Madison County, Florida Impact Fees

Impact fees in Madison County depend on where you build. This page details the rates for unincorporated Madison County, which currently has no published impact fees for single-family homes as of July 14, 2026. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Madison County impact fees by project type

Where in Madison County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Madison County: Single-Family Impact Fees

Unincorporated Madison County does not currently levy impact fees on a new single-family home (rates sourced July 14, 2026). The schedule below documents the status of each fee.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Madison County - Unincorporated)
    Madison County
    Madison County operates NO water utility. The county's department roster (Planning & Zoning, Building, Road, Solid Waste & Recycling, Fire Rescue, Animal Control, Code Enforcement, Mosquito Control, Recreation, Extension, Veterans' Services) contains no water/wastewater utility, and the county's complete adopted fee schedule (Res. 2021-07-28, superseding all prior fee resolutions) carries no water connection, capacity or impact fee. Unincorporated development is served by private wells — the schedule prices only a $150 zoning-compliance review for Septic/RV placement and a $20 plumbing-permit line item for a sewer/septic connection. IMPORTANT: where City of Madison water mains already run to a property outside the city limits, the CITY's tap fee applies at the same rate as inside the city ($165 + cost of meter; City Code Sec. 25-49(b)). Confirmed $0 county fee. Audited 2026-07-13.
    $0.00
Sewer$0.00
  • Sewer Connection Fee (Madison County - Unincorporated)
    Madison County
    Madison County operates NO sewer utility. No wastewater department appears on the county's department roster, and the county's complete adopted fee schedule (Res. 2021-07-28, superseding all prior fee resolutions) carries no sewer connection, capacity or impact fee. Unincorporated development is on septic (the schedule prices a $150 zoning-compliance review for Septic/RV placement; a $20 plumbing-permit line covers the sewer/septic connection inspection). IMPORTANT: where City of Madison sewer service extends outside the city limits, the CITY's tap-on fee applies at 1.5x the inside-city rate (= $1,125; City Code Secs. 25-16 / 25-97). Confirmed $0 county fee. Audited 2026-07-13.
    $0.00
City$0.00
County$0.00
  • County Impact Fee (Madison County)
    Madison County
    Madison County levies NO impact fees. Read in full this audit: the county's complete adopted fee schedule (Resolution No. 2021-07-28, adopted 7-28-2021, which 'shall supersede all previous resolutions dealing with this subject') contains only LDC application fees (plat review, variance, special exception, plan amendments), a Site Development Compliance fee ($200 residential), required legal-notice fees, consultant review fees, and a building-permit schedule. No impact fee of any category, and no water/sewer connection or capacity charge. The PDF is image-only and had been written off as unreadable; it rendered cleanly via the Google Docs viewer. Confirmed $0. Audited 2026-07-13.
    $0.00
Total (unincorporated Madison County): $0.00
Sources last checked July 14, 2026Official fee schedule:Madison County

Where in Madison County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Madison County: Multifamily Impact Fees

Unincorporated Madison County does not currently levy impact fees on a new multifamily unit (rates sourced July 14, 2026). The schedule below documents the status of each fee.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Madison County - Unincorporated, MF)
    Madison County
    Madison County operates NO water utility — no water/wastewater department on the county's department roster, and no water connection, capacity or impact fee anywhere in the county's complete adopted fee schedule (Res. 2021-07-28, superseding all prior fee resolutions). Unincorporated development is served by private wells. Where City of Madison water mains already run to a property outside the city limits, the CITY's tap fee applies at the same rate as inside the city ($165 + cost of meter; City Code Sec. 25-49(b)), charged per connection. Confirmed $0 county fee. Audited 2026-07-13.
    $0.00
Sewer$0.00
  • Sewer Connection Fee (Madison County - Unincorporated, MF)
    Madison County
    Madison County operates NO sewer utility — no wastewater department on the county's department roster, and no sewer connection, capacity or impact fee anywhere in the county's complete adopted fee schedule (Res. 2021-07-28, superseding all prior fee resolutions). Unincorporated development is on septic. Where City of Madison sewer service extends outside the city limits, the CITY's tap-on fee applies at 1.5x the inside-city rate (= $1,125; City Code Secs. 25-16 / 25-97). Confirmed $0 county fee. Audited 2026-07-13.
    $0.00
City$0.00
County$0.00
  • County Impact Fee (Madison County, MF)
    Madison County
    Madison County levies NO impact fees. Read in full this audit: the county's complete adopted fee schedule (Res. No. 2021-07-28, adopted 7-28-2021, which 'shall supersede all previous resolutions dealing with this subject') contains only LDC application fees, a Site Development Compliance fee, legal-notice and consultant-review fees, and a building-permit schedule — no impact fee of any category and no water/sewer connection or capacity charge. The image-only PDF, previously written off as unreadable, rendered cleanly via the Google Docs viewer. Confirmed $0. Audited 2026-07-13.
    $0.00
Total (unincorporated Madison County): $0.00
Sources last checked July 14, 2026Official fee schedule:Madison County

