IMPACTFEES.ORG

Milton, Florida Impact Fees

Milton applies its own fee schedule. Santa Rosa County does not currently add county-level impact fees inside city limits. A new single-family home pays $6,251.14 per unit (rates sourced July 18, 2026). The full breakdown is below.

Milton impact fees by project type

Milton: Single-Family Impact Fees

A new single-family home in Milton pays $6,251.14 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Connection + Impact Fee (City of Milton) ($4,367.86) and Water Connection + Impact Fee (City of Milton) ($1,883.28).

View the full fee schedule
Water$1,883.28
  • Water Connection + Impact Fee (City of Milton)
    City of Milton
    CONFIRMED 7/14/2026. Res. No. 2024-34 (adopted 9/5/2024, eff. 10/1/2024), Attachment B 'Water Rates & Fees', Sec. 5 'Connection and Impact Fees'. Residential: connection fee $500.00 (standard 5/8" or 3/4" meter; same inside and outside city) + water impact fee $1,383.28 (same inside/outside) = $1,883.28 total. Res. 2024-34 defines 1 ERU = 250 gpd (100 gal/person x 2.5 persons); no less than 1 ERU may be charged. Larger residential meters add: 1"=+$100 (in) / +$150 (out); 1.5"=+$200/+$250; 2"=+$300/+$375. Meters above 2" are billed at commercial rates (commercial water impact fee = GPD x 5.27). Source PDF is image-only (web_fetch returns empty) — read via the Google Docs viewer 7/14/2026.
    $1,883.28
Sewer$4,367.86
  • Sewer Connection + Impact Fee (City of Milton)
    City of Milton
    CONFIRMED 7/14/2026. Res. No. 2024-34 (adopted 9/5/2024, eff. 10/1/2024), Attachment C 'Sewer Rates & Fees', Sec. 1 'Connection and Impact Fees'. Residential: connection fee $500.00 + sewer impact fee $3,867.86 (both the same inside and outside city) = $4,367.86 total. 1 ERU = 250 gpd; no less than 1 ERU may be charged. Commercial sewer impact fee = GPD x $14.87 (Estimated Flows Chart, Code of Ord. 48.123). SEPARATE: properties in the Sundial Utilities potable-water area pay a Sundial sewer connection fee of $4,430.36 instead. Source PDF is image-only — read via the Google Docs viewer 7/14/2026.
    $4,367.86
City$0.00
  • Municipal Impact Fee (City of Milton)
    City of Milton
    CONFIRMED $0 (7/14/2026) — no municipal non-utility impact fee. Res. No. 2024-34 adopts the City's COMPLETE schedule of fees as Attachments A-K (A solid waste, B water, C sewer, D natural gas, E development review, F business tax, G public safety, H vendors, I code enforcement, J miscellaneous, K parks & community center). The ONLY impact fees anywhere in it are the water and sewer impact fees (Attachments B & C — entered separately). There is no parks, police, fire, or transportation impact fee. The annual Fire Services Assessment (Code Ch. 2, Art. VII, Div. 3) is a recurring annual charge, not a one-time development impact fee (excluded per project rules). Municode Part II also carries no impact-fee chapter.
    $0.00
County$0.00
  • County Impact Fees (Milton — N/A in city)
    Santa Rosa County
    CONFIRMED $0 (re-verified 7/14/2026). The Santa Rosa County Transportation Impact Fee is collected in UNINCORPORATED areas only — the county's own impact-fee page states: 'Fees will be the same and collected throughout the unincorporated areas of the county.' No county overlay is collected inside the City of Milton. The county school impact fee has been enjoined since 1/15/2022 and is not collected anywhere. $0 placeholder documents the check.
    $0.00
Total (Milton): $6,251.14
Sources last checked July 18, 2026Official fee schedules:City of Milton Santa Rosa County

Where in Santa Rosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Milton: Multifamily Impact Fees

A new multifamily unit in Milton pays $6,251.14 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

