Niceville Impact Fees by Project Type
Niceville: Single-Family Impact Fees
A new single-family home in Niceville pays $7,849.57 per unit in impact fees (rates sourced October 21, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Niceville) ($4,550.00), Sewer Impact Fee (City of Niceville) ($2,830.00) and Stormwater Impact Fee (City of Niceville) ($269.57).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Niceville Impact Fee Schedule
- Water Impact Fee (City of Niceville)$4,550.00Up to 1" meterCity of NicevilleThe City of Niceville charges a one-time water impact fee of $4,550 per residential unit (standard meter, inside city limits) for connection to the city water system, in addition to meter and installation costs.
- Sewer Impact Fee (City of Niceville)$2,830.00City of NicevilleThe City of Niceville charges a one-time sewer impact fee of $2,830 per residential unit for connection to the city sewer system, in addition to tap and connection charges.
- Stormwater Impact Fee (City of Niceville)$269.57City of NicevilleThe City of Niceville charges a one-time stormwater impact fee of $269.57 per new single-family home (equal to five years of standard stormwater utility billing), paid at building permit.
- Fire Protection Impact Fee (City of Niceville)$200.00City of NicevilleThe City of Niceville charges a fire protection impact fee of $200 per new single-family home.
- County Mobility Fee (Okaloosa County, within Niceville)$0.00Okaloosa CountyOkaloosa County adopted a countywide mobility fee program in December 2024, but the county fee applies only in the unincorporated area. It is not charged on new development inside the City of Niceville, which has not opted into the county system.
Where in Okaloosa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Niceville: Multifamily Impact Fees
A new multifamily unit in Niceville pays $7,849.57 per unit in impact fees (rates sourced October 21, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Niceville) (MF) ($4,550.00), Sewer Impact Fee (City of Niceville) (MF) ($2,830.00) and Stormwater Impact Fee (City of Niceville, MF) ($269.57).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Niceville Impact Fee Schedule
- Water Impact Fee (City of Niceville) (MF)$4,550.00Up to 1" meterCity of NicevilleThe City of Niceville charges a one-time water impact fee of $4,550 per residential unit (standard meter, inside city limits) for connection to the city water system, in addition to meter and installation costs.
- Sewer Impact Fee (City of Niceville) (MF)$2,830.00City of NicevilleThe City of Niceville charges a one-time sewer impact fee of $2,830 per residential unit for connection to the city sewer system, in addition to tap and connection charges.
- Stormwater Impact Fee (City of Niceville, MF)$269.57City of NicevilleThe City of Niceville charges a one-time stormwater impact fee of $269.57 per new dwelling unit, paid at building permit.
- Fire Protection Impact Fee (City of Niceville, MF)$200.00City of NicevilleThe City of Niceville charges a fire protection impact fee of $200 per new dwelling unit; buildings taller than 45 feet pay an additional per-floor surcharge.
- County Mobility Fee (Okaloosa County, within Niceville, MF)$0.00Okaloosa CountyOkaloosa County adopted a countywide mobility fee program in December 2024, but the county fee applies only in the unincorporated area. It is not charged on new development inside the City of Niceville, which has not opted into the county system.
Where in Okaloosa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Niceville: Commercial Impact Fees
Commercial development in Niceville pays $0.03 per square foot in impact fees, plus $7,920.16 in one-time water and sewer connection fees (rates sourced October 21, 2026).
For a 50,000 sq ft building, that comes to about $9,253.66. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Niceville) — 1" meter ($4,550.00 one-time), Sewer Impact Fee (City of Niceville) — 1 ERU ($2,830.00 one-time) and Stormwater Impact Fee (City of Niceville, Commercial) ($540.16 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Niceville Impact Fee Schedule
- Water Impact Fee (City of Niceville) — 1" meter$4,550.00 one-timeUp to 1"City of NicevilleCity of Niceville water impact fee inside city limits for a meter up to 1 inch: $4,550 per business unit of commercial construction, in addition to meter cost and installation fees. Larger meters pay more (1-1/2 inch $5,890, 2 inch $6,445, 3 inch $6,980; above 3 inches the meter cost plus $3,000). Rates set by Resolution 14-09-07, effective September 11, 2014. Customers outside city limits pay a higher rate.
- Sewer Impact Fee (City of Niceville) — 1 ERU$2,830.00 one-timeCity of NicevilleCity of Niceville sewer impact fee: $2,830 per equivalent residential unit (ERU). Nonresidential buildings are charged by the number of ERUs their use generates under the city's ERU determination table; the amount shown is one ERU. The number of water connections does not affect the fee. Rate set by Resolution 14-09-06, effective September 11, 2014.
- Stormwater Impact Fee (City of Niceville, Commercial)$540.16 one-timeCity of NicevilleCity of Niceville one-time stormwater impact fee for a commercial or industrial use: $540.16 per building permit, set at about five years of standard stormwater utility billing. Applies to new development and redeveloped parcels.
- Fire Protection Impact Fee (City of Niceville, Commercial) — $200 per 7,500 sf$0.03/sq ftCity of NicevilleCity of Niceville fire protection impact fee for commercial buildings: $200 per equivalent residential unit of 7,500 sq ft (about $26.67 per 1,000 sq ft), with $200 for each additional unit. Buildings taller than 45 feet pay an added $200 per unit per floor. Applies to new development and redeveloped parcels inside city limits.
- County Impact Fee Placeholder (Niceville, Commercial)$0.00Okaloosa County's mobility fee (Ord. 2024-23) applies only in unincorporated areas and is not charged inside the City of Niceville unless the city collects it by interlocal agreement.
