Crestview, Florida Impact Fees

Crestview applies its own fee schedule. Okaloosa County does not currently add county-level impact fees inside city limits. A new single-family home pays $8,900.00 per unit (rates sourced August 4, 2026). The full breakdown is below.

Crestview impact fees by project type

Crestview: Single-Family Impact Fees

A new single-family home in Crestview pays $8,900.00 per unit in impact fees (rates sourced August 4, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Impact Fee (City of Crestview) ($4,595.00), Mobility Fee (City of Crestview) ($2,095.00) and Water Impact Fee (City of Crestview) ($2,010.00).

View the full fee schedule
Water$2,010.00
  • Water Impact Fee (City of Crestview)
    City of Crestview
    Water Impact Fee $2,010/ERU — verified 8/3/2026 in the city's FY2025-26 Comprehensive Fee Schedule (amended 6/22/2026, p. 16; eff. 10/1/2025), authority Resolution 2025-15 (sewer sibling: $4,595/ERU). NOTE: code was recodified 2025 (Supp. 1 pub. 8/25/2025) — old Sec. 102-377 no longer exists; utilities are now Ch. 90, which defers all fee amounts to the comprehensive fee schedule, so the authority is Res. 2025-15, not a code table.
    $2,010.00
Sewer$4,595.00
  • Sewer Impact Fee (City of Crestview)
    City of Crestview
    Sanitary Sewer Impact Fee $4,595/ERU — verified 8/3/2026 in the city's FY2025-26 Comprehensive Fee Schedule (amended 6/22/2026, p. 16; eff. 10/1/2025), authority Resolution 2025-15 (water sibling: $2,010/ERU). NOTE: code recodified 2025 — old Sec. 102-377 no longer exists; utilities now Ch. 90, all fee amounts defer to the comprehensive fee schedule.
    $4,595.00
City$2,295.00
  • Mobility Fee (City of Crestview)
    City of Crestview
    8/4/2026: Split from generic municipal placeholder. Mobility fee - Ord. 1997 adopted 4/28/2025 (Code Ch. 86 Art. V; city opted out of the county mobility fee system). Per Comprehensive Fee Schedule (amended 6/22/2026): SF detached $2,095/DU (SF attached $1,600; mobile home $1,583). Paid before development-order approval; subdivisions pay 1 unit at dev order, remainder at each building permit. City Hall 850-682-1560.
    $2,095.00
  • Police & Fire Public Safety Facilities Fee (City of Crestview)
    City of Crestview
    8/4/2026: Split from generic municipal placeholder. Police & Fire Public Safety Facilities Fee - Code Ch. 34 Art. II (Ord. 1334, 2007; Res. 2020-13): $200 per single dwelling unit, paid at building permit. City Hall 850-682-1560.
    $200.00
County$0.00
  • County Mobility Fee (Okaloosa County — Not Assessed Inside Crestview)
    Okaloosa County
    8/4/2026: County ADOPTED a mobility fee (Ord. 2024-23, 12/3/2024; LDC Ch. 4 & Ch. 12) but it is NOT assessed on development inside municipalities unless the city opts in via interlocal agreement (LDC 4.03.04(9)). No mobility-fee interlocal found for the City of Crestview as of 8/4/2026, so the county fee is $0 here. County levies no other general impact fee; no school impact fee found. NOTE: Crestview instead adopted its OWN municipal mobility fee 4/28/2025 (see city record). Growth Mgmt 850-651-7180.
    $0.00
Total (Crestview): $8,900.00
Sources last checked August 4, 2026Official fee schedules:City of Crestview Okaloosa County

Where in Okaloosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Crestview: Multifamily Impact Fees

A new multifamily unit in Crestview pays $8,304.00 per unit in impact fees (rates sourced August 4, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Mobility Fee (City of Crestview, MF) ($1,499.00) and Police & Fire Public Safety Facilities Fee (City of Crestview, MF) ($200.00).

