fund for the sewage treatment plant and pumping stations. The amount shown is for a typical single-family home of 15 fixture units; the town assigns the actual fixture unit value.
    $600.00
City$0.00
  • City Impact Fees (Town of Orange Park)
    Town of Orange Park
    The Town of Orange Park levies no municipal development impact fees. Its code contains no impact-fee chapter; the utilities chapter is the only fee chapter. Development in the town pays Clay County impact fees and the county school impact fee. The Clay County mobility fee does not apply inside the town.
    $0.00
County$11,850.98
  • County Impact Fees (Town of Orange Park)
    1,501 to 2,499 sq ft
    Clay County
    A new single-family home of 1,501 to 2,499 square feet in the Town of Orange Park pays $11,850.98 in Clay County impact fees: $1,299.98 in County Comprehensive Impact Fees for permit packages submitted after October 1, 2026 (Government/Jails & Constitutional Facilities $574.81, Regional Parks $364.12, Libraries & Cultural $361.05), plus a $10,551 School Impact Fee at the Year 4 rate effective June 1, 2026 and continuing until amended. The county Fire & Rescue fee does not apply in Orange Park (the town runs its own fire department), the Law Enforcement fee reaches only the unincorporated area, Keystone Heights and Penney Farms, and the Community Parks fee applies only in unincorporated Clay. The comprehensive fees are adjusted each October 1. The Clay County mobility fee does not apply inside the town. County impact fees are collected at electrical power clearance (the equipment-check inspection), not when the building permit is issued.
    $11,850.98
Total (Orange Park): $14,425.98
Sources last checked Official fee schedules:Town of Orange Park Clay County

Where in Clay County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orange Park: Multifamily Impact Fees

A new multifamily unit in Orange Park pays $7,958.31 per unit in impact fees (rates sourced October 16, 2026). Of that, Clay County-levied fees account for $5,583.31 and municipal or utility fees for $2,375.00.

The largest line items are County Impact Fees (Town of Orange Park, MF) ($5,583.31), Sewer Connection Fee (Town of Orange Park, MF) ($1,325.00) and Water Connection Fee (Town of Orange Park, MF) ($650.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Orange Park Impact Fee Schedule
Water$650.00
  • Water Connection Fee (Town of Orange Park, MF)
    3/4 inch
    Town of Orange Park
    The Town of Orange Park charges a water meter installation charge that covers materials, labor, and the proportionate cost of the water plant and distribution system, priced by service and meter size rather than by dwelling unit. Shown for a unit on its own three-quarter-inch service and meter ($650, where an existing service stub-out is within ten feet of the property line); a building served through one connection pays once for that connection at its size, and larger services cost more. The cost of extending a water main or service line to reach the property is the applicant's.
    $650.00
Sewer$1,725.00
  • Sewer Connection Fee (Town of Orange Park, MF)
    3/4 inch
    Town of Orange Park
    The Town of Orange Park sets its residential sewer connection charge at twice the water meter installation charge for the service, plus a $25 inspection fee, so it scales with service size rather than dwelling units. Shown for a unit on its own three-quarter-inch service ($1,325, where an existing stub-out is within ten feet of the property line); a building served through one connection pays once for that connection at its size. A separate water pollution control charge of $40 per fixture unit also applies at connection.
    $1,325.00
  • Water Pollution Control Charge (Town of Orange Park, MF) — 10 FU × $40/FU
    Town of Orange Park
    The Town of Orange Park charges a one-time water pollution control charge of $40 per plumbing fixture unit when a property first receives town sewer service, paid with the connection charges and deposited in the Pollution Control Trust Fund for the sewage treatment plant and pumping stations. The amount shown is for a typical multifamily unit of 10 fixture units; the town assigns the actual fixture unit value.
    $400.00
City$0.00
  • City Impact Fees (Town of Orange Park, MF)
    Town of Orange Park
    The Town of Orange Park levies no municipal development impact fees. Its code contains no impact-fee chapter; the utilities chapter is the only fee chapter. Multifamily development in the town pays Clay County impact fees and the county school impact fee. The Clay County mobility fee does not apply inside the town.
    $0.00
County$5,583.31
  • County Impact Fees (Town of Orange Park, MF)
    Clay County
    Each new multifamily unit in the Town of Orange Park pays $5,583.31 in Clay County impact fees: $776.31 in County Comprehensive Impact Fees for permit packages submitted after October 1, 2026 (Government/Jails & Constitutional Facilities $342.64, Regional Parks $217.86, Libraries & Cultural $215.81), plus a $4,807 per-unit School Impact Fee at the Year 4 rate effective June 1, 2026 and continuing until amended. The county Fire & Rescue, Law Enforcement and Community Parks fees do not apply in Orange Park. The comprehensive fees are adjusted each October 1. The Clay County mobility fee does not apply inside the town. County impact fees are collected at electrical power clearance (the equipment-check inspection), not when the building permit is issued.
    $5,583.31
Total (Orange Park): $7,958.31
Sources last checked Official fee schedules:Town of Orange Park Clay County

