Orange Park, Florida Impact Fees

Orange Park applies its own fee schedule: municipal fees plus the Clay County-levied fees that apply inside city limits. Combined, a new single-family home pays $13,797.00 per unit (rates sourced August 5, 2026). The full breakdown is below.

Orange Park impact fees by project type

Orange Park: Single-Family Impact Fees

A new single-family home in Orange Park pays $13,797.00 per unit in impact fees (rates sourced August 5, 2026). Of that, Clay County-levied fees account for $11,822.00 and municipal or utility fees for $1,975.00.

The largest line items are County Impact Fees (Town of Orange Park) ($11,822.00), Sewer Connection Fee (Town of Orange Park) ($1,325.00) and Water Connection Fee (Town of Orange Park) ($650.00).

View the full fee schedule
Water$650.00
  • Water Connection Fee (Town of Orange Park)
    Town of Orange Park
    Internal research note: Orange Park Town Code sec. 36-26(f), 'Water meter installation charges,' which the code states 'consist of cost of materials, labor, and the proportionate cost of water plant and distribution system' — i.e., this is the town's water connection charge. Three-fourths-inch service, three-fourths-inch meter = $650.00; 1-inch $1,080; 1.5-inch $1,500; 2-inch $3,000; 3-inch $4,570; 4-inch $7,920; 6-inch $17,600; larger quoted on application. The schedule assumes an existing service stub-out within ten feet of the property line; main or service-line extension is at the applicant's expense. Code current through Ord. No. 16-25 adopted 10/21/2025 (Municode Supp. 11, job 481049). 8/5/2026
    $650.00
Sewer$1,325.00
  • Sewer Connection Fee (Town of Orange Park)
    Town of Orange Park
    Internal research note: Orange Park Town Code sec. 36-26(g)(1): 'Residential. The connection charge shall be two times the amount of the water meter installation charge where there is an existing service stub-out within ten feet or less of the property line, plus $25.00 to cover inspection by the town.' Sec. 36-26(f)(1) sets the three-fourths-inch service / three-fourths-inch meter installation charge at $650.00. 2 x $650 + $25 = $1,325.00 for the smallest residential service. Code is current — Municode job 481049, Supp. 11, codified through Ord. No. 16-25 adopted 10/21/2025. Sec. 36-26(i) additionally imposes a water pollution control charge of $40.00 per fixture unit payable at the same time as connection charges; that is a separately named charge and is disclosed in the public note rather than folded into the amount. Monthly rates on the town's Water & Sewer Rates page were amended by resolution effective 5/1/2026, but the connection charges remain as codified. 8/5/2026
    $1,325.00
City$0.00
  • City Impact Fees (Town of Orange Park)
    Town of Orange Park
    Town of Orange Park levies no municipal development impact fees — the code has no impact-fee chapter; Ch. 36 (utilities) is the only fee chapter. Development pays Clay County impact fees and the county school fee. Confirmed $0 (not a gap). Source: library.municode.com/fl/orange_park.
    $0.00
County$11,822.00
  • County Impact Fees (Town of Orange Park)
    Clay County
    County Comprehensive Impact Fees, schedule rev. 10/1/2025 (current). 3 of 5 code categories apply in Orange Park: Gov/Jails & Constitutional $562 + Regional Parks $356 + Libraries & Cultural $353 = $1,271. Fire & Rescue does not apply — Sec. 16-167 reaches only the unincorporated area plus Green Cove Springs, Keystone Heights and Penney Farms (Orange Park has its own fire dept). Law Enforcement does not apply — Sec. 16-177 reaches only unincorporated plus Keystone Heights and Penney Farms (Orange Park has its own PD). Community Parks is unincorporated-only. School Impact Fee Year 4, Ord. 2023-24, eff. 6/1/2026 until amended: $10,551. Total $11,822. County mobility does not apply: Ord. 2026-8 (eff. 6/15/2026) imposes it only in the unincorporated area (Ch. 16 Art. VI has no municipal-participation section). County fees are collected at electrical power clearance, not permit issuance (Ord. 2026-8 Sec. 2.04.A; Code Sec. 16-157 et seq.). Sec. 16-146 makes Art. VII enforceable inside a municipality only under an interlocal with the county. Sources: claycountygov.com County Comprehensive Impact Fee schedule rev. 10/1/2025; Municode Clay County Code Ch. 16 Art. VII; Clay County Ordinance 2026-8.
    $11,822.00
Total (Orange Park): $13,797.00
Sources last checked August 5, 2026Official fee schedules:Town of Orange Park Clay County