Where in Madison County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Madison County: Commercial Impact Fees

Unincorporated Madison County does not currently levy impact fees on commercial development (rates sourced July 14, 2026). The schedule below documents the adopted zero or exempt status for each fee.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Madison County - Unincorporated)
    Madison County
    Madison County operates NO water utility. The county's department roster (Planning & Zoning, Building, Road, Solid Waste & Recycling, Fire Rescue, Animal Control, Code Enforcement, Mosquito Control, Recreation, Extension, Veterans' Services) contains no water/wastewater utility, and the county's complete adopted fee schedule (Resolution No. 2021-07-28, superseding all prior fee resolutions; VERIFIED PAGE-BY-PAGE ON AUDIT) carries no water connection, capacity or impact fee for any customer class — it prices only a $150 zoning-compliance review for Septic/RV placement and a $20 plumbing-permit line for a sewer/septic connection. Unincorporated nonresidential development is served by private wells. IMPORTANT: where City of Madison water mains already run to a property outside the city limits, the CITY's tap fee applies at the same rate as inside the city ($165 + cost of meter; City Code Sec. 25-49(b)) — see the City of Madison water record. ⚠️ SOURCE (corrected on audit): Res. 2021-07-28 is posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL). The Planning & Zoning 'Fees' page still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Confirmed $0 county fee. Researched 2026-07-14; audited 2026-07-14.
    $0.00
Sewer$0.00
  • Sewer Connection Fee (Madison County - Unincorporated)
    Madison County
    Madison County operates NO sewer utility. No wastewater department appears on the county's department roster, and the county's complete adopted fee schedule (Resolution No. 2021-07-28, superseding all prior fee resolutions; VERIFIED PAGE-BY-PAGE ON AUDIT) carries no sewer connection, capacity or impact fee for any customer class — it prices a $150 zoning-compliance review for Septic/RV placement and a $20 plumbing-permit line covering the sewer/septic connection inspection. Unincorporated development is on septic. IMPORTANT: where City of Madison sewer service extends outside the city limits, the CITY's COMMERCIAL tap-on fee applies at 1.5x the inside-city rate = $1,275 (City Code Sec. 25-97(a)) — see the City of Madison sewer record. ⚠️ SOURCE (corrected on audit): Res. 2021-07-28 is posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL). The Planning & Zoning 'Fees' page still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Confirmed $0 county fee. Researched 2026-07-14; audited 2026-07-14.
    $0.00
City$0.00
  • City Impact Fee (Madison County - Unincorporated, Commercial)
    N/A — unincorporated area
    Unincorporated area — no municipal/city-level impact fees apply by definition. Madison County itself levies no impact fee of any category either (see the County records). Confirmed $0. ⚠️ SOURCE (corrected on audit): the county's CURRENT adopted fee schedule is Resolution No. 2021-07-28, posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL) and verified page-by-page — it contains no impact fee. The Planning & Zoning 'Fees' page (madisoncountyfl.com/departments-services/planning-zoning/fees/) still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Researched 2026-07-14; audited 2026-07-14.
    $0.00
County$0.00
  • County Impact Fee (Madison County, Commercial)
    Madison County
    Madison County levies NO impact fee of any category — nonresidential included, and none in the unincorporated area. VERIFIED PAGE-BY-PAGE ON AUDIT against the county's complete adopted fee schedule, Resolution No. 2021-07-28 (7 pp.; 'all prior fee schedules are hereby repealed'): Part I Application Fees; Part I.B Site Development Compliance Fee (a CAPPED REVIEW fee — Commercial $1,000 + $0.03/sq ft to 2,500 sf, $2,500 + $0.06/sq ft above, max $10,000 — cost-recovery plan review, NOT an impact fee); newspaper legal-notice fees; Other Review Fees ($165/hr consultant); Part II Extraordinary Review by Consultants; Part III Schedule of Building Permit Fees. No impact fee of any kind and no nonresidential impact-fee column. The county LDC contains no impact-fee chapter. Confirmed $0. ⚠️ SOURCE: Res. 2021-07-28 is posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL). The Planning & Zoning 'Fees' page still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Researched 2026-07-14; audited 2026-07-14.
    $0.00
Total (unincorporated Madison County): $0.00
Sources last checked July 14, 2026Official fee schedules:Madison County N/A — unincorporated area