Where in Clay County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orange Park: Commercial Impact Fees

Commercial development in Orange Park pays $0.45 per square foot in impact fees, plus $3,265.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to at least $25,920.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (Town of Orange Park) — 1" meter, 2 × $1,080 + $25 inspection ($2,185.00 one-time), Water Connection Fee (Town of Orange Park) — 1" meter ($1,080.00 one-time) and County Comprehensive Impact Fees (Town of Orange Park, Commercial) ($0.45/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Pollution Control Charge (Town of Orange Park) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Orange Park Impact Fee Schedule
Water$1,080.00 one-time
  • Water Connection Fee (Town of Orange Park) — 1" meter
    Town of Orange Park
    Town of Orange Park water meter installation charge for a 1-inch service and meter: $1,080 (Town Code Section 36-26(f)), covering materials, labor and the proportionate cost of the water plant and distribution system, where a service stub-out exists within ten feet of the property line. Other sizes run from $650 (3/4-inch) to $17,600 (6-inch compound); larger services are quoted on application.
    $1,080.00 one-time
Sewer$2,185.00 one-time
  • Sewer Connection Fee (Town of Orange Park) — 1" meter, 2 × $1,080 + $25 inspection
    Town of Orange Park
    Town of Orange Park sewer connection charge for a commercial or industrial building on a 1-inch service: $2,185, two times the $1,080 water meter installation charge plus a $25 inspection fee (Town Code Section 36-26(g)), where a stub-out exists within ten feet of the property line. The charge is never less than $1,300 plus the inspection fee, and an additional waste charge may apply to high-strength or high-volume industrial waste. A separate $40 per fixture unit water pollution control charge also applies.
    $2,185.00 one-time
  • Water Pollution Control Charge (Town of Orange Park) — per fixture unit
    Town of Orange Park
    Town of Orange Park water pollution control charge: $40 per fixture unit, as the town assigns fixture unit values, paid by every property that first receives sewage collection service, at the same time as the connection charges (Town Code Section 36-26(i)). Revenue goes to the Pollution Control Trust Fund for sewage treatment plant and pumping station additions. A later change of use that adds fixture units pays $40 per added unit.
    Contact jurisdiction/utility to verify
City$0.00
  • City Impact Fees (Town of Orange Park, Commercial)
    Town of Orange Park
    The Town of Orange Park levies no municipal development impact fee; its code provides only for proportionate fair share road mitigation by agreement. New commercial construction in the town pays the Clay County comprehensive impact fee (Government/Jails component only), listed separately.
    $0.00
County$0.45/sq ft
  • County Comprehensive Impact Fees (Town of Orange Park, Commercial)
    Clay County
    Clay County comprehensive impact fee for new commercial (retail and services) construction in the Town of Orange Park: $453.10 per 1,000 sq ft for permit packages submitted after October 1, 2026, the Government/Jails and Constitutional Facilities component only; the Fire and Rescue and Law Enforcement components do not apply in the town. The schedule is adjusted each October 1. The Clay County mobility fee does not apply inside the town.
    $0.45/sq ft
  • County Mobility Fee (Town of Orange Park, Commercial)
    Clay County
    The Clay County mobility fee does not apply in the Town of Orange Park: Mobility Fee Ordinance 2026-8 imposes it only on new construction in unincorporated Clay County, and the town levies no mobility fee of its own.
    $0.00
Total (Orange Park): $0.45/sq ft + $3,265.00 one-time (≈ $25,920.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Orange Park Clay County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clay County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orange Park: Industrial Impact Fees