Water Connection + Impact Fee (City of Milton, MF) and Sewer Connection + Impact Fee (City of Milton, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the full fee schedule
Water$1,883.28
  • Water Connection + Impact Fee (City of Milton, MF)
    City of Milton
    Amount cracked 7/14/2026 (was $0). Res. No. 2024-34 (eff. 10/1/2024), Attachment B Sec. 5: residential connection fee $500.00 + water impact fee $1,383.28 = $1,883.28 per residential connection. MF PER-UNIT BASIS (still UNCONFIRMED — inferred, not stated): the resolution bills apartment complexes at the residential rate per unit — Attachment B Sec. 1(b) expressly charges Whiting Pines Housing 'the residential rate per unit', Attachment D applies the residential gas rate to 'family apartments... using individual meters', and Attachment A carries a separate residential 'Apartments' category. Entered per unit on that basis. However, the resolution never states the MF basis for the IMPACT fee specifically, and a master-metered MF project could instead be assessed as commercial (water impact fee = GPD x 5.27, minimum 1 ERU = 250 gpd). VERIFY: Public Works (850) 983-5410 / Water-Wastewater (850) 983-5461. Source PDF is image-only — read via Google Docs viewer.
    $1,883.28Requires confirmation
Sewer$4,367.86
  • Sewer Connection + Impact Fee (City of Milton, MF)
    City of Milton
    Amount cracked 7/14/2026 (was $0). Res. No. 2024-34 (eff. 10/1/2024), Attachment C Sec. 1: residential connection fee $500.00 + sewer impact fee $3,867.86 = $4,367.86 per residential connection. MF PER-UNIT BASIS (UNCONFIRMED — inferred): Attachment C Sec. 1(b) charges the Whiting Pines Housing apartment complex 'the residential rate per unit', so MF is entered at the residential rate per unit. The resolution does not state the MF basis for the impact fee itself; a master-metered MF project could instead be assessed as commercial (sewer impact fee = GPD x $14.87, min 1 ERU = 250 gpd). VERIFY: Public Works (850) 983-5410. Image-only PDF — read via Google Docs viewer.
    $4,367.86Requires confirmation
City$0.00
  • Municipal Impact Fee (City of Milton, MF)
    City of Milton
    CONFIRMED $0 (7/14/2026). Res. No. 2024-34 adopts the City's complete schedule of fees (Attachments A-K). The only impact fees in it are the water and sewer impact fees (Attachments B & C, entered separately) — there is no parks, police, fire, or transportation impact fee, for MF or any other use. The annual Fire Services Assessment (Code Ch. 2, Art. VII, Div. 3) is a recurring charge, not a one-time development fee (excluded).
    $0.00
County$0.00
  • County Impact Fees (Milton — N/A in city, MF)
    Santa Rosa County
    CONFIRMED $0 (re-verified 7/14/2026). The Santa Rosa County Transportation Impact Fee is collected in UNINCORPORATED areas only ('Fees will be the same and collected throughout the unincorporated areas of the county'), so no county overlay applies to multifamily development inside the City of Milton. County school impact fee enjoined since 1/15/2022. $0 placeholder documents the check.
    $0.00
Total (Milton): $6,251.14
Sources last checked July 18, 2026Official fee schedules:City of Milton Santa Rosa County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Santa Rosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Milton: Commercial Impact Fees

Commercial development in Milton pays no per-square-foot impact fees, but owes $6,035.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $6,035.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $14.87) + $500 connection ($4,217.50 one-time) and Water Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $5.27) + $500 connection ($1,817.50 one-time).

View the full fee schedule
Water$1,817.50 one-time
  • Water Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $5.27) + $500 connection
    Res. 2024-34 (eff. 10/1/2024), Attachment B Sec. 5. COMMERCIAL water impact fee = estimated GPD × $5.27 (Estimated Flows Chart, Code §48.123) + $500 connection fee. 1 ERU = 250 gpd, no less than 1 ERU charged. 1-ERU MINIMUM entered = 250×$5.27 ($1,317.50) + $500 = $1,817.50; larger commercial pays GPD-scaled above this floor. Same inside/outside city. Source PDF image-only (read via Google Docs viewer).
    $1,817.50 one-time
Sewer$4,217.50 one-time
  • Sewer Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $14.87) + $500 connection
    Res. 2024-34 (eff. 10/1/2024), Attachment C Sec. 1. COMMERCIAL sewer impact fee = estimated GPD × $14.87 (Estimated Flows Chart, Code §48.123) + $500 connection fee. 1 ERU = 250 gpd, no less than 1 ERU. 1-ERU MINIMUM entered = 250×$14.87 ($3,717.50) + $500 = $4,217.50; larger commercial pays GPD-scaled above this floor. SEPARATE: properties in the Sundial Utilities potable-water area pay a Sundial sewer connection fee ($4,430.36) instead. Source PDF image-only (Google Docs viewer).
    $4,217.50 one-time
City$0.00
  • Municipal Impact Fee (City of Milton, Commercial)
    CONFIRMED $0 — no municipal non-utility impact fee. Res. 2024-34 adopts the City's COMPLETE fee schedule (Attachments A-K); the only impact fees anywhere are the water & sewer impact fees (W/S table). No parks, police, fire, or transportation impact fee. The annual Fire Services Assessment (Code Ch. 2 Art. VII Div. 3) is a recurring charge, not a one-time development impact fee (excluded). Municode Part II carries no impact-fee chapter.
    $0.00
County$0.00
  • County Impact Fees (Milton — N/A in city, Commercial)
    CONFIRMED $0. County Transportation Impact Fee is collected in UNINCORPORATED areas only — not inside the City of Milton. County school fee enjoined; parks/law-enforcement not adopted. $0 placeholder documents the check.
    $0.00
Total (Milton): $6,035.00 one-time (≈ $6,035.00 at 50,000 sq ft)
Sources last checked July 18, 2026

Where in Santa Rosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Milton: Industrial Impact Fees

Industrial development in Milton pays no per-square-foot impact fees, but owes $6,035.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $6,035.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $14.87) + $500 connection ($4,217.50 one-time) and Water Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $5.27) + $500 connection ($1,817.50 one-time).

