St. Lucie County impact fees by project type
Where in St. Lucie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated St. Lucie County: Single-Family Impact Fees
A new single-family home in unincorporated St. Lucie County pays at least $13,423.00 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by St. Lucie County.
The largest line items are Water Connection Fee (SLCU) ($5,273.00), Sewer Connection Fee (SLCU) ($4,925.00) and County Parks Impact Fee (SFR) ($2,356.00).
County Road/Transportation Impact Fee (SFR), County School/Educational Impact Fee (SFR), County Library Impact Fee (SFR), and County Fire/EMS Impact Fee (SFR) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (SLCU)$5,273.00St. Lucie County Water & Wastewater DistrictWater Capacity/Connection Fee (CFC) $5,273 per ERC. SLCU Connection Fee Schedule, Resolution No. 25-125, eff Aug 2025. SFR = 1 ERC. Additional: meter install (at cost), water lateral (at cost), $300 application fee, $246.70 guaranteed-revenue fee. Serves unincorporated area; some parcels on private wells.
- Sewer Connection Fee (SLCU)$4,925.00St. Lucie County Water & Wastewater DistrictSewer Capacity/Connection Fee (CFC) $4,925 per ERC. SLCU Connection Fee Schedule, Resolution No. 25-125, eff Aug 2025. SFR = 1 ERC. $330.90 guaranteed-revenue fee additional. Some unincorporated parcels on septic.
- Municipal Impact Fee — N/A (Unincorporated)$0.00St. Lucie County (unincorporated)Unincorporated area — no municipal impact fees. County impact fees apply (see County records). Placeholder documents that municipal fees were checked and none exist.
- County Parks Impact Fee (SFR)$2,356.00St. Lucie CountyCountywide Parks impact fee, SFR $2,356. Phase IV schedule eff 1/1/2026 (2022 Other Fees Study adopted 4/19/2022, Municode Ch. 24). Amount confirmed via City of PSL published DIF schedule (mirrors countywide fee) + FY25 county annual report; county schedule PDF is image-based.
- County Public Buildings Impact Fee (SFR)$516.00St. Lucie CountyCountywide Public Buildings impact fee, SFR $516. Phase IV eff 1/1/2026. Confirmed via City of PSL published DIF schedule + FY25 annual report (fee collected in county/Fort Pierce/PSL). County schedule PDF image-based.
- County Law Enforcement Impact Fee (SFR)$353.00St. Lucie CountyCountywide Law Enforcement impact fee, SFR $353. Phase IV eff 1/1/2026. Confirmed via City of PSL published DIF schedule; county schedule PDF image-based.
- County Road/Transportation Impact Fee (SFR)Requires confirmationSt. Lucie CountyRoad/Multi-Modal Transportation impact fee, by benefit zone. Phase IV schedule eff 1/1/2026; recently updated per 2025 Multi-Modal Transportation Study (Ord. 25-027). County schedule PDF image-based/unreadable — amount unconfirmed. VERIFY: SLCImpactFee@stlucieco.gov / 772-462-1954.
- County School/Educational Impact Fee (SFR)Requires confirmationSt. Lucie County School BoardEducational/School impact fee, collected countywide and forwarded to School Board. Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: stlucie.k12.fl.us / 772-462-1954.
- County Library Impact Fee (SFR)Requires confirmationSt. Lucie CountyLibrary impact fee (by library zone). Phase IV eff 1/1/2026. County schedule PDF image-based — amount unconfirmed. VERIFY: 772-462-1954.
- County Fire/EMS Impact Fee (SFR)Requires confirmationSt. Lucie County Fire DistrictFire/EMS impact fee collected by county for St. Lucie County Fire District (2022 Fire/EMS study). Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: slcfd.com / 772-462-1954.
Where in St. Lucie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated St. Lucie County: Multifamily Impact Fees
A new multifamily unit in unincorporated St. Lucie County pays at least $12,303.00 per unit in impact fees (rates sourced July 18, 2026). All of it is levied by St. Lucie County.
The largest line items are County Parks Impact Fee (MF) ($1,541.00), County Public Buildings Impact Fee (MF) ($337.00) and County Law Enforcement Impact Fee (MF) ($227.00).