Industrial development in Orange Park pays $0.13 per square foot in impact fees, plus $3,265.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 50,000 sq ft building, that comes to at least $9,811.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (Town of Orange Park) — 1" meter, 2 × $1,080 + $25 inspection ($2,185.00 one-time), Water Connection Fee (Town of Orange Park) — 1" meter ($1,080.00 one-time) and County Comprehensive Impact Fees (Town of Orange Park, Industrial) ($0.13/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Pollution Control Charge (Town of Orange Park) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Orange Park Impact Fee Schedule
Water$1,080.00 one-time
  • Water Connection Fee (Town of Orange Park) — 1" meter
    Town of Orange Park
    Town of Orange Park water meter installation charge for a 1-inch service and meter: $1,080 (Town Code Section 36-26(f)), covering materials, labor and the proportionate cost of the water plant and distribution system, where a service stub-out exists within ten feet of the property line. Other sizes run from $650 (3/4-inch) to $17,600 (6-inch compound); larger services are quoted on application.
    $1,080.00 one-time
Sewer$2,185.00 one-time
  • Sewer Connection Fee (Town of Orange Park) — 1" meter, 2 × $1,080 + $25 inspection
    Town of Orange Park
    Town of Orange Park sewer connection charge for a commercial or industrial building on a 1-inch service: $2,185, two times the $1,080 water meter installation charge plus a $25 inspection fee (Town Code Section 36-26(g)), where a stub-out exists within ten feet of the property line. The charge is never less than $1,300 plus the inspection fee, and an additional waste charge may apply to high-strength or high-volume industrial waste. A separate $40 per fixture unit water pollution control charge also applies.
    $2,185.00 one-time
  • Water Pollution Control Charge (Town of Orange Park) — per fixture unit
    Town of Orange Park
    Town of Orange Park water pollution control charge: $40 per fixture unit, as the town assigns fixture unit values, paid by every property that first receives sewage collection service, at the same time as the connection charges (Town Code Section 36-26(i)). Revenue goes to the Pollution Control Trust Fund for sewage treatment plant and pumping station additions. A later change of use that adds fixture units pays $40 per added unit.
    Contact jurisdiction/utility to verify
City$0.00
  • City Impact Fees (Town of Orange Park, Industrial)
    Town of Orange Park
    The Town of Orange Park levies no municipal development impact fee; its code provides only for proportionate fair share road mitigation by agreement. New industrial construction in the town pays the Clay County comprehensive impact fee (Government/Jails component only), listed separately.
    $0.00
County$0.13/sq ft
  • County Comprehensive Impact Fees (Town of Orange Park, Industrial)
    Clay County
    Clay County comprehensive impact fee for new industrial construction in the Town of Orange Park: $130.92 per 1,000 sq ft for permit packages submitted after October 1, 2026, the Government/Jails and Constitutional Facilities component only; the Fire and Rescue and Law Enforcement components do not apply in the town. The schedule is adjusted each October 1. The Clay County mobility fee does not apply inside the town.
    $0.13/sq ft
  • County Mobility Fee (Town of Orange Park, Industrial)
    Clay County
    The Clay County mobility fee does not apply in the Town of Orange Park: Mobility Fee Ordinance 2026-8 imposes it only on new construction in unincorporated Clay County, and the town levies no mobility fee of its own.
    $0.00
Total (Orange Park): $0.13/sq ft + $3,265.00 one-time (≈ $9,811.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Orange Park Clay County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clay County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orange Park: Office Impact Fees

Office development in Orange Park pays $0.38 per square foot in impact fees, plus $3,265.00 in one-time water and sewer connection fees (rates sourced October 16, 2026).