View the full fee schedule
Water$1,817.50 one-time
  • Water Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $5.27) + $500 connection
    Res. 2024-34 (eff. 10/1/2024), Attachment B Sec. 5. COMMERCIAL water impact fee = estimated GPD × $5.27 (Estimated Flows Chart, Code §48.123) + $500 connection fee. 1 ERU = 250 gpd, no less than 1 ERU charged. 1-ERU MINIMUM entered = 250×$5.27 ($1,317.50) + $500 = $1,817.50; larger commercial pays GPD-scaled above this floor. Same inside/outside city. Source PDF image-only (read via Google Docs viewer).
    $1,817.50 one-time
Sewer$4,217.50 one-time
  • Sewer Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $14.87) + $500 connection
    Res. 2024-34 (eff. 10/1/2024), Attachment C Sec. 1. COMMERCIAL sewer impact fee = estimated GPD × $14.87 (Estimated Flows Chart, Code §48.123) + $500 connection fee. 1 ERU = 250 gpd, no less than 1 ERU. 1-ERU MINIMUM entered = 250×$14.87 ($3,717.50) + $500 = $4,217.50; larger commercial pays GPD-scaled above this floor. SEPARATE: properties in the Sundial Utilities potable-water area pay a Sundial sewer connection fee ($4,430.36) instead. Source PDF image-only (Google Docs viewer).
    $4,217.50 one-time
City$0.00
County$0.00
Total (Milton): $6,035.00 one-time (≈ $6,035.00 at 50,000 sq ft)
Sources last checked July 18, 2026

Where in Santa Rosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Milton: Office Impact Fees

Office development in Milton pays no per-square-foot impact fees, but owes $6,035.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to about $6,035.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $14.87) + $500 connection ($4,217.50 one-time) and Water Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $5.27) + $500 connection ($1,817.50 one-time).

View the full fee schedule
Water$1,817.50 one-time
  • Water Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $5.27) + $500 connection
    Res. 2024-34 (eff. 10/1/2024), Attachment B Sec. 5. COMMERCIAL water impact fee = estimated GPD × $5.27 (Estimated Flows Chart, Code §48.123) + $500 connection fee. 1 ERU = 250 gpd, no less than 1 ERU charged. 1-ERU MINIMUM entered = 250×$5.27 ($1,317.50) + $500 = $1,817.50; larger commercial pays GPD-scaled above this floor. Same inside/outside city. Source PDF image-only (read via Google Docs viewer).
    $1,817.50 one-time
Sewer$4,217.50 one-time
  • Sewer Connection + Impact Fee (City of Milton) — 1 ERU min (250 gpd × $14.87) + $500 connection
    Res. 2024-34 (eff. 10/1/2024), Attachment C Sec. 1. COMMERCIAL sewer impact fee = estimated GPD × $14.87 (Estimated Flows Chart, Code §48.123) + $500 connection fee. 1 ERU = 250 gpd, no less than 1 ERU. 1-ERU MINIMUM entered = 250×$14.87 ($3,717.50) + $500 = $4,217.50; larger commercial pays GPD-scaled above this floor. SEPARATE: properties in the Sundial Utilities potable-water area pay a Sundial sewer connection fee ($4,430.36) instead. Source PDF image-only (Google Docs viewer).
    $4,217.50 one-time
City$0.00
County$0.00
Total (Milton): $6,035.00 one-time (≈ $6,035.00 at 25,000 sq ft)
Sources last checked July 18, 2026

Where in Santa Rosa County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Milton

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Milton, Florida?

A new single-family home in Milton pays $6,251.14 per unit in combined impact fees (rates sourced July 18, 2026).

How much are commercial impact fees in Milton?

Commercial development in Milton pays no per-square-foot impact fees, but owes $6,035.00 in one-time water and sewer connection fees.

Does Milton charge its own impact fees?

Yes. Milton levies its own municipal impact or utility fees. Santa Rosa County does not currently add county-level impact fees inside Milton. The schedule on this page shows every fee that applies to development in Milton.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Santa Rosa County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000