Skip to content
IMPACTFEES.ORG

Port St. Lucie, Florida Impact Fees

Port St. Lucie applies its own fee schedule: municipal fees plus the St. Lucie County-levied fees that apply inside city limits. Combined, a new single-family home pays $31,021.39 per unit (rates sourced ). The full breakdown is below.

Port St. Lucie Impact Fees by Project Type

Port St. Lucie: Single-Family Impact Fees

A new single-family home in Port St. Lucie pays $31,021.39 per unit in impact fees (rates sourced October 27, 2026). Of that, St. Lucie County-levied fees account for $13,625.89 and municipal or utility fees for $17,395.50.

The largest line items are County School/Educational Impact Fee (SFR) ($6,786.00), Water Connection Fee (SFR - Port St. Lucie) ($5,705.00) and Sewer Connection Fee (SFR - Port St. Lucie) ($5,222.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Port St. Lucie Impact Fee Schedule
Water$5,705.00
  • Water Connection Fee (SFR - Port St. Lucie)
    Port St. Lucie
    Port St. Lucie Utility Systems water reservation (capacity) charge: $5,705 per ERC (single-family = 1 ERC; treatment plant capacity $4,925 plus line capacity $780), FY 2026-27 fee schedule. Properties in a special assessment or utility service area pay a reduced new-construction charge. A 5/8 inch meter installation ($1,366) and backflow assembly ($408) are additional.
    $5,705.00
Sewer$5,222.00
  • Sewer Connection Fee (SFR - Port St. Lucie)
    Port St. Lucie
    Port St. Lucie Utility Systems wastewater reservation (capacity) charge: $5,222 per ERC (single-family = 1 ERC; treatment plant capacity $3,250 plus line capacity $1,972), FY 2026-27 fee schedule. Properties in a special assessment or utility service area pay a reduced new-construction charge. In low-pressure sewer areas the grinder tank system is an additional charge.
    $5,222.00
City$6,468.50
  • Mobility Fee (City of Port St. Lucie)
    East of I-95
    City of Port St. Lucie mobility fee: $1.60 per square foot in the East of I-95 assessment area (the highest of three areas; Southwest of I-95 $1.13 and Northwest of I-95 $1.42 per sq ft), assessed up to 3,500 sq ft, so $3,200 for a 2,000 sq ft single-family home, effective October 1, 2022. It is charged in addition to the St. Lucie County multi-modal road impact fee collected within Port St. Lucie.
    $3,200.00
  • Parks Impact Fee (SFR)
    Port St. Lucie
    City of Port St. Lucie parks and recreation impact fee: $2,356 per single-family dwelling, effective June 30, 2026 through June 29, 2027 (city Development Impact Fees schedule). This city fee is charged in addition to the St. Lucie County parks impact fee.
    $2,356.00
  • Public Buildings Impact Fee (SFR)
    Port St. Lucie
    City of Port St. Lucie public buildings impact fee: $565.50 per single-family dwelling, effective November 1, 2025 through October 31, 2026 (Ordinance 25-42), rising to $615.00 on November 1, 2026. This city fee is charged in addition to the St. Lucie County public buildings impact fee.
    $565.50
  • Law Enforcement Impact Fee (SFR)
    Port St. Lucie
    City of Port St. Lucie law enforcement impact fee: $347 per single-family dwelling, effective June 30, 2026 through June 29, 2027 (city Development Impact Fees schedule). This city fee is charged in addition to the St. Lucie County law enforcement impact fee.
    $347.00
County$13,625.89
  • County School/Educational Impact Fee (SFR)
    St. Lucie County School Board
    St. Lucie County educational (school) impact fee: $6,786 per single-family dwelling, effective 1/1/2026. Assessed countywide including within Port St. Lucie.
    $6,786.00
  • County Parks Impact Fee (SFR)
    St. Lucie County parks impact fee: $2,560.50 per single-family dwelling, effective 1/1/2026. Collected countywide including within Port St. Lucie; the City of Port St. Lucie's own parks impact fee is separate and additional.
    $2,560.50
  • County Multi-Modal Road Impact Fee (SFR)
    City of PSL zone, SF <2,400 sq ft
    St. Lucie County
    St. Lucie County roads multi-modal impact fee, City of Port St. Lucie zone: $2,317 per detached single-family home under 2,400 sq ft, effective October 1, 2026 (Ordinance 2025-27), rising to $2,575 on October 1, 2027. Larger homes pay more. It is charged in addition to the city's own mobility fee. Income-restricted homes under 2,000 sq ft with deed restrictions pay reduced rates.
    $2,317.00
  • County Fire/EMS Impact Fee (SFR)
    St. Lucie County Fire District
    St. Lucie County Fire District impact fee: $650 per single-family dwelling, effective 1/1/2026 (applies countywide including Port St. Lucie).
    $650.00
  • County Public Buildings Impact Fee (SFR)
    St. Lucie County public buildings impact fee: $547.50 per single-family dwelling, effective 1/1/2026. Collected countywide including within Port St. Lucie; the City of Port St. Lucie's own public buildings impact fee is separate and additional.
    $547.50
  • County Library Impact Fee (SFR)
    St. Lucie County
    St. Lucie County library impact fee: $395.89 per single-family dwelling, effective 1/1/2026.
    $395.89
  • County Law Enforcement Impact Fee (SFR)
    St. Lucie County law enforcement impact fee: $369.00 per single-family dwelling, effective 1/1/2026. Collected countywide including within Port St. Lucie; the City of Port St. Lucie's own law enforcement impact fee is separate and additional.
    $369.00
Total (Port St. Lucie): $31,021.39
Sources last checked Official fee schedules:Port St. Lucie St. Lucie County School Board St. Lucie County St. Lucie County Fire District

