Penney Farms, Florida Impact Fees

Penney Farms applies its own fee schedule: municipal fees plus the Clay County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $25,986.34 per unit (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Penney Farms impact fees by project type

Penney Farms: Single-Family Impact Fees

A new single-family home in Penney Farms pays at least $25,986.34 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Clay County.

The largest line items are Sewer Connection Fee (CCUA, Town of Penney Farms) ($4,345.34).

County Impact Fees (Town of Penney Farms) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Fee (Town of Penney Farms) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Penney Farms)
    Town of Penney Farms
    Town of Penney Farms operates its own water utility (PWS ID 210-1019) — CCUA supplies wastewater only. One-time water connection/tap fee is set by Town Council and is not posted online (no Municode listing, no fee schedule on the town site). Re-checked 7/11/2026, still not published. Contact: Josh Young (Water System Operator) 904-838-0277 or Town Hall 904-529-9078.
    Requires confirmation
Sewer$4,345.34
  • Sewer Connection Fee (CCUA, Town of Penney Farms)
    Clay County Utility Authority (CCUA)
    CONFIRMED 7/11/2026. CCUA provides wastewater to Penney Farms. Wastewater Connection Charge Per ERC = $4,345.34 (eff. 10/01/2025); the schedule's exclusion applies to Keystone Heights only, so the full charge applies here. SFR = 1.0 ERC. Source: clayutility.org Service Charges and Miscellaneous Fees. Contact 904-272-5999.
    $4,345.34
City$0.00
  • City Impact Fees (Town of Penney Farms)
    Town of Penney Farms
    Confirmed $0. Town of Penney Farms (~600 pop.) levies no municipal development impact fees. No Municode listing; no city impact-fee program identified.
    $0.00
County$21,641.00
  • County Impact Fees (Town of Penney Farms)
    Clay County
    County Comprehensive Impact Fees rev. 10/1/2025 (CONFIRMED still operative 7/11/2026) — 5 categories apply (Law Enforcement per footnote 3): Gov Jails $562 + Fire $1,278 + Law Enf $968 + Regional Parks $356 + Libraries $353 = $3,517. Community Parks N/A. School Year 4 (eff. 6/1/2026): $10,551. Mobility: Penney Farms ASSUMED to sit in the Lake Asbury & Green Cove Springs district ($7,573 SFR) on proximity — ⚠️ district assignment UNVERIFIED and this is the SUPERSEDED 2025 rate. Clay's 2026 mobility ordinance + district maps/rate schedules took effect JUNE 15, 2026 and the district boundaries themselves were redrawn; the 2026 PDFs are image-only and unreadable by fetch, Chrome plugin, or Google Docs viewer. Stored total $21,641 is therefore doubly uncertain on the mobility component. Confirm district + 2026 rate → Planning & Zoning 904-269-6300.
    $21,641.00Requires confirmation
Total (Penney Farms): $25,986.34
Sources last checked July 12, 2026Official fee schedules:Clay County Utility Authority (CCUA) Clay County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Clay County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Penney Farms: Multifamily Impact Fees

A new multifamily unit in Penney Farms pays at least $18,346.34 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Clay County.

