IMPACTFEES.ORG

Milton, Florida Impact Fees

Milton applies its own fee schedule. Santa Rosa County does not currently add county-level impact fees inside city limits. A new single-family home pays $6,251.14 per unit (rates sourced ). The full breakdown is below.

Milton impact fees by project type

Milton: Single-Family Impact Fees

A new single-family home in Milton pays $6,251.14 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Connection + Impact Fee (City of Milton) ($4,367.86) and Water Connection + Impact Fee (City of Milton) ($1,883.28).

View the full Milton impact fee schedule
Water$1,883.28
  • Water Connection + Impact Fee (City of Milton)
    City of Milton
    City of Milton water connection + impact fee: $1,883.28 for a standard 5/8"–3/4" residential meter ($500 connection + $1,383.28 impact), effective 10/1/2024 (Res. 2024-34); the same inside and outside the city. Larger residential meters add $100–$300 in-city ($150–$375 out-of-city); meters above 2" are billed at commercial rates.
    $1,883.28
Sewer$4,367.86
  • Sewer Connection + Impact Fee (City of Milton)
    City of Milton
    City of Milton sewer connection + impact fee: $4,367.86 for a standard residential connection ($500 connection + $3,867.86 impact), effective 10/1/2024 (Res. 2024-34); the same inside and outside the city. Properties in the Sundial Utilities potable-water area instead pay a $4,430.36 Sundial sewer connection fee.
    $4,367.86
City$0.00
  • Municipal Impact Fee (City of Milton)
    City of Milton
    The City of Milton levies no municipal (non-utility) impact fee — no parks, police, fire, or transportation impact fee. Only the city water and sewer impact fees apply (listed separately).
    $0.00
County$0.00
  • County Impact Fees (Milton — N/A in city)
    Santa Rosa County
    The Santa Rosa County Transportation Impact Fee is collected in unincorporated areas only and is not levied inside the City of Milton. The county school (educational facilities) impact fee has been enjoined since January 2022 and is not currently collected anywhere.
    $0.00
Total (Milton): $6,251.14
Sources last checked Official fee schedules:City of Milton Santa Rosa County

Where in Santa Rosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Milton: Multifamily Impact Fees

A new multifamily unit in Milton pays $6,251.14 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Connection + Impact Fee (City of Milton, MF) ($4,367.86) and Water Connection + Impact Fee (City of Milton, MF) ($1,883.28).

View the full Milton impact fee schedule
Water$1,883.28
  • Water Connection + Impact Fee (City of Milton, MF)
    City of Milton
    City of Milton water connection + impact fee: $1,883.28 per residential connection ($500 connection + $1,383.28 impact), effective 10/1/2024 (Res. 2024-34). Apartments are billed the residential rate per unit; a master-metered project may instead be assessed at commercial rates (by gallons/day).
    $1,883.28
Sewer$4,367.86
  • Sewer Connection + Impact Fee (City of Milton, MF)
    City of Milton
    City of Milton sewer connection + impact fee: $4,367.86 per residential connection ($500 connection + $3,867.86 impact), effective 10/1/2024 (Res. 2024-34). Apartments are billed the residential rate per unit; a master-metered project may instead be assessed at commercial rates (by gallons/day).
    $4,367.86
City$0.00
  • Municipal Impact Fee (City of Milton, MF)
    City of Milton
    The City of Milton levies no municipal (non-utility) impact fee — no parks, police, fire, or transportation impact fee, for multifamily or any use. Only the city water and sewer impact fees apply (listed separately).
    $0.00
County$0.00
  • County Impact Fees (Milton — N/A in city, MF)
    Santa Rosa County
    The Santa Rosa County Transportation Impact Fee is collected in unincorporated areas only and is not levied inside the City of Milton. The county school (educational facilities) impact fee has been enjoined since January 2022 and is not currently collected anywhere.
    $0.00
Total (Milton): $6,251.14
Sources last checked Official fee schedules:City of Milton Santa Rosa County

Where in Santa Rosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Milton: Commercial Impact Fees

Commercial development in Milton pays no per-square-foot impact fees, but owes $6,035.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $6,035.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $14.87) + $500 connection ($4,217.50 one-time) and Water Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $5.27) + $500 connection ($1,817.50 one-time).

View the full Milton impact fee schedule
Water$1,817.50 one-time
Sewer$4,217.50 one-time
City$0.00
County$0.00
Total (Milton): $6,035.00 one-time (≈ $6,035.00 at 50,000 sq ft)
Sources last checked

Where in Santa Rosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Milton: Industrial Impact Fees

Industrial development in Milton pays no per-square-foot impact fees, but owes $6,035.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $6,035.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $14.87) + $500 connection ($4,217.50 one-time) and Water Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $5.27) + $500 connection ($1,817.50 one-time).

View the full Milton impact fee schedule
Water$1,817.50 one-time
Sewer$4,217.50 one-time
City$0.00
County$0.00
Total (Milton): $6,035.00 one-time (≈ $6,035.00 at 50,000 sq ft)
Sources last checked

Where in Santa Rosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Milton: Office Impact Fees

Office development in Milton pays no per-square-foot impact fees, but owes $6,035.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to about $6,035.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $14.87) + $500 connection ($4,217.50 one-time) and Water Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $5.27) + $500 connection ($1,817.50 one-time).

View the full Milton impact fee schedule
Water$1,817.50 one-time
Sewer$4,217.50 one-time
City$0.00
County$0.00
Total (Milton): $6,035.00 one-time (≈ $6,035.00 at 25,000 sq ft)
Sources last checked

Where in Santa Rosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Milton impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Milton impact fee FAQs

What are the total impact fees for a single-family home in Milton, Florida?

A new single-family home in Milton pays $6,251.14 per unit in combined impact fees (rates sourced July 18, 2026).

How much are commercial impact fees in Milton?

Commercial development in Milton pays no per-square-foot impact fees, but owes $6,035.00 in one-time water and sewer connection fees.

Does Milton charge its own impact fees?

Yes. Milton levies its own municipal impact or utility fees. Santa Rosa County does not currently add county-level impact fees inside Milton. The schedule on this page shows every fee that applies to development in Milton.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Santa Rosa County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000