Where in St. Lucie County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Port St. Lucie: Multifamily Impact Fees

A new multifamily unit in Port St. Lucie pays $24,415.75 per unit in impact fees (rates sourced October 27, 2026). Of that, St. Lucie County-levied fees account for $8,712.00 and municipal or utility fees for $15,703.75.

The largest line items are Water Connection Fee (City of Port St. Lucie, MF) ($5,705.00), Sewer Connection Fee (City of Port St. Lucie, MF) ($5,222.00) and County School/Educational Impact Fee (MF) ($3,470.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Port St. Lucie Impact Fee Schedule
Water$5,705.00
  • Water Connection Fee (City of Port St. Lucie, MF)
    Port St. Lucie
    Port St. Lucie Utility Systems water reservation (capacity) charge: $5,705 per ERC (treatment plant capacity $4,925 plus line capacity $780), FY 2026-27 fee schedule. Multifamily units are charged by the ERC factor the city assigns to the unit. Properties in a special assessment or utility service area pay a reduced new-construction charge. Meter and backflow installation are additional.
    $5,705.00
Sewer$5,222.00
  • Sewer Connection Fee (City of Port St. Lucie, MF)
    Port St. Lucie
    Port St. Lucie Utility Systems wastewater reservation (capacity) charge: $5,222 per ERC (treatment plant capacity $3,250 plus line capacity $1,972), FY 2026-27 fee schedule. Multifamily units are charged by the ERC factor the city assigns to the unit. Properties in a special assessment or utility service area pay a reduced new-construction charge. In low-pressure sewer areas the grinder tank system is an additional charge.
    $5,222.00
City$4,776.75
  • Mobility Fee (City of Port St. Lucie, MF)
    East of I-95
    City of Port St. Lucie mobility fee: $2.65 per square foot in the East of I-95 assessment area (the highest of three areas; Southwest of I-95 $1.87 and Northwest of I-95 $2.34 per sq ft), assessed up to 2,500 sq ft, so $2,650 for a 1,000 sq ft multifamily unit, effective October 1, 2022. It is charged in addition to the St. Lucie County multi-modal road impact fee collected within Port St. Lucie.
    $2,650.00
  • Parks Impact Fee (MF)
    Port St. Lucie
    City of Port St. Lucie parks and recreation impact fee: $1,541 per multifamily unit, effective June 30, 2026 through June 29, 2027 (city Development Impact Fees schedule). This city fee is charged in addition to the St. Lucie County parks impact fee.
    $1,541.00
  • Public Buildings Impact Fee (MF)
    Port St. Lucie
    City of Port St. Lucie public buildings impact fee: $362.75 per multifamily unit, effective November 1, 2025 through October 31, 2026 (Ordinance 25-42), then $388.50 from November 1, 2026, $414.25 from November 1, 2027 and $440.00 from November 1, 2028. This city fee is charged in addition to the St. Lucie County public buildings impact fee.
    $362.75
  • Law Enforcement Impact Fee (MF)
    Port St. Lucie
    City of Port St. Lucie law enforcement impact fee: $223 per multifamily unit, effective June 30, 2026 through June 29, 2027 (city Development Impact Fees schedule). This city fee is charged in addition to the St. Lucie County law enforcement impact fee.
    $223.00
County$8,712.00
  • County School/Educational Impact Fee (MF)
    St. Lucie County School Board
    St. Lucie County educational (school) impact fee: $3,470 per multifamily dwelling unit, effective 1/1/2026. Assessed countywide including within Port St. Lucie.
    $3,470.00
  • County Parks Impact Fee (MF)
    St. Lucie County parks impact fee: $2,284.50 per multifamily unit, effective 1/1/2026. Collected countywide including within Port St. Lucie; the City of Port St. Lucie's own parks impact fee is separate and additional.
    $2,284.50
  • County Multi-Modal Road Impact Fee (MF)
    City of PSL zone, MF 4+ stories, 750-1,499 sq ft
    St. Lucie County
    St. Lucie County roads multi-modal impact fee, City of Port St. Lucie zone: $1,272 per unit of 750 to 1,499 sq ft in a building of 4 or more stories, effective October 1, 2026 (Ordinance 2025-27), rising to $1,413 on October 1, 2027. Rates vary by building height and unit size (1 to 3 story buildings pay more). It is charged in addition to the city's own mobility fee.
    $1,272.00
  • County Fire/EMS Impact Fee (MF)
    3+ stories
    St. Lucie County Fire District
    St. Lucie County Fire District impact fee: $637 per multifamily unit (3+ stories; 1-2 story $502), effective 1/1/2026 (countywide incl. Port St. Lucie).
    $637.00
  • County Public Buildings Impact Fee (MF)
    St. Lucie County public buildings impact fee: $490.50 per multifamily unit, effective 1/1/2026. Collected countywide including within Port St. Lucie; the City of Port St. Lucie's own public buildings impact fee is separate and additional.
    $490.50
  • County Library Impact Fee (MF)
    3+ stories
    St. Lucie County
    St. Lucie County library impact fee: $295.50 per multifamily unit (3+ stories; 1-2 story $288), effective 1/1/2026.
    $295.50
  • County Law Enforcement Impact Fee (MF)
    3+ stories
    St. Lucie County law enforcement impact fee: $262.50 per multifamily unit (buildings 3+ stories; 1-2 story $256.50), effective 1/1/2026. Collected countywide including within Port St. Lucie; the City of Port St. Lucie's own law enforcement impact fee is separate and additional.
    $262.50
Total (Port St. Lucie): $24,415.75
Sources last checked Official fee schedules:Port St. Lucie St. Lucie County School Board St. Lucie County St. Lucie County Fire District