Sewer Connection Fee (SLCU) (MF) and Water Connection Fee (SLCU) (MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
County Library Impact Fee (MF), County Road/Transportation Impact Fee (MF), County Fire/EMS Impact Fee (MF), and County School/Educational Impact Fee (MF) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (SLCU) (MF)$5,273.00Requires confirmationSt. Lucie County Water & Wastewater DistrictWater CFC $5,273 per ERC (Res 25-125, eff Aug 2025). MF charged per ERC; per-unit ERC/master-meter factor VERIFY (SLCU 772-462-1150).
- Sewer Connection Fee (SLCU) (MF)$4,925.00Requires confirmationSt. Lucie County Water & Wastewater DistrictSewer CFC $4,925 per ERC (Res 25-125, eff Aug 2025). MF per-unit ERC factor VERIFY (772-462-1150).
- Municipal Impact Fee — N/A (Unincorporated) (MF)$0.00St. Lucie County (unincorporated)Unincorporated area — no municipal impact fees. County impact fees apply. Placeholder documents municipal fees were checked.
- County Parks Impact Fee (MF)$1,541.00St. Lucie CountyCountywide Parks impact fee, MF $1,541/unit. Phase IV eff 1/1/2026. Confirmed via City of PSL published DIF schedule; county schedule PDF image-based.
- County Public Buildings Impact Fee (MF)$337.00St. Lucie CountyCountywide Public Buildings impact fee, MF $337/unit. Phase IV eff 1/1/2026. Confirmed via PSL DIF schedule; county schedule PDF image-based.
- County Law Enforcement Impact Fee (MF)$227.00St. Lucie CountyCountywide Law Enforcement impact fee, MF $227/unit. Phase IV eff 1/1/2026. Confirmed via PSL DIF schedule; county schedule PDF image-based.
- County Library Impact Fee (MF)Requires confirmationSt. Lucie CountyLibrary impact fee (MF). Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
- County Road/Transportation Impact Fee (MF)Requires confirmationSt. Lucie CountyRoad/Multi-Modal impact fee (MF), by benefit zone. Phase IV eff 1/1/2026 (Ord. 25-027). Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
- County Fire/EMS Impact Fee (MF)Requires confirmationSt. Lucie County Fire DistrictFire/EMS impact fee (MF) for St. Lucie County Fire District. Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
- County School/Educational Impact Fee (MF)Requires confirmationSt. Lucie County School BoardEducational/School impact fee (MF), countywide. Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
Where in St. Lucie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated St. Lucie County: Commercial Impact Fees
Commercial development in unincorporated St. Lucie County pays $8.83 per square foot in impact fees, plus $10,198.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $451,509.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity/Connection Fee (SLCU) — 1 ERC ($5,273.00 one-time), Sewer Capacity/Connection Fee (SLCU) — 1 ERC ($4,925.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Commercial) ($7.13/sq ft).
View the full fee schedule
- Water Capacity/Connection Fee (SLCU) — 1 ERC$5,273.00 one-timeSt. Lucie County Utilities (SLCU / Water & Wastewater District) water Capital Facility Charge $5,273/ERC. Connection Fee Schedule, Resolution No. 25-125, eff Aug 2025. Commercial fees calculated per ERC — no published meter→ERC multiplier table (meter install at cost). 1-ERC minimum entered as default. SFR=1 ERC. Serves unincorporated area (some parcels on wells). Commercial min short $1,475/long $1,975.
- Sewer Capacity/Connection Fee (SLCU) — 1 ERC$4,925.00 one-timeSt. Lucie County Utilities (SLCU) sewer Capital Facility Charge $4,925/ERC. Connection Fee Schedule, Res. No. 25-125, eff Aug 2025. Fees per ERC — no published meter→ERC table. 1-ERC minimum entered as default. SFR=1 ERC. Serves unincorporated (some parcels on septic).
- Municipal Impact Fee — N/A (St. Lucie County Unincorporated, Commercial)$0.00Unincorporated area — no municipality, so no municipal (city) impact fee applies. Only St. Lucie County overlay fees apply here. $0 placeholder (confirmed).