County Impact Fees (Town of Penney Farms, MF) and Sewer Connection Fee (CCUA, Town of Penney Farms, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Connection Fee (Town of Penney Farms, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Penney Farms, MF)
    Town of Penney Farms
    Town of Penney Farms operates its own water utility (PWS ID 210-1019); CCUA supplies wastewater only. One-time water connection/tap fee set by Town Council, not posted online. Re-checked 7/11/2026, still unpublished. MF per-unit basis also unknown. Contact: Josh Young (Water System Operator) 904-838-0277 / Town Hall 904-529-9078.
    Requires confirmation
Sewer$4,345.34
  • Sewer Connection Fee (CCUA, Town of Penney Farms, MF)
    Clay County Utility Authority (CCUA)
    Rate CONFIRMED 7/11/2026: CCUA Wastewater Connection Charge Per ERC = $4,345.34 (eff. 10/01/2025); the Keystone exclusion does not apply here, so the full charge is levied in Penney Farms. Entered at 1.0 ERC/unit. ⚠️ Still Unconfirmed: per-MF-unit ERC factor → CCUA Development Services 904-272-5999.
    $4,345.34Requires confirmation
City$0.00
  • City Impact Fees (Town of Penney Farms, MF)
    Town of Penney Farms
    Confirmed $0. Town of Penney Farms (~600 pop.) levies no municipal development impact fees. No Municode listing; no city impact-fee program identified.
    $0.00
County$14,001.00
  • County Impact Fees (Town of Penney Farms, MF)
    Clay County
    County Comprehensive Impact Fees rev. 10/1/2025 (CONFIRMED still operative 7/11/2026), MF column — 5 categories (Law Enforcement per footnote 3): Gov Jails $335 + Fire $761 + Law Enf $577 + Regional Parks $213 + Libraries $211 = $2,097. Community Parks N/A. School Year 4 (eff. 6/1/2026): $4,807. Mobility: Penney Farms ASSUMED in the Lake Asbury & Green Cove Springs district ($7,097 MF) on proximity — ⚠️ district assignment UNVERIFIED and this is the SUPERSEDED 2025 rate. Clay's 2026 mobility ordinance, district MAP, and rate schedules all took effect JUNE 15, 2026 (boundaries redrawn); the 2026 PDFs are image-only and unreadable. Stored total $14,001 is doubly uncertain on mobility. Confirm district + 2026 rate → Planning & Zoning 904-269-6300.
    $14,001.00Requires confirmation
Total (Penney Farms): $18,346.34
Sources last checked July 12, 2026Official fee schedules:Clay County Utility Authority (CCUA) Clay County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Clay County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Penney Farms: Commercial Impact Fees

Commercial development in Penney Farms pays $2.46 per square foot in impact fees, plus $10,863.35 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $134,063.35. The calculator below adjusts to your exact square footage.

The largest line items are County Comprehensive Impact Fees (Town of Penney Farms, Commercial) ($2.46/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (CCUA, Town of Penney Farms) — 1" meter, 2.5 ERC × $4,345.34/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Fee (Town of Penney Farms) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Penney Farms)
    Town of Penney Farms
    UNCONFIRMED $0. Town of Penney Farms operates its own water utility (PWS ID 210-1019); CCUA supplies wastewater only. The one-time water connection/tap fee is set by Town Council and is not posted online — no Municode listing, no fee schedule on the town site, and no separate commercial schedule. Re-checked 7/12/2026, still not published. Contact: Josh Young (Water System Operator) 904-838-0277 or Town Hall 904-529-9078.
    Requires confirmation
Sewer$10,863.35 one-time
  • Sewer Connection Fee (CCUA, Town of Penney Farms) — 1" meter, 2.5 ERC × $4,345.34/ERC
    Clay County Utility Authority (CCUA)
    CCUA provides wastewater to Penney Farms (the Town runs water itself). CCUA Wastewater Connection Charge = $4,345.34 per ERC (Service Availability Charges eff. 10/01/2025); the schedule's exclusion applies to Keystone Heights only, so the full charge applies here. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder on its Commercial Rates page (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), whose base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Debt Service Charge $246.79/ERC not included.
    $10,863.35 one-timeRequires confirmation
City$0.00
  • City Impact Fees (Town of Penney Farms, Commercial)
    Town of Penney Farms
    Confirmed $0 — not an unverified placeholder. Town of Penney Farms (pop. ~800) levies no municipal development impact fees, residential or nonresidential. No Municode listing; no impact-fee program or fee schedule identified on the town site. Development is subject to Clay County comprehensive impact fees and the county mobility fee (separate County records).
    $0.00
County$2.46/sq ft
  • County Comprehensive Impact Fees (Town of Penney Farms, Commercial)
    Clay County
    Clay County Comprehensive Impact Fees, permits submitted after 10/1/2025. Schedule row: 'Commercial: Retail and Services', per 1,000 sq ft. Applicable in Penney Farms: Gov Jails $443 (countywide, footnote 1) + Fire & Rescue $1,257 (footnote 2 — all cities except Orange Park) + Law Enforcement $764 (footnote 3 — unincorporated + Keystone Heights + Penney Farms, which names this town expressly) = $2,464. Community Parks (footnote 4, unincorporated only), Regional Parks and Libraries are $0 for all nonres rows. School impact fees do not apply to nonresidential.
    $2.46/sq ft
  • County Mobility Fee (Town of Penney Farms, Commercial)
    Clay County
    CONFIRMED $0 — the Clay County Mobility Fee does NOT apply inside municipal limits. Clay County Mobility Fee Ordinance (2026 restatement, eff. 6/15/2026), Sec. 2.01.A (Imposition): 'All New Construction occurring within the unincorporated area of the County shall pay the applicable Mobility Fee established in this Ordinance.' Sec. 3.06 (Applicability) repeats the unincorporated-area limit. The ordinance contains NO interlocal agreement or municipal opt-in provision, and 'County Transportation System' expressly excludes roads within a City Street System. Penney Farms levies no municipal mobility or impact fee of its own. CORRECTED ON AUDIT 2026-07-12: this record previously carried an ASSUMED Lake Asbury & Green Cove Springs DISTRICT rate ($20,131/1,000 sq ft, ITE 820) — both the district assignment and the rate were erroneous, since no county mobility fee is levied inside the town at all. This also retires the open 'district assignment assumed' question for Penney Farms. County Comprehensive Impact Fees DO apply here (separate County record). Contact: Planning & Zoning 904-269-6300.
    $0.00
Total (Penney Farms): $2.46/sq ft + $10,863.35 one-time (≈ $134,063.35 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Town of Penney Farms Clay County Utility Authority (CCUA) Clay County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clay County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Penney Farms: Industrial Impact Fees

