Shalimar impact fees by project type
Shalimar: Single-Family Impact Fees
A new single-family home in Shalimar pays at least $4,800.00 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Okaloosa County.
The largest line items are Sewer Capacity Fee (Okaloosa County W&S, Shalimar) ($3,800.00) and Water Capacity Fee (Okaloosa County W&S, Shalimar) ($1,000.00).
Municipal Impact Fees (Town of Shalimar — None Found) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Shalimar impact fee schedule
- Water Capacity Fee (Okaloosa County W&S, Shalimar)$1,000.00Okaloosa County Water & SewerOkaloosa County Water & Sewer one-time water capacity expansion charge: $1,000 per ERU (a single-family home = 1.0 ERU). Current under the October 1, 2025 to September 30, 2026 rate plan (Appendix A); the county re-adopts rates each October 1. Applies where the parcel is served by Okaloosa County Water & Sewer.
- Sewer Capacity Fee (Okaloosa County W&S, Shalimar)$3,800.00Okaloosa County Water & SewerOkaloosa County Water & Sewer one-time sewer capacity expansion charge: $3,800 per ERU (a single-family home = 1.0 ERU). Current under the October 1, 2025 to September 30, 2026 rate plan (Appendix A); the county re-adopts rates each October 1. Applies where the parcel is served by Okaloosa County Water & Sewer.
- Municipal Impact Fees (Town of Shalimar — None Found)Requires confirmationTown of ShalimarThis jurisdiction levies no municipal (non-utility) development impact fees such as parks, police, fire, or transportation. Any applicable water and sewer fees are listed under separate records.
- County Mobility Fee (Okaloosa County — Not Assessed Inside Shalimar)$0.00Okaloosa CountyOkaloosa County adopted a countywide mobility fee program in December 2024, but the county fee applies only in the unincorporated area. It is not charged on new development inside the Town of Shalimar, which has not opted into the county system. No other county-level impact fee applies to residential construction.
Where in Okaloosa County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Shalimar: Multifamily Impact Fees
A new multifamily unit in Shalimar pays at least $4,800.00 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Okaloosa County.
Sewer Capacity Fee (Okaloosa County W&S, Shalimar) (MF) and Water Capacity Fee (Okaloosa County W&S, Shalimar) (MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Municipal Impact Fees (Town of Shalimar — None Found) (MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Shalimar impact fee schedule
- Water Capacity Fee (Okaloosa County W&S, Shalimar) (MF)$1,000.00Requires confirmationOkaloosa County Water & SewerOkaloosa County Water & Sewer one-time water capacity expansion charge: $1,000 per ERU; each dwelling unit = 1.0 ERU, so $1,000 per unit. Current under the October 1, 2025 to September 30, 2026 rate plan (Appendix A); re-adopted each October 1. Applies where served by Okaloosa County Water & Sewer.
- Sewer Capacity Fee (Okaloosa County W&S, Shalimar) (MF)$3,800.00Requires confirmationOkaloosa County Water & SewerOkaloosa County Water & Sewer one-time sewer capacity expansion charge: $3,800 per ERU; each dwelling unit = 1.0 ERU, so $3,800 per unit. Current under the October 1, 2025 to September 30, 2026 rate plan (Appendix A); re-adopted each October 1. Applies where served by Okaloosa County Water & Sewer.
- Municipal Impact Fees (Town of Shalimar — None Found) (MF)Requires confirmationTown of ShalimarThis jurisdiction levies no municipal (non-utility) development impact fees such as parks, police, fire, or transportation. Any applicable water and sewer fees are listed under separate records.
- County Mobility Fee (Okaloosa County — Not Assessed Inside Shalimar) (MF)$0.00Okaloosa CountyOkaloosa County adopted a countywide mobility fee program in December 2024, but the county fee applies only in the unincorporated area. It is not charged on new development inside the Town of Shalimar, which has not opted into the county system. No other county-level impact fee applies to residential construction.
Where in Okaloosa County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Shalimar: Commercial Impact Fees
Commercial development in Shalimar pays no per-square-foot impact fees, but owes $5,000.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $5,000.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (Okaloosa County W&S, Shalimar) — 4" outlet and Water Capacity Fee (Okaloosa County W&S, Shalimar) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee Placeholder (Shalimar, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Shalimar impact fee schedule
- Water Capacity Fee (Okaloosa County W&S, Shalimar) — 1" meter$1,200.00 one-timeRequires confirmationOkaloosa County Water & Sewer
- Sewer Capacity Fee (Okaloosa County W&S, Shalimar) — 4" outlet$3,800.00 one-timeRequires confirmationOkaloosa County Water & Sewer
- Requires confirmation
- $0.00
Where in Okaloosa County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Shalimar: Industrial Impact Fees
Industrial development in Shalimar pays no per-square-foot impact fees, but owes $5,000.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $5,000.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (Okaloosa County W&S, Shalimar) — 4" outlet and Water Capacity Fee (Okaloosa County W&S, Shalimar) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee Placeholder (Shalimar, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Shalimar impact fee schedule
- Water Capacity Fee (Okaloosa County W&S, Shalimar) — 1" meter$1,200.00 one-timeRequires confirmationOkaloosa County Water & Sewer
- Sewer Capacity Fee (Okaloosa County W&S, Shalimar) — 4" outlet$3,800.00 one-timeRequires confirmationOkaloosa County Water & Sewer
- Requires confirmation
- $0.00
Where in Okaloosa County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Shalimar: Office Impact Fees
Office development in Shalimar pays no per-square-foot impact fees, but owes $5,000.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 25,000 sq ft building, that comes to at least $5,000.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Capacity Fee (Okaloosa County W&S, Shalimar) — 4" outlet and Water Capacity Fee (Okaloosa County W&S, Shalimar) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
City Impact Fee Placeholder (Shalimar, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Shalimar impact fee schedule
- Water Capacity Fee (Okaloosa County W&S, Shalimar) — 1" meter$1,200.00 one-timeRequires confirmationOkaloosa County Water & Sewer
- Sewer Capacity Fee (Okaloosa County W&S, Shalimar) — 4" outlet$3,800.00 one-timeRequires confirmationOkaloosa County Water & Sewer
- Requires confirmation
- $0.00
Where in Okaloosa County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Shalimar impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Shalimar impact fee FAQs
What are the total impact fees for a single-family home in Shalimar, Florida?
A new single-family home in Shalimar pays at least $4,800.00 per unit in combined impact fees (rates sourced July 17, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Shalimar?
Commercial development in Shalimar pays no per-square-foot impact fees, but owes $5,000.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Shalimar charge its own impact fees?
Yes. Shalimar levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Shalimar, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Okaloosa County impact fees page.