- County Roads/Multimodal Impact Fee (St. Lucie County, Commercial)$7.13/sq ftSt. Lucie County multi-modal (roads) impact fee, Code §24-258 (Ord. 2025-27). Unincorporated MAINLAND benefit-zone column, eff 10/1/2025 (steps up 10/1/2026 & 10/1/2027 — recheck). Island parcels (North/Fort Pierce/South Island) use separate lower island columns. Row: ITE 821 Retail 40,000-150,000 sfgla (GLA).
- County Public Buildings Impact Fee (St. Lucie County, Commercial)$0.71/sq ftSt. Lucie County Public Buildings impact fee, Code §24-211 (Oct 1 2025 rate, countywide). Row: Retail under 100,000 sf, per 1,000 sf.
- County Fire/EMS Impact Fee (St. Lucie County, Commercial)$0.62/sq ftSt. Lucie County Fire/EMS impact fee, Code §24-55 (Jan 1 2026 schedule, countywide flat). Row: Retail under 100,000 sf, per 1,000 sf GFA.
- County Law Enforcement Impact Fee (St. Lucie County, Commercial)$0.36/sq ftSt. Lucie County Law Enforcement impact fee, Code §24-95 (Oct 1 2024 rate, countywide sheriff). Row: Retail under 100,000 sf, per 1,000 sf.
- County Library Impact Fee (St. Lucie County, Commercial)$0.00St. Lucie County Library impact fee, Code §24-130 — RESIDENTIAL-ONLY, no nonres rows. Confirmed $0 for nonres.
- County Parks Impact Fee (St. Lucie County, Commercial)$0.00St. Lucie County Parks impact fee, Code §24-172 — RESIDENTIAL-ONLY, no nonres rows. Confirmed $0 for nonres.
Where in St. Lucie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated St. Lucie County: Industrial Impact Fees
Industrial development in unincorporated St. Lucie County pays $1.52 per square foot in impact fees, plus $10,198.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to about $86,060.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity/Connection Fee (SLCU) — 1 ERC ($5,273.00 one-time), Sewer Capacity/Connection Fee (SLCU) — 1 ERC ($4,925.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Industrial) ($1.24/sq ft).
View the full fee schedule
- Water Capacity/Connection Fee (SLCU) — 1 ERC$5,273.00 one-timeSt. Lucie County Utilities (SLCU / Water & Wastewater District) water Capital Facility Charge $5,273/ERC. Connection Fee Schedule, Resolution No. 25-125, eff Aug 2025. Commercial fees calculated per ERC — no published meter→ERC multiplier table (meter install at cost). 1-ERC minimum entered as default. SFR=1 ERC. Serves unincorporated area (some parcels on wells). Commercial min short $1,475/long $1,975.
- Sewer Capacity/Connection Fee (SLCU) — 1 ERC$4,925.00 one-timeSt. Lucie County Utilities (SLCU) sewer Capital Facility Charge $4,925/ERC. Connection Fee Schedule, Res. No. 25-125, eff Aug 2025. Fees per ERC — no published meter→ERC table. 1-ERC minimum entered as default. SFR=1 ERC. Serves unincorporated (some parcels on septic).
- Municipal Impact Fee — N/A (St. Lucie County Unincorporated, Industrial)$0.00Unincorporated area — no municipality; no municipal impact fee. County overlay fees only. $0 placeholder (confirmed).
- County Roads/Multimodal Impact Fee (St. Lucie County, Industrial)$1.24/sq ftSt. Lucie County multi-modal (roads) impact fee, Code §24-258 (Ord. 2025-27). Unincorporated mainland column, eff 10/1/2025 (steps up 10/1/2026 & 10/1/2027). Row: ITE 110 General industrial, per 1,000 sf.
- County Public Buildings Impact Fee (St. Lucie County, Industrial)$0.11/sq ftSt. Lucie County Public Buildings impact fee, Code §24-211 (Oct 1 2025 rate, countywide). Row: General industrial, per 1,000 sf.
- County Fire/EMS Impact Fee (St. Lucie County, Industrial)$0.09/sq ftSt. Lucie County Fire/EMS impact fee, Code §24-55 (Jan 1 2026 schedule, countywide flat). Row: General industrial, per 1,000 sf.
- County Law Enforcement Impact Fee (St. Lucie County, Industrial)$0.07/sq ftSt. Lucie County Law Enforcement impact fee, Code §24-95 (Oct 1 2024 rate, countywide). Row: General industrial, per 1,000 sf.