Where in Clay County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orange Park: Multifamily Impact Fees

A new multifamily unit in Orange Park pays $5,566.00 per unit in impact fees (rates sourced August 5, 2026). All of it is levied by Clay County.

The largest line items are County Impact Fees (Town of Orange Park, MF) ($5,566.00).

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Orange Park, MF)
    Town of Orange Park
    Internal research note: Orange Park Town Code sec. 36-26(f) publishes the town's water meter installation (connection) charges strictly by service and meter size — 3/4 inch $650, 1 inch $1,080, 1.5 inch $1,500, 2 inch $3,000, 3 inch $4,570, 4 inch $7,920, 6 inch $17,600, larger quoted on application. There is no per-dwelling-unit or per-ERU multifamily connection rate in the code. The town's rate Schedule 2 does count each apartment unit as a separate 'service' for monthly billing, but that applies to monthly minimum and usage charges only, not to the one-time installation charge. Code current through Ord. No. 16-25 adopted 10/21/2025. Meets the MF meter-size-only rule with the basis affirmatively published. 8/5/2026
    $0.00
Sewer$0.00
  • Sewer Connection Fee (Town of Orange Park, MF)
    Town of Orange Park
    Internal research note: Orange Park Town Code sec. 36-26(g) prices the sewer connection charge as two times the water meter installation charge plus a $25 inspection fee, and sec. 36-26(f) prices meter installation strictly by service and meter size ($650 for 3/4-inch up to $17,600 for 6-inch). The charge therefore scales with meter size, not with the number of dwelling units, and the code publishes no per-unit or per-ERU multifamily connection rate. The only per-unit multifamily figure in the section, $14.00 in sec. 36-26(h)(2), is a building permit application fee for privately built systems where town service is not available, not a connection charge. The town's Water & Sewer Rates page publishes monthly rates only. Meets the MF meter-size-only rule with the basis affirmatively published. 8/5/2026
    $0.00
City$0.00
  • City Impact Fees (Town of Orange Park, MF)
    Town of Orange Park
    Town of Orange Park levies no municipal development impact fees — no impact-fee chapter in the code; Ch. 36 (utilities) is the only fee chapter. MF development pays Clay County impact fees and the county school fee. Confirmed $0 (not a gap).
    $0.00
County$5,566.00
  • County Impact Fees (Town of Orange Park, MF)
    Clay County
    County Comprehensive Impact Fees, rev. 10/1/2025 (current), multi-family column. 3 of 5 categories apply in Orange Park: Gov/Jails & Constitutional $335 + Regional Parks $213 + Libraries & Cultural $211 = $759. Fire & Rescue does not apply (Sec. 16-167 reaches only unincorporated + GCS + Keystone Heights + Penney Farms; Orange Park has its own fire dept); Law Enforcement does not apply (Sec. 16-177 reaches only unincorporated + Keystone Heights + Penney Farms). Community Parks is unincorporated-only. School Impact Fee Year 4, Ord. 2023-24, eff. 6/1/2026 until amended: $4,807/unit. Total $5,566/unit. County mobility does not apply: Ord. 2026-8 imposes it only in the unincorporated area. Collection at electrical power clearance. Sec. 16-146 requires an interlocal for county enforcement inside a municipality. Sources: claycountygov.com Comprehensive Impact Fee schedule rev. 10/1/2025; Municode Clay County Code Ch. 16 Art. VII; Clay County Ordinance 2026-8.
    $5,566.00
Total (Orange Park): $5,566.00
Sources last checked August 5, 2026Official fee schedules:Town of Orange Park Clay County

Where in Clay County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orange Park: Commercial Impact Fees

Commercial development in Orange Park pays $0.44 per square foot in impact fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to at least $22,150.00. The calculator below adjusts to your exact square footage.

