St. Lucie County, Florida Impact Fees

Impact fees in St. Lucie County depend on where you build. This page details the rates for unincorporated St. Lucie County: $27,998.89 per single-family unit as of . Lakewood Park, an unincorporated community, pays these county rates rather than a city schedule. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

St. Lucie County Impact Fees by Project Type

Where in St. Lucie County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Unincorporated St. Lucie County$27,998.89this page
Fort Pierce$24,169.15Port St. Lucie$31,021.39St. Lucie Village$17,800.89

Unincorporated St. Lucie County: Single-Family Impact Fees

A new single-family home in unincorporated St. Lucie County pays $27,998.89 per unit in impact fees (rates sourced October 27, 2026). All of it is levied by St. Lucie County.

The largest line items are County School/Educational Impact Fee (SFR) ($6,786.00), County Multi-Modal Road Impact Fee (SFR) ($6,492.00) and Water Connection Fee — St. Lucie County Utilities ($5,273.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full St. Lucie County Impact Fee Schedule
Water$5,273.00
  • Water Connection Fee — St. Lucie County Utilities
    St. Lucie County Water & Wastewater District
    St. Lucie County Utilities water capacity (connection) fee: $5,273 per ERC (single-family = 1 ERC), Resolution 25-125 effective August 2025. Meter installation and the water lateral are charged at cost. Some unincorporated parcels are served by private wells. In the parts of the unincorporated county that Port St. Lucie Utility Systems serves, its charge applies instead (see the PSL Utility Systems option).
    $5,273.00
Sewer$4,925.00
  • Sewer Connection Fee — St. Lucie County Utilities
    St. Lucie County Water & Wastewater District
    St. Lucie County Utilities wastewater capacity (connection) fee: $4,925 per ERC (single-family = 1 ERC), Resolution 25-125 effective August 2025. Some unincorporated parcels are on septic systems. In the parts of the unincorporated county that Port St. Lucie Utility Systems serves, its charge applies instead (see the PSL Utility Systems option).
    $4,925.00
City$0.00
County$17,800.89
  • County School/Educational Impact Fee (SFR)
    St. Lucie County School Board
    St. Lucie County educational (school) impact fee: $6,786 per single-family dwelling, effective 1/1/2026. Assessed countywide on new residential construction. The schedule is updated around October 1 each year.
    $6,786.00
  • County Multi-Modal Road Impact Fee (SFR)
    Unincorporated zone, SF <2,400 sq ft
    St. Lucie County
    St. Lucie County roads multi-modal impact fee (road capacity, sidewalks, bicycle facilities and transit), unincorporated mainland zone: $6,492 per detached single-family home under 2,400 sq ft, effective October 1, 2026 (Ordinance 2025-27), rising to $7,213 on October 1, 2027. This is the highest of 3 rate zones in the unincorporated area; homes on North and South Hutchinson Island pay less. Larger homes pay more. Income-restricted homes under 2,000 sq ft with deed restrictions pay reduced rates.
    $6,492.00
  • County Parks Impact Fee (SFR)
    St. Lucie County
    St. Lucie County parks & recreation impact fee: $2,560.50 per single-family dwelling, effective 1/1/2026. Updated around October 1 each year.
    $2,560.50
  • County Fire/EMS Impact Fee (SFR)
    St. Lucie County Fire District
    St. Lucie County Fire District impact fee: $650 per single-family dwelling, effective 1/1/2026. Applies countywide (the Fire District serves the entire county).
    $650.00
  • County Public Buildings Impact Fee (SFR)
    St. Lucie County
    St. Lucie County public buildings impact fee: $547.50 per single-family dwelling, effective 1/1/2026.
    $547.50
  • County Library Impact Fee (SFR)
    St. Lucie County
    St. Lucie County library impact fee: $395.89 per single-family dwelling, effective 1/1/2026. Updated around October 1 each year.
    $395.89
  • County Law Enforcement Impact Fee (SFR)
    St. Lucie County
    St. Lucie County law enforcement impact fee: $369.00 per single-family dwelling, effective 1/1/2026.
    $369.00
Total (unincorporated St. Lucie County): $27,998.89

Where in St. Lucie County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Unincorporated St. Lucie County$21,216.00this page
Fort Pierce$16,177.52Port St. Lucie$24,415.75St. Lucie Village$11,018.00

Unincorporated St. Lucie County: Multifamily Impact Fees

A new multifamily unit in unincorporated St. Lucie County pays $21,216.00 per unit in impact fees (rates sourced October 27, 2026). All of it is levied by St. Lucie County.