Sewer Impact Fee (City of Crestview) (MF) and Water Impact Fee (City of Crestview) (MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$2,010.00
  • Water Impact Fee (City of Crestview) (MF)
    City of Crestview
    City of Crestview Water Impact Fee ~$2,010/ERU per the city's 2025-26 fee summary; code basis Sec. 102-377, Table 1. MF per-unit ERU factor NOT established — the SFR per-ERU rate is shown as a placeholder and may overstate the per-unit MF charge. UNCONFIRMED — 7/12/2026 city rate page is an empty JS shell and Municode/elaws sections render nothing. Verify amount + MF ERU factor: 850-682-6131 / h2o@cityofcrestview.org.
    $2,010.00Requires confirmation
Sewer$4,595.00
  • Sewer Impact Fee (City of Crestview) (MF)
    City of Crestview
    AMOUNT VERIFIED PER ERU, MF ERU FACTOR UNRESOLVED (re-checked 8/3/2026). Sewer Impact Fee $4,595/ERU per the city's FY2025-26 Comprehensive Fee Schedule (amended 6/22/2026, p. 16; eff. 10/1/2025), authority Resolution 2025-15 — same source as the SFR sibling (code recodified 2025; old Sec. 102-377 gone; utilities now Ch. 90 deferring to the fee schedule). Flag stays: the ERU factor for a canonical MF unit (2BR/1,000 sf) is not published — SFR 1.0-ERU rate shown as placeholder. Verify MF factor: 850-682-6131 / h2o@cityofcrestview.org.
    $4,595.00Requires confirmation
City$1,699.00
  • Mobility Fee (City of Crestview, MF)
    City of Crestview
    8/4/2026: Split from generic municipal placeholder. Mobility fee - Ord. 1997 adopted 4/28/2025 (Code Ch. 86 Art. V). Per Comprehensive Fee Schedule (amended 6/22/2026): multifamily $1,499/DU. Paid before development-order approval; subdivisions pay 1 unit at dev order, remainder at each building permit. City Hall 850-682-1560.
    $1,499.00
  • Police & Fire Public Safety Facilities Fee (City of Crestview, MF)
    City of Crestview
    8/4/2026: Split from generic municipal placeholder. Police & Fire Public Safety Facilities Fee - Code Ch. 34 Art. II (Ord. 1334, 2007; Res. 2020-13): $200 per dwelling unit, paid at building permit. City Hall 850-682-1560.
    $200.00
County$0.00
  • County Mobility Fee (Okaloosa County — Not Assessed Inside Crestview) (MF)
    Okaloosa County
    8/4/2026: County ADOPTED a mobility fee (Ord. 2024-23, 12/3/2024; LDC Ch. 4 & Ch. 12) but it is NOT assessed on development inside municipalities unless the city opts in via interlocal agreement (LDC 4.03.04(9)). No mobility-fee interlocal found for the City of Crestview as of 8/4/2026, so the county fee is $0 here. County levies no other general impact fee; no school impact fee found. NOTE: Crestview instead adopted its OWN municipal mobility fee 4/28/2025 (see city record). Growth Mgmt 850-651-7180.
    $0.00
Total (Crestview): $8,304.00
Sources last checked August 4, 2026Official fee schedules:City of Crestview Okaloosa County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Okaloosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Crestview: Commercial Impact Fees

Commercial development in Crestview pays no per-square-foot impact fees, but owes $6,605.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).

For a 50,000 sq ft building, that comes to at least $6,605.00. The calculator below adjusts to your exact square footage.