The largest line items are County Comprehensive Impact Fees (Town of Orange Park, Commercial) ($0.44/sq ft).

Sewer Connection Fee (Town of Orange Park) and Water Connection Fee (Town of Orange Park) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Orange Park)
    Town of Orange Park
    UNCONFIRMED $0. Town of Orange Park runs its own water utility. Re-checked 7/12/2026: the Town's Water & Sewer Rates page (rates eff. 5/1/2026) publishes ONLY monthly base/usage rates, a $50 administrative fee and a $275 deposit; its 'Commercial Rate Information' section likewise lists only monthly base/usage rates for the typical 3/4" commercial meter and refers larger meters to Utility Billing. Deposits and admin fees are not impact fees. Municode Ch. 36 Art. II (Water and Sewer System) contains no connection-charge schedule — Sec. 36-26 leaves rates and charges to be set by Council. No one-time capital connection/capacity fee identified in any published source for any customer class. Confirm whether one exists for commercial → Utility Billing 904-278-3016 (or 904-264-9565 opt. 2).
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Orange Park)
    Town of Orange Park
    UNCONFIRMED $0. Same finding as water. Town of Orange Park runs its own sewer utility; the Water & Sewer Rates page (eff. 5/1/2026) posts only monthly base/usage rates plus a $50 admin fee and $275 deposit, including in its Commercial Rate Information section. Municode Ch. 36 Art. II has no sewer connection-charge schedule (Sec. 36-26 defers rates/charges to Council). No one-time capital sewer connection fee identified for any customer class. Confirm → Utility Billing 904-278-3016.
    Requires confirmation
City$0.00
  • City Impact Fees (Town of Orange Park, Commercial)
    Town of Orange Park
    Confirmed $0 — not an unverified placeholder. Town of Orange Park levies no municipal development impact fees, residential or nonresidential. Full Municode chapter list reviewed; no impact-fee chapter (Ch. 36 covers utilities only). Development in the town is subject to Clay County comprehensive impact fees and the county mobility fee (separate County records).
    $0.00
County$0.44/sq ft
  • County Comprehensive Impact Fees (Town of Orange Park, Commercial)
    Clay County
    Clay County Comprehensive Impact Fees, permits submitted after 10/1/2025. Schedule row: 'Commercial: Retail and Services', per 1,000 sq ft. Only ONE category applies in Orange Park: Government Jails & Constitutional Facilities $443 (countywide, footnote 1). Fire & Rescue $1,257 is expressly EXCLUDED in Orange Park (footnote 2: applicable in unincorporated areas and all cities except the Town of Orange Park). Law Enforcement excluded (footnote 3). Parks/Libraries $0 for nonres. School impact fees do not apply to nonresidential.
    $0.44/sq ft
  • County Mobility Fee (Town of Orange Park, Commercial)
    Clay County
    CONFIRMED $0 — the Clay County Mobility Fee does NOT apply inside municipal limits. Clay County Mobility Fee Ordinance (2026 restatement, eff. 6/15/2026), Sec. 2.01.A (Imposition): 'All New Construction occurring within the unincorporated area of the County shall pay the applicable Mobility Fee established in this Ordinance.' Sec. 3.06 (Applicability) repeats the unincorporated-area limit. The ordinance contains NO interlocal agreement or municipal opt-in provision, and 'County Transportation System' expressly excludes roads within a City Street System. Orange Park levies no municipal mobility or impact fee of its own (full Municode chapter list reviewed; Ch. 36 is utilities only). CORRECTED ON AUDIT 2026-07-12: this record previously carried the Orange Park, Lakeside & Fleming Island DISTRICT rate ($3,162/1,000 sq ft, ITE 820), entered in error — the district rate governs the surrounding unincorporated area, not the town. County Comprehensive Impact Fees DO apply in Orange Park (separate County record). Contact: Planning & Zoning 904-269-6300.
    $0.00
Total (Orange Park): $0.44/sq ft (≈ $22,150.00 at 50,000 sq ft)
Sources last checked August 5, 2026Official fee schedules:Town of Orange Park Clay County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Clay County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orange Park: Industrial Impact Fees

