Beverly Beach applies its own fee schedule: municipal fees plus the Flagler County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $10,792.00 per unit (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Beverly Beach impact fees by project type

Beverly Beach: Single-Family Impact Fees

A new single-family home in Beverly Beach pays at least $10,792.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Flagler County-levied fees account for $5,512.00 and municipal or utility fees for $5,280.00.

The largest line items are Educational Facilities Impact Fee (SFR - Flagler County, in Beverly Beach) ($5,450.00) and EMS Impact Fee (SFR - Flagler County, in Beverly Beach) ($62.00).

Sewer Connection/Impact Fee (SFR - FGUA Beverly Beach System) and Water Connection/Impact Fee (SFR - FGUA Beverly Beach System) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fees (SFR - Town of Beverly Beach) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,780.00
  • Water Connection/Impact Fee (SFR - FGUA Beverly Beach System)
    Florida Governmental Utility Authority (FGUA) - Beverly Beach System
    PROVIDER IDENTIFIED 7/12/2026: Beverly Beach water/sewer is NOT a town utility — it is the FGUA (Florida Governmental Utility Authority) Beverly Beach System (zip 32136, Flagler Co.). Water impact fee $2,780 per ERC per the FGUA Beverly Beach & Eagle Lakes fee schedule (last edition to publish the impact-fee row; FY2026 Beverly Beach Revised sheet republishes rates/charges but omits the Per-ERC impact fee). Unconfirmed pending FGUA confirmation that $2,780/ERC is still the adopted figure — FGUA 1-855-217-6870.
    $2,780.00Requires confirmation
Sewer$2,500.00
  • Sewer Connection/Impact Fee (SFR - FGUA Beverly Beach System)
    Florida Governmental Utility Authority (FGUA) - Beverly Beach System
    PROVIDER IDENTIFIED 7/12/2026: FGUA Beverly Beach System (not a town utility). Sewer impact fee $2,500 per ERC per the FGUA Beverly Beach & Eagle Lakes fee schedule (last edition publishing the impact-fee row; FY2026 sheet omits it). Wastewater lateral installation + tap fee are separate (Contract Operator cost + 5%). Unconfirmed pending FGUA confirmation — 1-855-217-6870.
    $2,500.00Requires confirmation
City$0.00
  • City Impact Fees (SFR - Town of Beverly Beach)
    Town of Beverly Beach
    No municipal impact fees found (pop ~474; town not on Municode and posts no fee schedule — townofbeverlybeach.com returns no content). Unconfirmed: cannot prove 'none' from a current published source. Town Hall 386-439-6888.
    Requires confirmation
County$5,512.00
Total (Beverly Beach): $10,792.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Flagler County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Beverly Beach: Multifamily Impact Fees

A new multifamily unit in Beverly Beach pays at least $6,672.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Flagler County-levied fees account for $1,392.00 and municipal or utility fees for $5,280.00.

The largest line items are Educational Facilities Impact Fee (MF - Flagler County, in Beverly Beach) ($1,360.00) and EMS Impact Fee (MF - Flagler County, in Beverly Beach) ($32.00).

Sewer Connection/Impact Fee (MF - FGUA Beverly Beach System) and Water Connection/Impact Fee (MF - FGUA Beverly Beach System) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fees (MF - Town of Beverly Beach) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,780.00
  • Water Connection/Impact Fee (MF - FGUA Beverly Beach System)
    Florida Governmental Utility Authority (FGUA) - Beverly Beach System
    PROVIDER IDENTIFIED 7/12/2026: Beverly Beach water is the FGUA Beverly Beach System, not a town utility. Water impact fee $2,780 per ERC (FGUA Beverly Beach & Eagle Lakes fee schedule; the FY2026 sheet omits the impact-fee row). MF is charged per ERC/master meter — per-unit ERC factor unknown, so the 1.0-ERC figure is shown. Unconfirmed. FGUA 1-855-217-6870.
    $2,780.00Requires confirmation
Sewer$2,500.00
  • Sewer Connection/Impact Fee (MF - FGUA Beverly Beach System)
    Florida Governmental Utility Authority (FGUA) - Beverly Beach System
    PROVIDER IDENTIFIED 7/12/2026: FGUA Beverly Beach System. Sewer impact fee $2,500 per ERC (FGUA Beverly Beach & Eagle Lakes fee schedule; FY2026 sheet omits the impact-fee row). MF charged per ERC/master meter — per-unit ERC factor unknown. Unconfirmed. FGUA 1-855-217-6870.
    $2,500.00Requires confirmation
City$0.00
  • City Impact Fees (MF - Town of Beverly Beach)
    Town of Beverly Beach
    No municipal impact fees found (pop ~474; not on Municode, no posted fee schedule). Unconfirmed — cannot prove 'none' from a current published source. 386-439-6888.
    Requires confirmation
County$1,392.00
Total (Beverly Beach): $6,672.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Flagler County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Beverly Beach: Commercial Impact Fees

Commercial development in Beverly Beach pays $0.10 per square foot in impact fees, plus $5,280.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $10,130.00. The calculator below adjusts to your exact square footage.