The largest line items are Water Connection Fee (MF) — St. Lucie County Utilities ($5,273.00), Sewer Connection Fee (MF) — St. Lucie County Utilities ($4,925.00) and County Multi-Modal Road Impact Fee (MF) ($3,578.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full St. Lucie County Impact Fee Schedule
Water$5,273.00
  • Water Connection Fee (MF) — St. Lucie County Utilities
    St. Lucie County Water & Wastewater District
    St. Lucie County Utilities water capacity fee: $5,273 per ERC (Resolution 25-125, effective August 2025). Multifamily is charged per ERC; a master-metered building's per-unit charge scales with its total ERCs. In the parts of the unincorporated county that Port St. Lucie Utility Systems serves, its charge applies instead (see the PSL Utility Systems option).
    $5,273.00
Sewer$4,925.00
  • Sewer Connection Fee (MF) — St. Lucie County Utilities
    St. Lucie County Water & Wastewater District
    St. Lucie County Utilities wastewater capacity fee: $4,925 per ERC (Resolution 25-125, effective August 2025). Multifamily is charged per ERC; a master-metered building's per-unit charge scales with its total ERCs. In the parts of the unincorporated county that Port St. Lucie Utility Systems serves, its charge applies instead (see the PSL Utility Systems option).
    $4,925.00
City$0.00
County$11,018.00
  • County Multi-Modal Road Impact Fee (MF)
    Unincorporated zone, MF 4+ stories, 750-1,499 sq ft
    St. Lucie County
    St. Lucie County roads multi-modal impact fee (road capacity, sidewalks, bicycle facilities and transit), unincorporated mainland zone: $3,578 per unit of 750 to 1,499 sq ft in a building of 4 or more stories, effective October 1, 2026 (Ordinance 2025-27), rising to $3,976 on October 1, 2027. The mainland and both Hutchinson Island zones charge this same rate for this unit size, the highest of 3 rate zones in the unincorporated area. Rates vary by building height and unit size (1 to 3 story buildings pay more).
    $3,578.00
  • County School/Educational Impact Fee (MF)
    St. Lucie County School Board
    St. Lucie County educational (school) impact fee: $3,470 per multifamily dwelling unit, effective 1/1/2026. Assessed countywide.
    $3,470.00
  • County Parks Impact Fee (MF)
    St. Lucie County
    St. Lucie County parks & recreation impact fee: $2,284.50 per multifamily dwelling unit, effective 1/1/2026.
    $2,284.50
  • County Fire/EMS Impact Fee (MF)
    3+ stories
    St. Lucie County Fire District
    St. Lucie County Fire District impact fee: $637 per multifamily unit (buildings 3+ stories; 1-2 story buildings $502), effective 1/1/2026. Applies countywide.
    $637.00
  • County Public Buildings Impact Fee (MF)
    St. Lucie County
    St. Lucie County public buildings impact fee: $490.50 per multifamily dwelling unit, effective 1/1/2026.
    $490.50
  • County Library Impact Fee (MF)
    3+ stories
    St. Lucie County
    St. Lucie County library impact fee: $295.50 per multifamily unit (buildings 3+ stories; 1-2 story buildings $288), effective 1/1/2026.
    $295.50
  • County Law Enforcement Impact Fee (MF)
    3+ stories
    St. Lucie County
    St. Lucie County law enforcement impact fee: $262.50 per multifamily unit (buildings 3+ stories; 1-2 story $256.50), effective 1/1/2026.
    $262.50
Total (unincorporated St. Lucie County): $21,216.00

Where in St. Lucie County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated St. Lucie County: Commercial Impact Fees

