IMPACTFEES.ORG

Palm Coast, Florida Impact Fees

Palm Coast applies its own fee schedule: municipal fees plus the Flagler County-levied fees that apply inside city limits. Combined, a new single-family home pays $26,143.25 per unit (rates sourced ). The full breakdown is below.

Palm Coast impact fees by project type

Palm Coast: Single-Family Impact Fees

A new single-family home in Palm Coast pays $26,143.25 per unit in impact fees (rates sourced July 12, 2026). Of that, Flagler County-levied fees account for $5,998.00 and municipal or utility fees for $20,145.25.

The largest line items are Transportation Impact Fee (SFR - City of Palm Coast) ($7,540.00), Educational Facilities Impact Fee (SFR - Flagler County, in Palm Coast) ($5,450.00) and Sewer Capacity Fee (SFR - City of Palm Coast, 1 ERU) ($4,415.00).

View the full Palm Coast impact fee schedule
Water$4,084.25
  • Water Capacity Fee (SFR - City of Palm Coast, 1 ERU)
    City of Palm Coast
    City of Palm Coast water capacity fee (CIAC) — $4,084.25 per ERU; one single-family home = 1.0 ERU. Meter/tap and main-extension charges are billed separately. Effective Oct 1, 2025.
    $4,084.25
Sewer$4,415.00
City$11,646.00
County$5,998.00
Total (Palm Coast): $26,143.25
Sources last checked Official fee schedule:City of Palm Coast

Where in Flagler County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Palm Coast: Multifamily Impact Fees

A new multifamily unit in Palm Coast pays $18,620.25 per unit in impact fees (rates sourced July 12, 2026). Of that, Flagler County-levied fees account for $1,642.00 and municipal or utility fees for $16,978.25.

The largest line items are Sewer Capacity Fee (MF - City of Palm Coast, per ERU) ($4,415.00), Transportation Impact Fee (MF - City of Palm Coast, Multifamily Apartment) ($4,373.00) and Water Capacity Fee (MF - City of Palm Coast, per ERU) ($4,084.25).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Palm Coast impact fee schedule
Water$4,084.25
  • Water Capacity Fee (MF - City of Palm Coast, per ERU)
    City of Palm Coast
    City of Palm Coast water capacity fee (CIAC) — $4,084.25 per ERU. Multifamily is charged by ERU/projected flow; the per-unit ERU factor is not published, so the 1.0-ERU figure is shown. Effective Oct 1, 2025.
    $4,084.25
Sewer$4,415.00
  • Sewer Capacity Fee (MF - City of Palm Coast, per ERU)
    City of Palm Coast
    City of Palm Coast sewer capacity fee (CIAC) — $4,415 per ERU. Multifamily is charged by ERU/projected flow; the per-unit ERU factor is not published, so the 1.0-ERU figure is shown. Effective Oct 1, 2025.
    $4,415.00
City$8,479.00
County$1,642.00
Total (Palm Coast): $18,620.25
Sources last checked Official fee schedules:City of Palm Coast Flagler County

Where in Flagler County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Palm Coast: Commercial Impact Fees

Commercial development in Palm Coast pays $11.96 per square foot in impact fees, plus $8,499.25 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $606,649.25. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (City of Palm Coast, Commercial) ($9.99/sq ft), Fire & Rescue Impact Fee (City of Palm Coast, Commercial) ($1.50/sq ft) and Law Enforcement Impact Fee (Flagler County, in Palm Coast, Commercial) ($0.37/sq ft).