Industrial development in Orange Park pays $0.13 per square foot in impact fees (rates sourced August 5, 2026).

For a 50,000 sq ft building, that comes to at least $6,400.00. The calculator below adjusts to your exact square footage.

The largest line items are County Comprehensive Impact Fees (Town of Orange Park, Industrial) ($0.13/sq ft).

Sewer Connection Fee (Town of Orange Park) and Water Connection Fee (Town of Orange Park) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Orange Park)
    Town of Orange Park
    UNCONFIRMED $0. Town of Orange Park runs its own water utility. Re-checked 7/12/2026: the Town's Water & Sewer Rates page (rates eff. 5/1/2026) publishes ONLY monthly base/usage rates, a $50 administrative fee and a $275 deposit; its 'Commercial Rate Information' section likewise lists only monthly base/usage rates for the typical 3/4" commercial meter and refers larger meters to Utility Billing. Deposits and admin fees are not impact fees. Municode Ch. 36 Art. II (Water and Sewer System) contains no connection-charge schedule — Sec. 36-26 leaves rates and charges to be set by Council. No one-time capital connection/capacity fee identified in any published source for any customer class. Confirm whether one exists for commercial → Utility Billing 904-278-3016 (or 904-264-9565 opt. 2).
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Orange Park)
    Town of Orange Park
    UNCONFIRMED $0. Same finding as water. Town of Orange Park runs its own sewer utility; the Water & Sewer Rates page (eff. 5/1/2026) posts only monthly base/usage rates plus a $50 admin fee and $275 deposit, including in its Commercial Rate Information section. Municode Ch. 36 Art. II has no sewer connection-charge schedule (Sec. 36-26 defers rates/charges to Council). No one-time capital sewer connection fee identified for any customer class. Confirm → Utility Billing 904-278-3016.
    Requires confirmation
City$0.00
County$0.13/sq ft
  • County Comprehensive Impact Fees (Town of Orange Park, Industrial)
    Clay County
    Clay County Comprehensive Impact Fees, after 10/1/2025. Schedule row: 'Industrial', per 1,000 sq ft. Only Gov Jails $128 applies in Orange Park; Fire & Rescue excluded (footnote 2), Law Enforcement excluded (footnote 3). Parks/Libraries $0 for nonres.
    $0.13/sq ft
  • County Mobility Fee (Town of Orange Park, Industrial)
    Clay County
    CONFIRMED $0 — the Clay County Mobility Fee does NOT apply inside municipal limits. Mobility Fee Ordinance (2026 restatement, eff. 6/15/2026), Sec. 2.01.A + Sec. 3.06: the fee reaches only New Construction 'within the unincorporated area of the County'. No interlocal/municipal opt-in provision; 'County Transportation System' excludes City Street System roads. Orange Park levies no municipal mobility/impact fee. CORRECTED ON AUDIT 2026-07-12: previously held the Orange Park, Lakeside & Fleming Island DISTRICT rate ($500/1,000 sq ft, ITE 140 Manufacturing), entered in error. County Comprehensive Impact Fees DO apply here (separate County record). Contact: Planning & Zoning 904-269-6300.
    $0.00
Total (Orange Park): $0.13/sq ft (≈ $6,400.00 at 50,000 sq ft)
Sources last checked August 5, 2026Official fee schedules:Town of Orange Park Clay County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Clay County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Orange Park: Office Impact Fees

Office development in Orange Park pays $0.37 per square foot in impact fees (rates sourced August 5, 2026).