Industrial development in Penney Farms pays $1.04 per square foot in impact fees, plus $10,863.35 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $62,763.35. The calculator below adjusts to your exact square footage.

The largest line items are County Comprehensive Impact Fees (Town of Penney Farms, Industrial) ($1.04/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (CCUA, Town of Penney Farms) — 1" meter, 2.5 ERC × $4,345.34/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Fee (Town of Penney Farms) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Penney Farms)
    Town of Penney Farms
    UNCONFIRMED $0. Town of Penney Farms operates its own water utility (PWS ID 210-1019); CCUA supplies wastewater only. The one-time water connection/tap fee is set by Town Council and is not posted online — no Municode listing, no fee schedule on the town site, and no separate commercial schedule. Re-checked 7/12/2026, still not published. Contact: Josh Young (Water System Operator) 904-838-0277 or Town Hall 904-529-9078.
    Requires confirmation
Sewer$10,863.35 one-time
  • Sewer Connection Fee (CCUA, Town of Penney Farms) — 1" meter, 2.5 ERC × $4,345.34/ERC
    Clay County Utility Authority (CCUA)
    CCUA provides wastewater to Penney Farms (the Town runs water itself). CCUA Wastewater Connection Charge = $4,345.34 per ERC (Service Availability Charges eff. 10/01/2025); the schedule's exclusion applies to Keystone Heights only, so the full charge applies here. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder on its Commercial Rates page (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), whose base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Debt Service Charge $246.79/ERC not included.
    $10,863.35 one-timeRequires confirmation
City$0.00
County$1.04/sq ft
  • County Comprehensive Impact Fees (Town of Penney Farms, Industrial)
    Clay County
    Clay County Comprehensive Impact Fees, after 10/1/2025. Schedule row: 'Industrial', per 1,000 sq ft. Applicable in Penney Farms: Gov Jails $128 + Fire $688 + Law Enforcement $222 = $1,038. Parks/Libraries $0 for nonres.
    $1.04/sq ft
  • County Mobility Fee (Town of Penney Farms, Industrial)
    Clay County
    CONFIRMED $0 — the Clay County Mobility Fee does NOT apply inside municipal limits. Mobility Fee Ordinance (2026 restatement, eff. 6/15/2026), Sec. 2.01.A + Sec. 3.06: fee reaches only New Construction 'within the unincorporated area of the County'. No interlocal/municipal opt-in provision; 'County Transportation System' excludes City Street System roads. Penney Farms levies no municipal mobility/impact fee. CORRECTED ON AUDIT 2026-07-12: previously held an ASSUMED Lake Asbury & GCS district rate ($3,175/1,000 sq ft, ITE 140 Manufacturing) — district assignment and rate both erroneous; no county mobility fee applies inside the town. Retires the open 'district assignment assumed' question. County Comprehensive Impact Fees DO apply here (separate County record). Contact: Planning & Zoning 904-269-6300.
    $0.00
Total (Penney Farms): $1.04/sq ft + $10,863.35 one-time (≈ $62,763.35 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Town of Penney Farms Clay County Utility Authority (CCUA) Clay County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clay County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Penney Farms: Office Impact Fees

Office development in Penney Farms pays $2.95 per square foot in impact fees, plus $10,863.35 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to at least $84,563.35. The calculator below adjusts to your exact square footage.