Sewer Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum and Water Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full Palm Coast impact fee schedule
Water$4,084.25 one-time
  • Water Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum
    City of Palm Coast Utility Division
    City of Palm Coast water capacity fee (Contribution in Aid of Construction). Nonresidential connection fees are calculated per project by type of use and average daily flow; the amount shown is the one-ERU minimum. Meter/tap and main-extension charges are billed separately.
    $4,084.25 one-timeRequires confirmation
Sewer$4,415.00 one-time
  • Sewer Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum
    City of Palm Coast Utility Division
    City of Palm Coast wastewater capacity fee (Contribution in Aid of Construction). Nonresidential connection fees are calculated per project by type of use and average daily flow; the amount shown is the one-ERU minimum. Main-extension and PEP-tank charges are billed separately.
    $4,415.00 one-timeRequires confirmation
City$11.49/sq ft
County$0.47/sq ft
Total (Palm Coast): $11.96/sq ft + $8,499.25 one-time (≈ $606,649.25 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Flagler County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Palm Coast: Industrial Impact Fees

Industrial development in Palm Coast pays $5.42 per square foot in impact fees, plus $8,499.25 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $279,649.25. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (City of Palm Coast, Industrial) ($3.83/sq ft), Fire & Rescue Impact Fee (City of Palm Coast, Industrial) ($1.50/sq ft) and Law Enforcement Impact Fee (Flagler County, in Palm Coast, Industrial) ($0.07/sq ft).

Sewer Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum and Water Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full Palm Coast impact fee schedule
Water$4,084.25 one-time
  • Water Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum
    City of Palm Coast Utility Division
    City of Palm Coast water capacity fee (Contribution in Aid of Construction). Nonresidential connection fees are calculated per project by type of use and average daily flow; the amount shown is the one-ERU minimum. Meter/tap and main-extension charges are billed separately.
    $4,084.25 one-timeRequires confirmation
Sewer$4,415.00 one-time
  • Sewer Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum
    City of Palm Coast Utility Division
    City of Palm Coast wastewater capacity fee (Contribution in Aid of Construction). Nonresidential connection fees are calculated per project by type of use and average daily flow; the amount shown is the one-ERU minimum. Main-extension and PEP-tank charges are billed separately.
    $4,415.00 one-timeRequires confirmation
City$5.33/sq ft
County$0.09/sq ft
Total (Palm Coast): $5.42/sq ft + $8,499.25 one-time (≈ $279,649.25 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Flagler County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Palm Coast: Office Impact Fees

Office development in Palm Coast pays $10.61 per square foot in impact fees, plus $8,499.25 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $273,699.25. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (City of Palm Coast, Office) ($8.93/sq ft), Fire & Rescue Impact Fee (City of Palm Coast, Office) ($1.50/sq ft) and Law Enforcement Impact Fee (Flagler County, in Palm Coast, Office) ($0.14/sq ft).

Sewer Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum and Water Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full Palm Coast impact fee schedule
Water$4,084.25 one-time
  • Water Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum
    City of Palm Coast Utility Division
    City of Palm Coast water capacity fee (Contribution in Aid of Construction). Nonresidential connection fees are calculated per project by type of use and average daily flow; the amount shown is the one-ERU minimum. Meter/tap and main-extension charges are billed separately.
    $4,084.25 one-timeRequires confirmation
Sewer$4,415.00 one-time
  • Sewer Capacity Fee / CIAC (City of Palm Coast) — 1 ERU minimum
    City of Palm Coast Utility Division
    City of Palm Coast wastewater capacity fee (Contribution in Aid of Construction). Nonresidential connection fees are calculated per project by type of use and average daily flow; the amount shown is the one-ERU minimum. Main-extension and PEP-tank charges are billed separately.
    $4,415.00 one-timeRequires confirmation
City$10.43/sq ft
County$0.18/sq ft
Total (Palm Coast): $10.61/sq ft + $8,499.25 one-time (≈ $273,699.25 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Flagler County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Palm Coast impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Palm Coast impact fee FAQs

What are the total impact fees for a single-family home in Palm Coast, Florida?

A new single-family home in Palm Coast pays $26,143.25 per unit in combined impact fees (rates sourced July 12, 2026).

How much are commercial impact fees in Palm Coast?

Commercial development in Palm Coast pays $11.96 per square foot in impact fees, plus $8,499.25 in one-time water and sewer connection fees, about $606,649.25 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Palm Coast charge its own impact fees?

Yes. Palm Coast levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Palm Coast, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Flagler County impact fees page.