Where in St. Lucie County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours.

Port St. Lucie: Commercial Impact Fees

Commercial development in Port St. Lucie pays $10.18 per square foot in impact fees, plus $12,402.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $521,617.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,705.00 one-time), Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,222.00 one-time) and Water Meter Installation Fee (PSL Utility Systems) — 1" meter ($1,475.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Port St. Lucie Impact Fee Schedule
Water$7,180.00 one-time
  • Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    Port St. Lucie Utility Systems water reservation (capacity) charge, $5,705 per ERC (treatment plant capacity $4,925 plus line capacity $780), Fiscal Year 2026-27 fee schedule. Nonresidential ERCs are assigned by estimated demand; the amount shown is the 1 ERC minimum. Properties in a special assessment or utility service area pay a reduced new-construction charge. Meter installation and backflow assembly installation fees by meter size are additional.
    $5,705.00 one-time
  • Water Meter Installation Fee (PSL Utility Systems) — 1" meter
    City of Port St. Lucie Utility Systems Department
    Port St. Lucie Utility Systems meter installation fee for a 1 inch meter (City Code Sec. 61.05), Fiscal Year 2026-27 fee schedule. Charged in addition to the water and wastewater reservation (capacity) charges. Meters larger than 2 inches are purchased and installed by the applicant, and a backflow prevention assembly installation fee by meter size also applies.
    $1,475.00 one-time
Sewer$5,222.00 one-time
  • Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    Port St. Lucie Utility Systems wastewater reservation (capacity) charge, $5,222 per ERC (treatment plant capacity $3,250 plus line capacity $1,972), Fiscal Year 2026-27 fee schedule. Nonresidential ERCs are assigned by estimated demand; the amount shown is the 1 ERC minimum. Properties in a special assessment or utility service area pay a reduced new-construction charge. Meter installation and backflow assembly installation fees by meter size are additional.
    $5,222.00 one-time
City$5.74/sq ft
  • Mobility Fee (City of Port St. Lucie, Commercial)
    East of I-95
    City of Port St. Lucie
    City of Port St. Lucie mobility fee, $4.78 per sq ft of multi-tenant retail (a building with two or more separate uses where no single use exceeds 75% of the floor area) in the East of I-95 assessment area, per the 2022 Mobility Fee Schedule (City Code Table 159.108.1, Ordinances 21-75 and 22-87, effective October 1, 2022), for developments without a city credit agreement. Highest of 3 assessment areas (East, Southwest and Northwest of I-95). Local (non-chain) retail and free-standing retail pay different rates, and drive-through lanes, fueling or charging positions and service bays pay additive fees. Charged in addition to the St. Lucie County roads impact fee.
    $4.78/sq ft
  • Law Enforcement Impact Fee (City of Port St. Lucie, Commercial)
    City of Port St. Lucie law enforcement impact fee, charged per 1,000 sq ft of gross floor area at the nonresidential rate effective June 30, 2026 through June 29, 2027. Charged in addition to the St. Lucie County law enforcement impact fee.
    $0.79/sq ft
  • Public Buildings Impact Fee (City of Port St. Lucie, Commercial)
    City of Port St. Lucie public buildings impact fee, charged per 1,000 sq ft of gross floor area at the nonresidential rate effective June 30, 2026 through June 29, 2027. Charged in addition to the St. Lucie County public buildings impact fee.
    $0.17/sq ft
  • Parks Impact Fee (City of Port St. Lucie, Commercial)
    Not levied on nonresidential development: the City of Port St. Lucie parks impact fee is charged on dwelling units only.
    $0.00
County$4.44/sq ft
  • County Roads/Multimodal Impact Fee (St. Lucie County, Commercial)
    40,000–150,000 SFGLA
    St. Lucie County roads (multi-modal) impact fee at the City of Port St. Lucie rate, for retail of 40,000 to 150,000 sq ft of gross leasable area, per 1,000 sq ft GLA, effective October 1, 2026 (Ordinance 2025-27, 2025 impact fee study); a further scheduled step takes effect October 1, 2027. Charged countywide, including within the cities. Retail under 40,000 or over 150,000 sq ft GLA pays different rates.