Where in Madison County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Madison County: Industrial Impact Fees

Unincorporated Madison County does not currently levy impact fees on industrial development (rates sourced July 14, 2026). The schedule below documents the adopted zero or exempt status for each fee.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Madison County - Unincorporated)
    Madison County
    Madison County operates NO water utility. The county's department roster (Planning & Zoning, Building, Road, Solid Waste & Recycling, Fire Rescue, Animal Control, Code Enforcement, Mosquito Control, Recreation, Extension, Veterans' Services) contains no water/wastewater utility, and the county's complete adopted fee schedule (Resolution No. 2021-07-28, superseding all prior fee resolutions; VERIFIED PAGE-BY-PAGE ON AUDIT) carries no water connection, capacity or impact fee for any customer class — it prices only a $150 zoning-compliance review for Septic/RV placement and a $20 plumbing-permit line for a sewer/septic connection. Unincorporated nonresidential development is served by private wells. IMPORTANT: where City of Madison water mains already run to a property outside the city limits, the CITY's tap fee applies at the same rate as inside the city ($165 + cost of meter; City Code Sec. 25-49(b)) — see the City of Madison water record. ⚠️ SOURCE (corrected on audit): Res. 2021-07-28 is posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL). The Planning & Zoning 'Fees' page still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Confirmed $0 county fee. Researched 2026-07-14; audited 2026-07-14.
    $0.00
Sewer$0.00
  • Sewer Connection Fee (Madison County - Unincorporated)
    Madison County
    Madison County operates NO sewer utility. No wastewater department appears on the county's department roster, and the county's complete adopted fee schedule (Resolution No. 2021-07-28, superseding all prior fee resolutions; VERIFIED PAGE-BY-PAGE ON AUDIT) carries no sewer connection, capacity or impact fee for any customer class — it prices a $150 zoning-compliance review for Septic/RV placement and a $20 plumbing-permit line covering the sewer/septic connection inspection. Unincorporated development is on septic. IMPORTANT: where City of Madison sewer service extends outside the city limits, the CITY's COMMERCIAL tap-on fee applies at 1.5x the inside-city rate = $1,275 (City Code Sec. 25-97(a)) — see the City of Madison sewer record. ⚠️ SOURCE (corrected on audit): Res. 2021-07-28 is posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL). The Planning & Zoning 'Fees' page still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Confirmed $0 county fee. Researched 2026-07-14; audited 2026-07-14.
    $0.00
City$0.00
  • City Impact Fee (Madison County - Unincorporated, Industrial)
    N/A — unincorporated area
    Unincorporated area — no municipal/city-level impact fees apply by definition. Madison County itself levies no impact fee of any category either (see the County records). Confirmed $0. ⚠️ SOURCE (corrected on audit): the county's CURRENT adopted fee schedule is Resolution No. 2021-07-28, posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL) and verified page-by-page — it contains no impact fee. The Planning & Zoning 'Fees' page (madisoncountyfl.com/departments-services/planning-zoning/fees/) still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Researched 2026-07-14; audited 2026-07-14.
    $0.00
County$0.00
  • County Impact Fee (Madison County, Industrial)
    Madison County
    Madison County levies NO impact fee of any category — nonresidential included, and none in the unincorporated area. VERIFIED PAGE-BY-PAGE ON AUDIT against the county's complete adopted fee schedule, Resolution No. 2021-07-28 (7 pp.; 'all prior fee schedules are hereby repealed'): Part I Application Fees; Part I.B Site Development Compliance Fee (a CAPPED REVIEW fee — Commercial $1,000 + $0.03/sq ft to 2,500 sf, $2,500 + $0.06/sq ft above, max $10,000 — cost-recovery plan review, NOT an impact fee); newspaper legal-notice fees; Other Review Fees ($165/hr consultant); Part II Extraordinary Review by Consultants; Part III Schedule of Building Permit Fees. No impact fee of any kind and no nonresidential impact-fee column. Confirmed $0. ⚠️ SOURCE: Res. 2021-07-28 is posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL). The Planning & Zoning 'Fees' page still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Researched 2026-07-14; audited 2026-07-14.
    $0.00
Total (unincorporated Madison County): $0.00
Sources last checked July 14, 2026Official fee schedules:Madison County N/A — unincorporated area

Where in Madison County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Madison County: Office Impact Fees

Unincorporated Madison County does not currently levy impact fees on office development (rates sourced July 14, 2026). The schedule below documents the adopted zero or exempt status for each fee.