Commercial development in unincorporated St. Lucie County pays $9.75 per square foot in impact fees, plus $10,198.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $497,663.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC ($5,273.00 one-time), Sewer Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC ($4,925.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Commercial) ($8.02/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full St. Lucie County Impact Fee Schedule
Water$5,273.00 one-time
  • Water Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC
    St. Lucie County Utilities water capital facility (connection) charge, $5,273 per ERC (Resolution No. 25-127). Nonresidential charges are assessed by ERC; the amount shown is the 1 ERC minimum. Meter installation is charged at cost. Applies where St. Lucie County Utilities provides service. In the parts of the unincorporated county that Port St. Lucie Utility Systems serves, its charge applies instead (see the PSL Utility Systems option).
    $5,273.00 one-time
Sewer$4,925.00 one-time
  • Sewer Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC
    St. Lucie County Utilities wastewater capital facility (connection) charge, $4,925 per ERC (Resolution No. 25-127). Nonresidential charges are assessed by ERC; the amount shown is the 1 ERC minimum. Meter installation is charged at cost. Applies where St. Lucie County Utilities provides service. In the parts of the unincorporated county that Port St. Lucie Utility Systems serves, its charge applies instead (see the PSL Utility Systems option).
    $4,925.00 one-time
City$0.00
County$9.75/sq ft
  • County Roads/Multimodal Impact Fee (St. Lucie County, Commercial)
    Mainland — 40,000–150,000 SFGLA
    St. Lucie County roads (multi-modal) impact fee at the unincorporated mainland rate, for retail of 40,000 to 150,000 sq ft of gross leasable area, per 1,000 sq ft GLA, effective October 1, 2026 (Ordinance 2025-27, 2025 impact fee study); a further scheduled step takes effect October 1, 2027. Charged countywide, including within the cities. Highest of 3 rate districts in the unincorporated area (mainland, North Island, South Island); island parcels pay lower rates. Retail under 40,000 or over 150,000 sq ft GLA pays different rates.
    $8.02/sq ft
  • County Public Buildings Impact Fee (St. Lucie County, Commercial)
    Retail <100,000 SF
    St. Lucie County public buildings impact fee, charged per 1,000 sq ft of retail, based on the county's 2022 impact fee study and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities. This rate is for retail buildings under 100,000 sq ft; retail of 100,000 to 499,999 sq ft and of 500,000 sq ft or more pays different rates.
    $0.71/sq ft
  • County Fire/EMS Impact Fee (St. Lucie County, Commercial)
    St. Lucie County fire/EMS impact fee, charged per 1,000 sq ft of retail, based on the 2022 fire/EMS impact fee study adopted September 6, 2022 and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities.
    $0.62/sq ft
  • County Law Enforcement Impact Fee (St. Lucie County, Commercial)
    Retail <100,000 SF
    St. Lucie County law enforcement impact fee, charged per 1,000 sq ft of retail, based on the county's 2022 impact fee study and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities. This rate is for retail buildings under 100,000 sq ft; retail of 100,000 to 499,999 sq ft and of 500,000 sq ft or more pays different rates.
    $0.39/sq ft
  • County Library Impact Fee (St. Lucie County, Commercial)
    County library impact fee is not levied on nonresidential development (residential-only).
    $0.00
  • County Parks Impact Fee (St. Lucie County, Commercial)
    County parks impact fee is not levied on nonresidential development (residential-only).
    $0.00
Total (unincorporated St. Lucie County): $9.75/sq ft + $10,198.00 one-time (≈ $497,663.00 at 50,000 sq ft)
Sources last checked
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in St. Lucie County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated St. Lucie County: Industrial Impact Fees

Industrial development in unincorporated St. Lucie County pays $1.68 per square foot in impact fees, plus $10,198.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $94,148.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC ($5,273.00 one-time), Sewer Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC ($4,925.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Industrial) ($1.40/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full St. Lucie County Impact Fee Schedule
Water$5,273.00 one-time
  • Water Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC
    St. Lucie County Utilities water capital facility (connection) charge, $5,273 per ERC (Resolution No. 25-127). Nonresidential charges are assessed by ERC; the amount shown is the 1 ERC minimum. Meter installation is charged at cost. Applies where St. Lucie County Utilities provides service. In the parts of the unincorporated county that Port St. Lucie Utility Systems serves, its charge applies instead (see the PSL Utility Systems option).
    $5,273.00 one-time
Sewer$4,925.00 one-time
  • Sewer Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC
    St. Lucie County Utilities wastewater capital facility (connection) charge, $4,925 per ERC (Resolution No. 25-127). Nonresidential charges are assessed by ERC; the amount shown is the 1 ERC minimum. Meter installation is charged at cost. Applies where St. Lucie County Utilities provides service. In the parts of the unincorporated county that Port St. Lucie Utility Systems serves, its charge applies instead (see the PSL Utility Systems option).
    $4,925.00 one-time
City$0.00
County$1.68/sq ft
  • County Roads/Multimodal Impact Fee (St. Lucie County, Industrial)
    Mainland
    St. Lucie County roads (multi-modal) impact fee at the unincorporated mainland rate, for general industrial use, per 1,000 sq ft, effective October 1, 2026 (Ordinance 2025-27, 2025 impact fee study); a further scheduled step takes effect October 1, 2027. Charged countywide, including within the cities. Highest of 3 rate districts in the unincorporated area (mainland, North Island, South Island); island parcels pay lower rates. Eligible projects may qualify for the county's Targeted Industry Program.
    $1.40/sq ft
  • County Public Buildings Impact Fee (St. Lucie County, Industrial)
    St. Lucie County public buildings impact fee, charged per 1,000 sq ft of general industrial use, based on the county's 2022 impact fee study and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities.
    $0.11/sq ft
  • County Fire/EMS Impact Fee (St. Lucie County, Industrial)
    St. Lucie County fire/EMS impact fee, charged per 1,000 sq ft of general industrial use, based on the 2022 fire/EMS impact fee study adopted September 6, 2022 and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities.
    $0.09/sq ft
  • County Law Enforcement Impact Fee (St. Lucie County, Industrial)
    St. Lucie County law enforcement impact fee, charged per 1,000 sq ft of general industrial use, based on the county's 2022 impact fee study and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities.
    $0.08/sq ft
  • County Parks Impact Fee (St. Lucie County, Industrial)
    County parks impact fee is not levied on nonresidential development (residential-only).
    $0.00
  • County Library Impact Fee (St. Lucie County, Industrial)
    County library impact fee is not levied on nonresidential development (residential-only).
    $0.00
Total (unincorporated St. Lucie County): $1.68/sq ft + $10,198.00 one-time (≈ $94,148.00 at 50,000 sq ft)
Sources last checked
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in St. Lucie County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated St. Lucie County: Office Impact Fees