- County Parks Impact Fee (St. Lucie County, Industrial)$0.00St. Lucie County Parks impact fee, Code §24-172 — RESIDENTIAL-ONLY, no nonres rows. Confirmed $0 for nonres.
- County Library Impact Fee (St. Lucie County, Industrial)$0.00St. Lucie County Library impact fee, Code §24-130 — RESIDENTIAL-ONLY, no nonres rows. Confirmed $0 for nonres.
Where in St. Lucie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated St. Lucie County: Office Impact Fees
Office development in unincorporated St. Lucie County pays $5.54 per square foot in impact fees, plus $10,198.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to about $148,757.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity/Connection Fee (SLCU) — 1 ERC ($5,273.00 one-time), Sewer Capacity/Connection Fee (SLCU) — 1 ERC ($4,925.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Office) ($4.18/sq ft).
View the full fee schedule
- Water Capacity/Connection Fee (SLCU) — 1 ERC$5,273.00 one-timeSt. Lucie County Utilities (SLCU / Water & Wastewater District) water Capital Facility Charge $5,273/ERC. Connection Fee Schedule, Resolution No. 25-125, eff Aug 2025. Commercial fees calculated per ERC — no published meter→ERC multiplier table (meter install at cost). 1-ERC minimum entered as default. SFR=1 ERC. Serves unincorporated area (some parcels on wells). Commercial min short $1,475/long $1,975.
- Sewer Capacity/Connection Fee (SLCU) — 1 ERC$4,925.00 one-timeSt. Lucie County Utilities (SLCU) sewer Capital Facility Charge $4,925/ERC. Connection Fee Schedule, Res. No. 25-125, eff Aug 2025. Fees per ERC — no published meter→ERC table. 1-ERC minimum entered as default. SFR=1 ERC. Serves unincorporated (some parcels on septic).
- Municipal Impact Fee — N/A (St. Lucie County Unincorporated, Office)$0.00Unincorporated area — no municipality; no municipal impact fee. County overlay fees only. $0 placeholder (confirmed).
- County Roads/Multimodal Impact Fee (St. Lucie County, Office)$4.18/sq ftSt. Lucie County multi-modal (roads) impact fee, Code §24-258 (Ord. 2025-27). Unincorporated mainland column, eff 10/1/2025 (steps up 10/1/2026 & 10/1/2027). Island parcels use island columns. Row: ITE 710 General office, per 1,000 sf.
- County Fire/EMS Impact Fee (St. Lucie County, Office)$0.70/sq ftSt. Lucie County Fire/EMS impact fee, Code §24-55 (Jan 1 2026 schedule, countywide flat). Row: General office, per 1,000 sf.
- County Public Buildings Impact Fee (St. Lucie County, Office)$0.48/sq ftSt. Lucie County Public Buildings impact fee, Code §24-211 (Oct 1 2025 rate, countywide). Row: General office, per 1,000 sf.
- County Law Enforcement Impact Fee (St. Lucie County, Office)$0.17/sq ftSt. Lucie County Law Enforcement impact fee, Code §24-95 (Oct 1 2024 rate, countywide). Row: General office, per 1,000 sf.
- County Library Impact Fee (St. Lucie County, Office)$0.00St. Lucie County Library impact fee, Code §24-130 — RESIDENTIAL-ONLY, no nonres rows. Confirmed $0 for nonres.
- County Parks Impact Fee (St. Lucie County, Office)$0.00St. Lucie County Parks impact fee, Code §24-172 — RESIDENTIAL-ONLY, no nonres rows. Confirmed $0 for nonres.
Estimate your project in St. Lucie County
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are single-family impact fees in St. Lucie County, Florida?
A new single-family home in unincorporated St. Lucie County pays at least $13,423.00 per unit in impact fees (rates sourced July 18, 2026). 4 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in St. Lucie County?
Multifamily development in unincorporated St. Lucie County pays at least $12,303.00 per unit in impact fees (rates sourced July 18, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in St. Lucie County?
Commercial development in unincorporated St. Lucie County pays $8.83 per square foot in impact fees, plus $10,198.00 in one-time water and sewer connection fees, about $451,509.50 for a 50,000 sq ft building.
Do cities in St. Lucie County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 2 of 3 cities in St. Lucie County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.