Sewer Impact Fee (City of Crestview) — 1 ERU and Water Impact Fee (City of Crestview) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fee Placeholder (Crestview, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,010.00 one-time
  • Water Impact Fee (City of Crestview) — 1 ERU
    City of Crestview
    City of Crestview Water Impact Fee ~$2,010 per ERU (1.0 ERU base) per the city's 2025-26 Comprehensive Fee Schedule summary. Code basis Sec. 102-377 Table 1. Amount NOT traced to the adopted Table 1 (city rate pages + Municode/elaws did not render 2026-07-17). Unconfirmed — City Utilities 850-682-6131 / h2o@cityofcrestview.org.
    $2,010.00 one-timeRequires confirmation
Sewer$4,595.00 one-time
  • Sewer Impact Fee (City of Crestview) — 1 ERU
    City of Crestview
    City of Crestview Sanitary Sewer Impact Fee ~$4,595 per ERU (1.0 ERU base) per the city's 2025-26 Comprehensive Fee Schedule summary. Code basis Sec. 102-377 Table 1. Amount NOT traced to adopted Table 1. Unconfirmed — City Utilities 850-682-6131 / h2o@cityofcrestview.org.
    $4,595.00 one-timeRequires confirmation
City$0.00
  • City Impact Fee Placeholder (Crestview, Commercial)
    No municipal development impact fee (parks/police/fire/transportation/mobility) found in Crestview's code; utility capacity fees tracked under the W/S table. City fee-schedule pages did not render 2026-07-17. Unverified $0 — City Hall 850-682-1560.
    Requires confirmation
County$0.00
  • County Impact Fee Placeholder (Crestview, Commercial)
    Okaloosa County levies NO county-wide impact or mobility fee on nonresidential development. Confirmed 2026-07-17 against the county's adopted Inspection & Permitting Fee schedule (Growth Management) and 2024 Developers Help Guide — neither contains an impact fee; LDC Appendix E Ch. 12 holds a mobility-fee framework with no adopted rate schedule. School-district impact fee is residential-only (no nonres bearing). Growth Management 850-651-7180.
    $0.00
Total (Crestview): $6,605.00 one-time (≈ $6,605.00 at 50,000 sq ft)
Sources last checked August 4, 2026Official fee schedule:City of Crestview
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Okaloosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Crestview: Industrial Impact Fees

Industrial development in Crestview pays no per-square-foot impact fees, but owes $6,605.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).

For a 50,000 sq ft building, that comes to at least $6,605.00. The calculator below adjusts to your exact square footage.

Sewer Impact Fee (City of Crestview) — 1 ERU and Water Impact Fee (City of Crestview) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fee Placeholder (Crestview, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,010.00 one-time
  • Water Impact Fee (City of Crestview) — 1 ERU
    City of Crestview
    City of Crestview Water Impact Fee ~$2,010 per ERU (1.0 ERU base) per the city's 2025-26 Comprehensive Fee Schedule summary. Code basis Sec. 102-377 Table 1. Amount NOT traced to the adopted Table 1 (city rate pages + Municode/elaws did not render 2026-07-17). Unconfirmed — City Utilities 850-682-6131 / h2o@cityofcrestview.org.
    $2,010.00 one-timeRequires confirmation
Sewer$4,595.00 one-time
  • Sewer Impact Fee (City of Crestview) — 1 ERU
    City of Crestview
    City of Crestview Sanitary Sewer Impact Fee ~$4,595 per ERU (1.0 ERU base) per the city's 2025-26 Comprehensive Fee Schedule summary. Code basis Sec. 102-377 Table 1. Amount NOT traced to adopted Table 1. Unconfirmed — City Utilities 850-682-6131 / h2o@cityofcrestview.org.
    $4,595.00 one-timeRequires confirmation
City$0.00
  • City Impact Fee Placeholder (Crestview, Industrial)
    No municipal development impact fee (parks/police/fire/transportation/mobility) found in Crestview's code; utility capacity fees tracked under the W/S table. City fee-schedule pages did not render 2026-07-17. Unverified $0 — City Hall 850-682-1560.
    Requires confirmation
County$0.00
  • County Impact Fee Placeholder (Crestview, Industrial)
    Okaloosa County levies NO county-wide impact or mobility fee on nonresidential development. Confirmed 2026-07-17 against the county's adopted Inspection & Permitting Fee schedule (Growth Management) and 2024 Developers Help Guide — neither contains an impact fee; LDC Appendix E Ch. 12 holds a mobility-fee framework with no adopted rate schedule. School-district impact fee is residential-only (no nonres bearing). Growth Management 850-651-7180.
    $0.00
Total (Crestview): $6,605.00 one-time (≈ $6,605.00 at 50,000 sq ft)
Sources last checked August 4, 2026Official fee schedule:City of Crestview
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Okaloosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Crestview: Office Impact Fees