Office development in unincorporated St. Lucie County pays $6.06 per square foot in impact fees, plus $10,198.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to about $161,807.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC ($5,273.00 one-time), Sewer Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC ($4,925.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Office) ($4.71/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full St. Lucie County Impact Fee Schedule
Water$5,273.00 one-time
  • Water Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC
    St. Lucie County Utilities water capital facility (connection) charge, $5,273 per ERC (Resolution No. 25-127). Nonresidential charges are assessed by ERC; the amount shown is the 1 ERC minimum. Meter installation is charged at cost. Applies where St. Lucie County Utilities provides service. In the parts of the unincorporated county that Port St. Lucie Utility Systems serves, its charge applies instead (see the PSL Utility Systems option).
    $5,273.00 one-time
Sewer$4,925.00 one-time
  • Sewer Capacity/Connection Fee — St. Lucie County Utilities, 1 ERC
    St. Lucie County Utilities wastewater capital facility (connection) charge, $4,925 per ERC (Resolution No. 25-127). Nonresidential charges are assessed by ERC; the amount shown is the 1 ERC minimum. Meter installation is charged at cost. Applies where St. Lucie County Utilities provides service. In the parts of the unincorporated county that Port St. Lucie Utility Systems serves, its charge applies instead (see the PSL Utility Systems option).
    $4,925.00 one-time
City$0.00
County$6.06/sq ft
  • County Roads/Multimodal Impact Fee (St. Lucie County, Office)
    Mainland
    St. Lucie County roads (multi-modal) impact fee at the unincorporated mainland rate, for general office, per 1,000 sq ft, effective October 1, 2026 (Ordinance 2025-27, 2025 impact fee study); a further scheduled step takes effect October 1, 2027. Charged countywide, including within the cities. Highest of 3 rate districts in the unincorporated area (mainland, North Island, South Island); island parcels pay lower rates. Eligible projects may qualify for the county's Targeted Industry Program.
    $4.71/sq ft
  • County Fire/EMS Impact Fee (St. Lucie County, Office)
    St. Lucie County fire/EMS impact fee, charged per 1,000 sq ft of general office, based on the 2022 fire/EMS impact fee study adopted September 6, 2022 and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities.
    $0.70/sq ft
  • County Public Buildings Impact Fee (St. Lucie County, Office)
    St. Lucie County public buildings impact fee, charged per 1,000 sq ft of general office, based on the county's 2022 impact fee study and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities.
    $0.48/sq ft
  • County Law Enforcement Impact Fee (St. Lucie County, Office)
    St. Lucie County law enforcement impact fee, charged per 1,000 sq ft of general office, based on the county's 2022 impact fee study and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities.
    $0.17/sq ft
  • County Library Impact Fee (St. Lucie County, Office)
    County library impact fee is not levied on nonresidential development (residential-only).
    $0.00
  • County Parks Impact Fee (St. Lucie County, Office)
    County parks impact fee is not levied on nonresidential development (residential-only).
    $0.00
Total (unincorporated St. Lucie County): $6.06/sq ft + $10,198.00 one-time (≈ $161,807.50 at 25,000 sq ft)
Sources last checked
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

St. Lucie County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

St. Lucie County Impact Fee FAQs

What are single-family impact fees in St. Lucie County, Florida?

A new single-family home in unincorporated St. Lucie County pays $27,998.89 per unit in impact fees (rates sourced October 27, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in St. Lucie County?

Multifamily development in unincorporated St. Lucie County pays $21,216.00 per unit in impact fees (rates sourced October 27, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in St. Lucie County?

Commercial development in unincorporated St. Lucie County pays $9.75 per square foot in impact fees, plus $10,198.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $497,663.00 for a 50,000 sq ft building.

Does Lakewood Park pay St. Lucie County impact fees?

Yes. Lakewood Park is unincorporated, so new construction there pays the unincorporated St. Lucie County schedule on this page, not a city schedule. Search a specific address in the calculator below to confirm it sits outside every city limit.

Do cities in St. Lucie County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 2 of 3 cities in St. Lucie County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.