For a 25,000 sq ft building, that comes to at least $12,777.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection Fee (Town of Orange Park) — 1" meter, 2 × $1,080 + $25 inspection ($2,185.00 one-time), Water Connection Fee (Town of Orange Park) — 1" meter ($1,080.00 one-time) and County Comprehensive Impact Fees (Town of Orange Park, Office) ($0.38/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Pollution Control Charge (Town of Orange Park) — per fixture unit is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Orange Park Impact Fee Schedule
Water$1,080.00 one-time
  • Water Connection Fee (Town of Orange Park) — 1" meter
    Town of Orange Park
    Town of Orange Park water meter installation charge for a 1-inch service and meter: $1,080 (Town Code Section 36-26(f)), covering materials, labor and the proportionate cost of the water plant and distribution system, where a service stub-out exists within ten feet of the property line. Other sizes run from $650 (3/4-inch) to $17,600 (6-inch compound); larger services are quoted on application.
    $1,080.00 one-time
Sewer$2,185.00 one-time
  • Sewer Connection Fee (Town of Orange Park) — 1" meter, 2 × $1,080 + $25 inspection
    Town of Orange Park
    Town of Orange Park sewer connection charge for a commercial or industrial building on a 1-inch service: $2,185, two times the $1,080 water meter installation charge plus a $25 inspection fee (Town Code Section 36-26(g)), where a stub-out exists within ten feet of the property line. The charge is never less than $1,300 plus the inspection fee, and an additional waste charge may apply to high-strength or high-volume industrial waste. A separate $40 per fixture unit water pollution control charge also applies.
    $2,185.00 one-time
  • Water Pollution Control Charge (Town of Orange Park) — per fixture unit
    Town of Orange Park
    Town of Orange Park water pollution control charge: $40 per fixture unit, as the town assigns fixture unit values, paid by every property that first receives sewage collection service, at the same time as the connection charges (Town Code Section 36-26(i)). Revenue goes to the Pollution Control Trust Fund for sewage treatment plant and pumping station additions. A later change of use that adds fixture units pays $40 per added unit.
    Contact jurisdiction/utility to verify
City$0.00
  • City Impact Fees (Town of Orange Park, Office)
    Town of Orange Park
    The Town of Orange Park levies no municipal development impact fee; its code provides only for proportionate fair share road mitigation by agreement. New office construction in the town pays the Clay County comprehensive impact fee (Government/Jails component only), listed separately.
    $0.00
County$0.38/sq ft
  • County Comprehensive Impact Fees (Town of Orange Park, Office)
    Clay County
    Clay County comprehensive impact fee for new office construction in the Town of Orange Park: $380.48 per 1,000 sq ft for permit packages submitted after October 1, 2026, the Government/Jails and Constitutional Facilities component only; the Fire and Rescue and Law Enforcement components do not apply in the town. The schedule is adjusted each October 1. The Clay County mobility fee does not apply inside the town.
    $0.38/sq ft
  • County Mobility Fee (Town of Orange Park, Office)
    Clay County
    The Clay County mobility fee does not apply in the Town of Orange Park: Mobility Fee Ordinance 2026-8 imposes it only on new construction in unincorporated Clay County, and the town levies no mobility fee of its own.
    $0.00
Total (Orange Park): $0.38/sq ft + $3,265.00 one-time (≈ $12,777.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Orange Park Clay County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clay County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orange Park Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Orange Park Impact Fee FAQs

What are the total impact fees for a single-family home in Orange Park, Florida?

A new single-family home in Orange Park pays $14,425.98 per unit in combined impact fees (rates sourced October 16, 2026).

How much are commercial impact fees in Orange Park?

Commercial development in Orange Park pays $0.45 per square foot in impact fees, plus $3,265.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $25,920.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Orange Park charge its own impact fees?

Yes. Orange Park levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Orange Park, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Clay County impact fees page.

Missing a jurisdiction? Get in touch.