Skip to content
IMPACTFEES.ORG

Lee, Florida Impact Fees

Lee applies its own fee schedule. Madison County does not currently add county-level impact fees inside city limits. There are currently no published impact fee amounts for a new single-family home (rates sourced ). The full breakdown is below.

Lee Impact Fees by Project Type

Lee: Single-Family Impact Fees

Lee has no published impact fee amounts for a new single-family home (rates sourced July 14, 2026). The schedule below documents the status of each fee.

Sewer Tap-On Fee (Town of Lee) and Water Tap-On Fee (Town of Lee) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Lee Impact Fee Schedule
Water$0.00
  • Water Tap-On Fee (Town of Lee)
    Town of Lee
    The Town of Lee charges a water tap-on fee for a standard 3/4-inch connection (pipe from the street main to the property plus materials and labor), but the utilities ordinance leaves the amount to the Town and publishes no figure (Ord. 2015-03, Sec. 6-5). Extensions and other abnormal work are billed at cost. Each dwelling unit is charged separately. Properties outside the town limits served by existing town mains pay the same rate.
    Requires confirmation
Sewer$0.00
  • Sewer Tap-On Fee (Town of Lee)
    Town of Lee
    The Town of Lee charges a sewer tap-on fee for a standard connection (pipe from the street lateral to the property line plus materials and labor), but the utilities ordinance leaves the amount to the Town and publishes no figure (Ord. 2015-03, Sec. 2-1). Extensions and other abnormal work are billed at cost. Each dwelling unit is charged separately. Properties outside the town limits served by existing town lines pay the same rate.
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Lee)
    Town of Lee
    The Town of Lee levies no municipal impact fees. Its only development-related charges are the cost-based water and sewer tap-on fees.
    $0.00
County$0.00
Total (Lee): $0.00
Sources last checked Official fee schedules:Town of Lee Madison County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Madison County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lee: Multifamily Impact Fees

Lee has no published impact fee amounts for a new multifamily unit (rates sourced July 14, 2026). The schedule below documents the status of each fee.

Sewer Tap-On Fee (Town of Lee, MF) and Water Tap-On Fee (Town of Lee, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Lee Impact Fee Schedule
Water$0.00
  • Water Tap-On Fee (Town of Lee, MF)
    Town of Lee
    The Town of Lee charges a water tap-on fee per connection, but the utilities ordinance leaves the amount to the Town and publishes no figure (Ord. 2015-03, Sec. 6-5). Each dwelling unit, including each apartment, condominium, or mobile-home unit, is charged the full fee separately (Sec. 1-1). Properties outside the town limits served by existing town mains pay the same rate.
    Requires confirmation
Sewer$0.00
  • Sewer Tap-On Fee (Town of Lee, MF)
    Town of Lee
    The Town of Lee charges a sewer tap-on fee per connection, but the utilities ordinance leaves the amount to the Town and publishes no figure (Ord. 2015-03, Sec. 2-1). Each dwelling unit, including each apartment, is charged the full fee separately (Sec. 1-1). Properties outside the town limits served by existing town lines pay the same rate.
    Requires confirmation
City$0.00
  • City Impact Fee (Town of Lee, MF)
    Town of Lee
    The Town of Lee levies no municipal impact fees. Its only development-related charges are the cost-based water and sewer tap-on fees.
    $0.00
County$0.00
Total (Lee): $0.00
Sources last checked Official fee schedules:Town of Lee Madison County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Madison County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lee: Commercial Impact Fees

Commercial development in Lee pays no per-square-foot impact fees (rates sourced July 14, 2026).

