Jay impact fees by project type
Jay: Single-Family Impact Fees
Jay has no published impact fee amounts for a new single-family home (rates sourced July 18, 2026). The schedule below documents the status of each fee.
Sewer Connection Fee (Town of Jay) and Water Connection Fee (Town of Jay) are set by the utility and not published online. Municipal Impact Fee (Town of Jay) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Jay impact fee schedule
- Water Connection Fee (Town of Jay)Requires confirmationTown of Jay
- Sewer Connection Fee (Town of Jay)Requires confirmationTown of Jay
- Municipal Impact Fee (Town of Jay)Requires confirmationTown of Jay
- County Impact Fees (Jay — N/A in town)$0.00Santa Rosa CountyThe Santa Rosa County Transportation Impact Fee is collected in unincorporated areas only and is not levied inside the Town of Jay. The county school (educational facilities) impact fee has been enjoined since January 2022 and is not currently collected anywhere.
Where in Santa Rosa County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jay: Multifamily Impact Fees
Jay has no published impact fee amounts for a new multifamily unit (rates sourced July 18, 2026). The schedule below documents the status of each fee.
Sewer Connection Fee (Town of Jay, MF) and Water Connection Fee (Town of Jay, MF) are set by the utility and not published online. Municipal Impact Fee (Town of Jay, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Jay impact fee schedule
- Water Connection Fee (Town of Jay, MF)Requires confirmationTown of Jay
- Sewer Connection Fee (Town of Jay, MF)Requires confirmationTown of Jay
- Municipal Impact Fee (Town of Jay, MF)Requires confirmationTown of Jay
- County Impact Fees (Jay — N/A in town, MF)$0.00Santa Rosa CountyThe Santa Rosa County Transportation Impact Fee is collected in unincorporated areas only and is not levied inside the Town of Jay. The county school (educational facilities) impact fee has been enjoined since January 2022 and is not currently collected anywhere.
Where in Santa Rosa County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jay: Commercial Impact Fees
Commercial development in Jay pays no per-square-foot impact fees (rates sourced July 18, 2026).
Water Connection Fee (Town of Jay) and Sewer Connection Fee (Town of Jay) are set by the utility and not published online. Municipal Impact Fee (Town of Jay, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Jay impact fee schedule
- Requires confirmation
- Requires confirmation
- Requires confirmation
- County Impact Fees (Jay — N/A in town, Commercial)$0.00Santa Rosa County's transportation impact fee is collected in unincorporated areas only and does not apply within the Town of Jay.
Where in Santa Rosa County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jay: Industrial Impact Fees
Industrial development in Jay pays no per-square-foot impact fees (rates sourced July 18, 2026).
Water Connection Fee (Town of Jay) and Sewer Connection Fee (Town of Jay) are set by the utility and not published online. Municipal Impact Fee (Town of Jay, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Jay impact fee schedule
- Requires confirmation
- Requires confirmation
- Requires confirmation
- County Impact Fees (Jay — N/A in town, Industrial)$0.00Santa Rosa County's transportation impact fee is collected in unincorporated areas only and does not apply within the Town of Jay.
Where in Santa Rosa County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jay: Office Impact Fees
Office development in Jay pays no per-square-foot impact fees (rates sourced July 18, 2026).
Water Connection Fee (Town of Jay) and Sewer Connection Fee (Town of Jay) are set by the utility and not published online. Municipal Impact Fee (Town of Jay, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Jay impact fee schedule
- Requires confirmation
- Requires confirmation
- Requires confirmation
- County Impact Fees (Jay — N/A in town, Office)$0.00Santa Rosa County's transportation impact fee is collected in unincorporated areas only and does not apply within the Town of Jay.
Where in Santa Rosa County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jay impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Jay impact fee FAQs
How much are commercial impact fees in Jay?
Jay does not currently levy impact fees on commercial development.
Does Jay charge its own impact fees?
Yes. Jay levies its own municipal impact or utility fees. Santa Rosa County does not currently add county-level impact fees inside Jay. The schedule on this page shows every fee that applies to development in Jay.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Santa Rosa County impact fees page.