Office development in Crestview pays no per-square-foot impact fees, but owes $6,605.00 in one-time water and sewer connection fees (rates sourced August 4, 2026).

For a 25,000 sq ft building, that comes to at least $6,605.00. The calculator below adjusts to your exact square footage.

Sewer Impact Fee (City of Crestview) — 1 ERU and Water Impact Fee (City of Crestview) — 1 ERU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fee Placeholder (Crestview, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$2,010.00 one-time
  • Water Impact Fee (City of Crestview) — 1 ERU
    City of Crestview
    City of Crestview Water Impact Fee ~$2,010 per ERU (1.0 ERU base) per the city's 2025-26 Comprehensive Fee Schedule summary. Code basis Sec. 102-377 Table 1. Amount NOT traced to the adopted Table 1 (city rate pages + Municode/elaws did not render 2026-07-17). Unconfirmed — City Utilities 850-682-6131 / h2o@cityofcrestview.org.
    $2,010.00 one-timeRequires confirmation
Sewer$4,595.00 one-time
  • Sewer Impact Fee (City of Crestview) — 1 ERU
    City of Crestview
    City of Crestview Sanitary Sewer Impact Fee ~$4,595 per ERU (1.0 ERU base) per the city's 2025-26 Comprehensive Fee Schedule summary. Code basis Sec. 102-377 Table 1. Amount NOT traced to adopted Table 1. Unconfirmed — City Utilities 850-682-6131 / h2o@cityofcrestview.org.
    $4,595.00 one-timeRequires confirmation
City$0.00
  • City Impact Fee Placeholder (Crestview, Office)
    No municipal development impact fee (parks/police/fire/transportation/mobility) found in Crestview's code; utility capacity fees tracked under the W/S table. City fee-schedule pages did not render 2026-07-17. Unverified $0 — City Hall 850-682-1560.
    Requires confirmation
County$0.00
  • County Impact Fee Placeholder (Crestview, Office)
    Okaloosa County levies NO county-wide impact or mobility fee on nonresidential development. Confirmed 2026-07-17 against the county's adopted Inspection & Permitting Fee schedule (Growth Management) and 2024 Developers Help Guide — neither contains an impact fee; LDC Appendix E Ch. 12 holds a mobility-fee framework with no adopted rate schedule. School-district impact fee is residential-only (no nonres bearing). Growth Management 850-651-7180.
    $0.00
Total (Crestview): $6,605.00 one-time (≈ $6,605.00 at 25,000 sq ft)
Sources last checked August 4, 2026Official fee schedule:City of Crestview
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Okaloosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Crestview

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Frequently asked questions

What are the total impact fees for a single-family home in Crestview, Florida?

A new single-family home in Crestview pays $8,900.00 per unit in combined impact fees (rates sourced August 4, 2026).

How much are commercial impact fees in Crestview?

Commercial development in Crestview pays no per-square-foot impact fees, but owes $6,605.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Crestview charge its own impact fees?

Yes. Crestview levies its own municipal impact or utility fees. Okaloosa County does not currently add county-level impact fees inside Crestview. The schedule on this page shows every fee that applies to development in Crestview.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Okaloosa County impact fees page.

Missing a jurisdiction? Get in touch.