View the full fee schedule
Water$0.00
  • Water Connection Fee (Madison County - Unincorporated)
    Madison County
    Madison County operates NO water utility. The county's department roster (Planning & Zoning, Building, Road, Solid Waste & Recycling, Fire Rescue, Animal Control, Code Enforcement, Mosquito Control, Recreation, Extension, Veterans' Services) contains no water/wastewater utility, and the county's complete adopted fee schedule (Resolution No. 2021-07-28, superseding all prior fee resolutions; VERIFIED PAGE-BY-PAGE ON AUDIT) carries no water connection, capacity or impact fee for any customer class — it prices only a $150 zoning-compliance review for Septic/RV placement and a $20 plumbing-permit line for a sewer/septic connection. Unincorporated nonresidential development is served by private wells. IMPORTANT: where City of Madison water mains already run to a property outside the city limits, the CITY's tap fee applies at the same rate as inside the city ($165 + cost of meter; City Code Sec. 25-49(b)) — see the City of Madison water record. ⚠️ SOURCE (corrected on audit): Res. 2021-07-28 is posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL). The Planning & Zoning 'Fees' page still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Confirmed $0 county fee. Researched 2026-07-14; audited 2026-07-14.
    $0.00
Sewer$0.00
  • Sewer Connection Fee (Madison County - Unincorporated)
    Madison County
    Madison County operates NO sewer utility. No wastewater department appears on the county's department roster, and the county's complete adopted fee schedule (Resolution No. 2021-07-28, superseding all prior fee resolutions; VERIFIED PAGE-BY-PAGE ON AUDIT) carries no sewer connection, capacity or impact fee for any customer class — it prices a $150 zoning-compliance review for Septic/RV placement and a $20 plumbing-permit line covering the sewer/septic connection inspection. Unincorporated development is on septic. IMPORTANT: where City of Madison sewer service extends outside the city limits, the CITY's COMMERCIAL tap-on fee applies at 1.5x the inside-city rate = $1,275 (City Code Sec. 25-97(a)) — see the City of Madison sewer record. ⚠️ SOURCE (corrected on audit): Res. 2021-07-28 is posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL). The Planning & Zoning 'Fees' page still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Confirmed $0 county fee. Researched 2026-07-14; audited 2026-07-14.
    $0.00
City$0.00
  • City Impact Fee (Madison County - Unincorporated, Office)
    N/A — unincorporated area
    Unincorporated area — no municipal/city-level impact fees apply by definition. Madison County itself levies no impact fee of any category either (see the County records). Confirmed $0. ⚠️ SOURCE (corrected on audit): the county's CURRENT adopted fee schedule is Resolution No. 2021-07-28, posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL) and verified page-by-page — it contains no impact fee. The Planning & Zoning 'Fees' page (madisoncountyfl.com/departments-services/planning-zoning/fees/) still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Researched 2026-07-14; audited 2026-07-14.
    $0.00
County$0.00
  • County Impact Fee (Madison County, Office)
    Madison County
    Madison County levies NO impact fee of any category — nonresidential included, and none in the unincorporated area. VERIFIED PAGE-BY-PAGE ON AUDIT against the county's complete adopted fee schedule, Resolution No. 2021-07-28 (7 pp.; 'all prior fee schedules are hereby repealed'): Part I Application Fees; Part I.B Site Development Compliance Fee (a CAPPED REVIEW fee — Commercial $1,000 + $0.03/sq ft to 2,500 sf, $2,500 + $0.06/sq ft above, max $10,000 — cost-recovery plan review, NOT an impact fee); newspaper legal-notice fees; Other Review Fees ($165/hr consultant); Part II Extraordinary Review by Consultants; Part III Schedule of Building Permit Fees. No impact fee of any kind and no nonresidential impact-fee column. Confirmed $0. ⚠️ SOURCE: Res. 2021-07-28 is posted under the county's BUILDING DEPARTMENT 'Fees' link (S3 PDF, this URL). The Planning & Zoning 'Fees' page still posts the SUPERSEDED Resolution No. 2016-09-14A — do not cite it. Researched 2026-07-14; audited 2026-07-14.
    $0.00
Total (unincorporated Madison County): $0.00
Sources last checked July 14, 2026Official fee schedules:Madison County N/A — unincorporated area

Estimate your project in Madison County

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

How much are commercial impact fees in Madison County?

Unincorporated Madison County does not currently levy impact fees on commercial development.

Do cities in Madison County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 2 of 3 cities in Madison County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.