EMS Impact Fee (Flagler County, in Beverly Beach, Commercial), Sewer Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum, and Water Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fees (Town of Beverly Beach, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,780.00 one-time
  • Water Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum
    Florida Governmental Utility Authority (FGUA) - Beverly Beach System
    Beverly Beach water/sewer is provided by FGUA, not the town. Water impact fee $2,780 per ERC per the FGUA Beverly Beach & Eagle Lakes fee schedule — entered as the nonres 1-ERC minimum (nonres ERC count is assigned by the utility; no meter-size table is published). UNCONFIRMED: the FY2026 Beverly Beach sheet republishes rates/charges but omits the per-ERC impact-fee row, and no nonres ERC-assignment table is published. Confirm current per-ERC amount and nonres ERC basis with FGUA 1-855-217-6870.
    $2,780.00 one-timeRequires confirmation
Sewer$2,500.00 one-time
  • Sewer Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum
    Florida Governmental Utility Authority (FGUA) - Beverly Beach System
    FGUA Beverly Beach System sewer impact fee $2,500 per ERC — entered as the nonres 1-ERC minimum. Wastewater lateral installation + tap fee are separate (Contract Operator cost + 5%). UNCONFIRMED: current FY2026 sheet omits the per-ERC impact-fee row; no nonres ERC-assignment table published. FGUA 1-855-217-6870.
    $2,500.00 one-timeRequires confirmation
City$0.00
  • City Impact Fees (Town of Beverly Beach, Commercial)
    Town of Beverly Beach
    $0 — no municipal impact fees. CORRECTED ON AUDIT 2026-07-12: Beverly Beach IS on Municode (prior note wrongly said it was not). Code codified through Ord. No. 2024-04, enacted 10-7-2024, Supp. No. 3, online content updated 12-16-2025. The full chapter index contains NO impact-fee chapter: Ch. 1, 2, 6, 10, 14, 18, 22, 26 (Land Development Code), 27, 30, 34, 38, 42, 46, 50 (Utilities), App. A. Ch. 26 LDC is the only development chapter; water/sewer is provided by FGUA, not the town. UNCONFIRMED retained: the town publishes no standalone fee schedule, so 'none' cannot be proven from an affirmative fee enumeration (same standard applied to Bunnell). Town Hall 386-439-6888; town site is mybeverlybeach.org (townofbeverlybeach.com is not the current site).
    Requires confirmation
County$0.10/sq ft
  • EMS Impact Fee (Flagler County, in Beverly Beach, Commercial)
    Flagler County
    Flagler County EMS Impact Fee, Ch. 17 EMS schedule; row: Retail/Shopping Center 40,001-150,000 sfgla. Applies inside the town under the county-municipal EMS interlocal (Sec. 17-6). UNCONFIRMED: interlocal not posted; no other county fee appears to apply. 386-313-4009.
    $0.10/sq ftRequires confirmation
Total (Beverly Beach): $0.10/sq ft + $5,280.00 one-time (≈ $10,130.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Flagler County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Beverly Beach: Industrial Impact Fees

Industrial development in Beverly Beach pays $0.02 per square foot in impact fees, plus $5,280.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to at least $6,180.00. The calculator below adjusts to your exact square footage.