Sewer Tap-On Fee (Town of Lee) and Water Tap-On Fee (Town of Lee) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Lee Impact Fee Schedule
Water$0.00
  • Water Tap-On Fee (Town of Lee)
    Town of Lee
    The Town of Lee charges a water tap-on fee for a standard 3/4-inch connection (pipe from the street main to the property plus materials and labor), but its utilities ordinance leaves the amount to the Town and publishes no figure (Ord. 2015-03, Sec. 6-5). Extensions and other abnormal work are billed at cost. Each commercial unit on a shared connection is charged separately. Properties outside the town limits served by existing town mains pay the same rate.
    Requires confirmation
Sewer$0.00
  • Sewer Tap-On Fee (Town of Lee)
    Town of Lee
    The Town of Lee charges a sewer tap-on fee for a standard connection (pipe from the street lateral to the property line plus materials and labor), but its utilities ordinance leaves the amount to the Town and publishes no figure (Ord. 2015-03, Sec. 2-1). Extensions and other abnormal work are billed at cost. Each commercial unit on a shared connection is charged separately. Properties outside the town limits served by existing town lines pay the same rate.
    Requires confirmation
City$0.00
County$0.00
Total (Lee): $0.00
Sources last checked Official fee schedules:Town of Lee Madison County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Madison County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lee: Industrial Impact Fees

Industrial development in Lee pays no per-square-foot impact fees (rates sourced July 14, 2026).

Sewer Tap-On Fee (Town of Lee) and Water Tap-On Fee (Town of Lee) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Lee Impact Fee Schedule
Water$0.00
  • Water Tap-On Fee (Town of Lee)
    Town of Lee
    The Town of Lee charges a water tap-on fee for a standard 3/4-inch connection (pipe from the street main to the property plus materials and labor), but its utilities ordinance leaves the amount to the Town and publishes no figure (Ord. 2015-03, Sec. 6-5). Extensions and other abnormal work are billed at cost. Each commercial unit on a shared connection is charged separately. Properties outside the town limits served by existing town mains pay the same rate.
    Requires confirmation
Sewer$0.00
  • Sewer Tap-On Fee (Town of Lee)
    Town of Lee
    The Town of Lee charges a sewer tap-on fee for a standard connection (pipe from the street lateral to the property line plus materials and labor), but its utilities ordinance leaves the amount to the Town and publishes no figure (Ord. 2015-03, Sec. 2-1). Extensions and other abnormal work are billed at cost. Each commercial unit on a shared connection is charged separately. Properties outside the town limits served by existing town lines pay the same rate.
    Requires confirmation
City$0.00
County$0.00
Total (Lee): $0.00
Sources last checked Official fee schedules:Town of Lee Madison County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Madison County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lee: Office Impact Fees

Office development in Lee pays no per-square-foot impact fees (rates sourced July 14, 2026).

Sewer Tap-On Fee (Town of Lee) and Water Tap-On Fee (Town of Lee) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Lee Impact Fee Schedule
Water$0.00
  • Water Tap-On Fee (Town of Lee)
    Town of Lee
    The Town of Lee charges a water tap-on fee for a standard 3/4-inch connection (pipe from the street main to the property plus materials and labor), but its utilities ordinance leaves the amount to the Town and publishes no figure (Ord. 2015-03, Sec. 6-5). Extensions and other abnormal work are billed at cost. Each commercial unit on a shared connection is charged separately. Properties outside the town limits served by existing town mains pay the same rate.
    Requires confirmation
Sewer$0.00
  • Sewer Tap-On Fee (Town of Lee)
    Town of Lee
    The Town of Lee charges a sewer tap-on fee for a standard connection (pipe from the street lateral to the property line plus materials and labor), but its utilities ordinance leaves the amount to the Town and publishes no figure (Ord. 2015-03, Sec. 2-1). Extensions and other abnormal work are billed at cost. Each commercial unit on a shared connection is charged separately. Properties outside the town limits served by existing town lines pay the same rate.
    Requires confirmation
City$0.00
County$0.00
Total (Lee): $0.00
Sources last checked Official fee schedules:Town of Lee Madison County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Madison County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lee Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Lee Impact Fee FAQs

How much are commercial impact fees in Lee?

Lee does not currently levy impact fees on commercial development.

Does Lee charge its own impact fees?

Yes. Lee levies its own municipal impact or utility fees. Madison County does not currently add county-level impact fees inside Lee. The schedule on this page shows every fee that applies to development in Lee.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Madison County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000