For a 25,000 sq ft building, that comes to at least $9,300.00. The calculator below adjusts to your exact square footage.

The largest line items are County Comprehensive Impact Fees (Town of Orange Park, Office) ($0.37/sq ft).

Sewer Connection Fee (Town of Orange Park) and Water Connection Fee (Town of Orange Park) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Orange Park)
    Town of Orange Park
    UNCONFIRMED $0. Town of Orange Park runs its own water utility. Re-checked 7/12/2026: the Town's Water & Sewer Rates page (rates eff. 5/1/2026) publishes ONLY monthly base/usage rates, a $50 administrative fee and a $275 deposit; its 'Commercial Rate Information' section likewise lists only monthly base/usage rates for the typical 3/4" commercial meter and refers larger meters to Utility Billing. Deposits and admin fees are not impact fees. Municode Ch. 36 Art. II (Water and Sewer System) contains no connection-charge schedule — Sec. 36-26 leaves rates and charges to be set by Council. No one-time capital connection/capacity fee identified in any published source for any customer class. Confirm whether one exists for commercial → Utility Billing 904-278-3016 (or 904-264-9565 opt. 2).
    Requires confirmation
Sewer$0.00
  • Sewer Connection Fee (Town of Orange Park)
    Town of Orange Park
    UNCONFIRMED $0. Same finding as water. Town of Orange Park runs its own sewer utility; the Water & Sewer Rates page (eff. 5/1/2026) posts only monthly base/usage rates plus a $50 admin fee and $275 deposit, including in its Commercial Rate Information section. Municode Ch. 36 Art. II has no sewer connection-charge schedule (Sec. 36-26 defers rates/charges to Council). No one-time capital sewer connection fee identified for any customer class. Confirm → Utility Billing 904-278-3016.
    Requires confirmation
City$0.00
County$0.37/sq ft
  • County Comprehensive Impact Fees (Town of Orange Park, Office)
    Clay County
    Clay County Comprehensive Impact Fees, after 10/1/2025. Schedule row: 'Office', per 1,000 sq ft. Only Gov Jails $372 applies in Orange Park; Fire & Rescue excluded (footnote 2), Law Enforcement excluded (footnote 3). Parks/Libraries $0 for nonres.
    $0.37/sq ft
  • County Mobility Fee (Town of Orange Park, Office)
    Clay County
    CONFIRMED $0 — the Clay County Mobility Fee does NOT apply inside municipal limits. Mobility Fee Ordinance (2026 restatement, eff. 6/15/2026), Sec. 2.01.A + Sec. 3.06: fee reaches only New Construction 'within the unincorporated area of the County'. No interlocal/municipal opt-in provision; 'County Transportation System' excludes City Street System roads. Orange Park levies no municipal mobility/impact fee of its own. CORRECTED ON AUDIT 2026-07-12: previously held the Orange Park, Lakeside & Fleming Island DISTRICT rate ($1,236/1,000 sq ft, ITE 710 General Office), entered in error. County Comprehensive Impact Fees DO apply here (separate County record). Contact: Planning & Zoning 904-269-6300.
    $0.00
Total (Orange Park): $0.37/sq ft (≈ $9,300.00 at 25,000 sq ft)
Sources last checked August 5, 2026Official fee schedules:Town of Orange Park Clay County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Clay County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Orange Park

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Orange Park, Florida?

A new single-family home in Orange Park pays $13,797.00 per unit in combined impact fees (rates sourced August 5, 2026).

How much are commercial impact fees in Orange Park?

Commercial development in Orange Park pays $0.44 per square foot in impact fees, at least $22,150.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Orange Park charge its own impact fees?

Yes. Orange Park levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Orange Park, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Clay County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000