The largest line items are County Comprehensive Impact Fees (Town of Penney Farms, Office) ($2.95/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (CCUA, Town of Penney Farms) — 1" meter, 2.5 ERC × $4,345.34/ERC is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Fee (Town of Penney Farms) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Town of Penney Farms)
    Town of Penney Farms
    UNCONFIRMED $0. Town of Penney Farms operates its own water utility (PWS ID 210-1019); CCUA supplies wastewater only. The one-time water connection/tap fee is set by Town Council and is not posted online — no Municode listing, no fee schedule on the town site, and no separate commercial schedule. Re-checked 7/12/2026, still not published. Contact: Josh Young (Water System Operator) 904-838-0277 or Town Hall 904-529-9078.
    Requires confirmation
Sewer$10,863.35 one-time
  • Sewer Connection Fee (CCUA, Town of Penney Farms) — 1" meter, 2.5 ERC × $4,345.34/ERC
    Clay County Utility Authority (CCUA)
    CCUA provides wastewater to Penney Farms (the Town runs water itself). CCUA Wastewater Connection Charge = $4,345.34 per ERC (Service Availability Charges eff. 10/01/2025); the schedule's exclusion applies to Keystone Heights only, so the full charge applies here. Canonical nonres default = 1" meter. UNCONFIRMED for the ERC MULTIPLIER ONLY: CCUA publishes the per-ERC charge but no explicit meter-size→ERC table for service availability charges. Multiplier 2.5 is taken from CCUA's own published meter-equivalency ladder on its Commercial Rates page (clayutility.org/commercial-rates/, 'allowance per meter equivalent ERC'), whose base-charge ratios to the 5/8"x3/4" base are exactly the AWWA factors: 3/4"=1.5, 1"=2.5, 1.5"=5.0, 2"=8.0, 3"=16, 4"=25, 6"=50, 8"=80. Confirm → CCUA 904-272-5999. Debt Service Charge $246.79/ERC not included.
    $10,863.35 one-timeRequires confirmation
City$0.00
County$2.95/sq ft
  • County Comprehensive Impact Fees (Town of Penney Farms, Office)
    Clay County
    Clay County Comprehensive Impact Fees, after 10/1/2025. Schedule row: 'Office', per 1,000 sq ft. Applicable in Penney Farms: Gov Jails $372 + Fire $1,934 + Law Enforcement $642 = $2,948. Parks/Libraries $0 for nonres.
    $2.95/sq ft
  • County Mobility Fee (Town of Penney Farms, Office)
    Clay County
    CONFIRMED $0 — the Clay County Mobility Fee does NOT apply inside municipal limits. Mobility Fee Ordinance (2026 restatement, eff. 6/15/2026), Sec. 2.01.A + Sec. 3.06: fee reaches only New Construction 'within the unincorporated area of the County'. No interlocal/municipal opt-in provision; 'County Transportation System' excludes City Street System roads. Penney Farms levies no municipal mobility/impact fee of its own. CORRECTED ON AUDIT 2026-07-12: previously held an ASSUMED Lake Asbury & GCS district rate ($4,193 net/1,000 sq ft, ITE 710) — district assignment and rate both erroneous; no county mobility fee applies inside the town. Retires the open 'district assignment assumed' question. County Comprehensive Impact Fees DO apply here (separate County record). Contact: Planning & Zoning 904-269-6300.
    $0.00
Total (Penney Farms): $2.95/sq ft + $10,863.35 one-time (≈ $84,563.35 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedules:Town of Penney Farms Clay County Utility Authority (CCUA) Clay County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Clay County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Penney Farms

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Penney Farms, Florida?

A new single-family home in Penney Farms pays at least $25,986.34 per unit in combined impact fees (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Penney Farms?

Commercial development in Penney Farms pays $2.46 per square foot in impact fees, plus $10,863.35 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $134,063.35 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Penney Farms charge its own impact fees?

Yes. Penney Farms levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Penney Farms, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Clay County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000