EMS Impact Fee (Flagler County, in Beverly Beach, Industrial), Sewer Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum, and Water Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fees (Town of Beverly Beach, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,780.00 one-time
  • Water Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum
    Florida Governmental Utility Authority (FGUA) - Beverly Beach System
    Beverly Beach water/sewer is provided by FGUA, not the town. Water impact fee $2,780 per ERC per the FGUA Beverly Beach & Eagle Lakes fee schedule — entered as the nonres 1-ERC minimum (nonres ERC count is assigned by the utility; no meter-size table is published). UNCONFIRMED: the FY2026 Beverly Beach sheet republishes rates/charges but omits the per-ERC impact-fee row, and no nonres ERC-assignment table is published. Confirm current per-ERC amount and nonres ERC basis with FGUA 1-855-217-6870.
    $2,780.00 one-timeRequires confirmation
Sewer$2,500.00 one-time
  • Sewer Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum
    Florida Governmental Utility Authority (FGUA) - Beverly Beach System
    FGUA Beverly Beach System sewer impact fee $2,500 per ERC — entered as the nonres 1-ERC minimum. Wastewater lateral installation + tap fee are separate (Contract Operator cost + 5%). UNCONFIRMED: current FY2026 sheet omits the per-ERC impact-fee row; no nonres ERC-assignment table published. FGUA 1-855-217-6870.
    $2,500.00 one-timeRequires confirmation
City$0.00
  • City Impact Fees (Town of Beverly Beach, Industrial)
    Town of Beverly Beach
    $0 — no municipal impact fees. CORRECTED ON AUDIT 2026-07-12: Beverly Beach IS on Municode (prior note wrongly said it was not). Code codified through Ord. No. 2024-04, enacted 10-7-2024, Supp. No. 3, online content updated 12-16-2025. The full chapter index contains NO impact-fee chapter: Ch. 1, 2, 6, 10, 14, 18, 22, 26 (Land Development Code), 27, 30, 34, 38, 42, 46, 50 (Utilities), App. A. Ch. 26 LDC is the only development chapter; water/sewer is provided by FGUA, not the town. UNCONFIRMED retained: the town publishes no standalone fee schedule, so 'none' cannot be proven from an affirmative fee enumeration (same standard applied to Bunnell). Town Hall 386-439-6888; town site is mybeverlybeach.org (townofbeverlybeach.com is not the current site).
    Requires confirmation
County$0.02/sq ft
Total (Beverly Beach): $0.02/sq ft + $5,280.00 one-time (≈ $6,180.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Flagler County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Beverly Beach: Office Impact Fees

Office development in Beverly Beach pays $0.04 per square foot in impact fees, plus $5,280.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to at least $6,205.00. The calculator below adjusts to your exact square footage.

EMS Impact Fee (Flagler County, in Beverly Beach, Office), Sewer Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum, and Water Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fees (Town of Beverly Beach, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,780.00 one-time
  • Water Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum
    Florida Governmental Utility Authority (FGUA) - Beverly Beach System
    Beverly Beach water/sewer is provided by FGUA, not the town. Water impact fee $2,780 per ERC per the FGUA Beverly Beach & Eagle Lakes fee schedule — entered as the nonres 1-ERC minimum (nonres ERC count is assigned by the utility; no meter-size table is published). UNCONFIRMED: the FY2026 Beverly Beach sheet republishes rates/charges but omits the per-ERC impact-fee row, and no nonres ERC-assignment table is published. Confirm current per-ERC amount and nonres ERC basis with FGUA 1-855-217-6870.
    $2,780.00 one-timeRequires confirmation
Sewer$2,500.00 one-time
  • Sewer Connection/Impact Fee (FGUA Beverly Beach System) — 1 ERC minimum
    Florida Governmental Utility Authority (FGUA) - Beverly Beach System
    FGUA Beverly Beach System sewer impact fee $2,500 per ERC — entered as the nonres 1-ERC minimum. Wastewater lateral installation + tap fee are separate (Contract Operator cost + 5%). UNCONFIRMED: current FY2026 sheet omits the per-ERC impact-fee row; no nonres ERC-assignment table published. FGUA 1-855-217-6870.
    $2,500.00 one-timeRequires confirmation
City$0.00
  • City Impact Fees (Town of Beverly Beach, Office)
    Town of Beverly Beach
    $0 — no municipal impact fees. CORRECTED ON AUDIT 2026-07-12: Beverly Beach IS on Municode (prior note wrongly said it was not). Code codified through Ord. No. 2024-04, enacted 10-7-2024, Supp. No. 3, online content updated 12-16-2025. The full chapter index contains NO impact-fee chapter: Ch. 1, 2, 6, 10, 14, 18, 22, 26 (Land Development Code), 27, 30, 34, 38, 42, 46, 50 (Utilities), App. A. Ch. 26 LDC is the only development chapter; water/sewer is provided by FGUA, not the town. UNCONFIRMED retained: the town publishes no standalone fee schedule, so 'none' cannot be proven from an affirmative fee enumeration (same standard applied to Bunnell). Town Hall 386-439-6888; town site is mybeverlybeach.org (townofbeverlybeach.com is not the current site).
    Requires confirmation
County$0.04/sq ft
Total (Beverly Beach): $0.04/sq ft + $5,280.00 one-time (≈ $6,205.00 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Flagler County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Beverly Beach

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Beverly Beach, Florida?

A new single-family home in Beverly Beach pays at least $10,792.00 per unit in combined impact fees (rates sourced July 12, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Beverly Beach?

Commercial development in Beverly Beach pays $0.10 per square foot in impact fees, plus $5,280.00 in one-time water and sewer connection fees, at least $10,130.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Beverly Beach charge its own impact fees?

Yes. Beverly Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Beverly Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Flagler County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000