Where in Okaloosa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Niceville: Industrial Impact Fees
Industrial development in Niceville pays $0.03 per square foot in impact fees, plus $7,920.16 in one-time water and sewer connection fees (rates sourced October 21, 2026).
For a 50,000 sq ft building, that comes to about $9,253.66. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Niceville) — 1" meter ($4,550.00 one-time), Sewer Impact Fee (City of Niceville) — 1 ERU ($2,830.00 one-time) and Stormwater Impact Fee (City of Niceville, Industrial) ($540.16 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Niceville Impact Fee Schedule
- Water Impact Fee (City of Niceville) — 1" meter$4,550.00 one-timeUp to 1"City of NicevilleCity of Niceville water impact fee inside city limits for a meter up to 1 inch: $4,550 per business unit of commercial construction, in addition to meter cost and installation fees. Larger meters pay more (1-1/2 inch $5,890, 2 inch $6,445, 3 inch $6,980; above 3 inches the meter cost plus $3,000). Rates set by Resolution 14-09-07, effective September 11, 2014. Customers outside city limits pay a higher rate.
- Sewer Impact Fee (City of Niceville) — 1 ERU$2,830.00 one-timeCity of NicevilleCity of Niceville sewer impact fee: $2,830 per equivalent residential unit (ERU). Nonresidential buildings are charged by the number of ERUs their use generates under the city's ERU determination table; the amount shown is one ERU. The number of water connections does not affect the fee. Rate set by Resolution 14-09-06, effective September 11, 2014.
- Stormwater Impact Fee (City of Niceville, Industrial)$540.16 one-timeCity of NicevilleCity of Niceville one-time stormwater impact fee for an industrial use: $540.16 per building permit, set at about five years of standard stormwater utility billing. Applies to new development and redeveloped parcels.
- Fire Protection Impact Fee (City of Niceville, Industrial) — $200 per 7,500 sf$0.03/sq ftCity of NicevilleCity of Niceville fire protection impact fee for industrial buildings: $200 per equivalent residential unit of 7,500 sq ft (about $26.67 per 1,000 sq ft), with $200 for each additional unit. Buildings taller than 45 feet pay an added $200 per unit per floor. Applies to new development and redeveloped parcels inside city limits.
- County Impact Fee Placeholder (Niceville, Industrial)$0.00Okaloosa County's mobility fee (Ord. 2024-23) applies only in unincorporated areas and is not charged inside the City of Niceville unless the city collects it by interlocal agreement.
Where in Okaloosa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Niceville: Office Impact Fees
Office development in Niceville pays $0.03 per square foot in impact fees, plus $7,920.16 in one-time water and sewer connection fees (rates sourced October 21, 2026).
For a 25,000 sq ft building, that comes to about $8,586.91. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Niceville) — 1" meter ($4,550.00 one-time), Sewer Impact Fee (City of Niceville) — 1 ERU ($2,830.00 one-time) and Stormwater Impact Fee (City of Niceville, Office) ($540.16 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Niceville Impact Fee Schedule
- Water Impact Fee (City of Niceville) — 1" meter$4,550.00 one-timeUp to 1"City of NicevilleCity of Niceville water impact fee inside city limits for a meter up to 1 inch: $4,550 per business unit of commercial construction, in addition to meter cost and installation fees. Larger meters pay more (1-1/2 inch $5,890, 2 inch $6,445, 3 inch $6,980; above 3 inches the meter cost plus $3,000). Rates set by Resolution 14-09-07, effective September 11, 2014. Customers outside city limits pay a higher rate.
- Sewer Impact Fee (City of Niceville) — 1 ERU$2,830.00 one-timeCity of NicevilleCity of Niceville sewer impact fee: $2,830 per equivalent residential unit (ERU). Nonresidential buildings are charged by the number of ERUs their use generates under the city's ERU determination table; the amount shown is one ERU. The number of water connections does not affect the fee. Rate set by Resolution 14-09-06, effective September 11, 2014.
- Stormwater Impact Fee (City of Niceville, Office)$540.16 one-timeCity of NicevilleCity of Niceville one-time stormwater impact fee for a commercial use, offices included: $540.16 per building permit, set at about five years of standard stormwater utility billing. Applies to new development and redeveloped parcels.
- Fire Protection Impact Fee (City of Niceville, Office) — $200 per 7,500 sf$0.03/sq ftCity of NicevilleCity of Niceville fire protection impact fee for commercial buildings, offices included: $200 per equivalent residential unit of 7,500 sq ft (about $26.67 per 1,000 sq ft), with $200 for each additional unit. Buildings taller than 45 feet pay an added $200 per unit per floor. Applies to new development and redeveloped parcels inside city limits.
- County Impact Fee Placeholder (Niceville, Office)$0.00Okaloosa County's mobility fee (Ord. 2024-23) applies only in unincorporated areas and is not charged inside the City of Niceville unless the city collects it by interlocal agreement.
Where in Okaloosa County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Niceville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Niceville Impact Fee FAQs
What are the total impact fees for a single-family home in Niceville, Florida?
A new single-family home in Niceville pays $7,849.57 per unit in combined impact fees (rates sourced October 21, 2026).
How much are commercial impact fees in Niceville?
Commercial development in Niceville pays $0.03 per square foot in impact fees, plus $7,920.16 in one-time water and sewer connection fees (assuming a 1-inch meter), about $9,253.66 for a 50,000 sq ft building.
Does Niceville charge its own impact fees?
Yes. Niceville levies its own municipal impact or utility fees. Okaloosa County does not currently add county-level impact fees inside Niceville. The schedule on this page shows every fee that applies to development in Niceville.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Okaloosa County impact fees page.