    $2.71/sq ft
  • County Public Buildings Impact Fee (St. Lucie County, Commercial)
    Retail <100,000 SF
    St. Lucie County public buildings impact fee, charged per 1,000 sq ft of retail, based on the county's 2022 impact fee study and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities. This rate is for retail buildings under 100,000 sq ft; retail of 100,000 to 499,999 sq ft and of 500,000 sq ft or more pays different rates.
    $0.71/sq ft
  • County Fire/EMS Impact Fee (St. Lucie County, Commercial)
    St. Lucie County fire/EMS impact fee, charged per 1,000 sq ft of retail, based on the 2022 fire/EMS impact fee study adopted September 6, 2022 and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities.
    $0.62/sq ft
  • County Law Enforcement Impact Fee (St. Lucie County, Commercial)
    Retail <100,000 SF
    St. Lucie County law enforcement impact fee, charged per 1,000 sq ft of retail, based on the county's 2022 impact fee study and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities. This rate is for retail buildings under 100,000 sq ft; retail of 100,000 to 499,999 sq ft and of 500,000 sq ft or more pays different rates.
    $0.39/sq ft
  • County Parks Impact Fee (St. Lucie County, Commercial)
    County parks impact fee is not levied on nonresidential development (residential-only).
    $0.00
  • County Library Impact Fee (St. Lucie County, Commercial)
    County library impact fee is not levied on nonresidential development (residential-only).
    $0.00
Total (Port St. Lucie): $10.18/sq ft + $12,402.00 one-time (≈ $521,617.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Port St. Lucie Utility Systems Department City of Port St. Lucie
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in St. Lucie County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port St. Lucie: Industrial Impact Fees

Industrial development in Port St. Lucie pays $1.88 per square foot in impact fees, plus $12,402.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $106,452.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,705.00 one-time), Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,222.00 one-time) and Water Meter Installation Fee (PSL Utility Systems) — 1" meter ($1,475.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Port St. Lucie Impact Fee Schedule
Water$7,180.00 one-time
  • Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    Port St. Lucie Utility Systems water reservation (capacity) charge, $5,705 per ERC (treatment plant capacity $4,925 plus line capacity $780), Fiscal Year 2026-27 fee schedule. Nonresidential ERCs are assigned by estimated demand; the amount shown is the 1 ERC minimum. Properties in a special assessment or utility service area pay a reduced new-construction charge. Meter installation and backflow assembly installation fees by meter size are additional.
    $5,705.00 one-time
  • Water Meter Installation Fee (PSL Utility Systems) — 1" meter
    City of Port St. Lucie Utility Systems Department
    Port St. Lucie Utility Systems meter installation fee for a 1 inch meter (City Code Sec. 61.05), Fiscal Year 2026-27 fee schedule. Charged in addition to the water and wastewater reservation (capacity) charges. Meters larger than 2 inches are purchased and installed by the applicant, and a backflow prevention assembly installation fee by meter size also applies.
    $1,475.00 one-time
Sewer$5,222.00 one-time
  • Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    Port St. Lucie Utility Systems wastewater reservation (capacity) charge, $5,222 per ERC (treatment plant capacity $3,250 plus line capacity $1,972), Fiscal Year 2026-27 fee schedule. Nonresidential ERCs are assigned by estimated demand; the amount shown is the 1 ERC minimum. Properties in a special assessment or utility service area pay a reduced new-construction charge. Meter installation and backflow assembly installation fees by meter size are additional.
    $5,222.00 one-time
City$1.10/sq ft
  • Mobility Fee (City of Port St. Lucie, Industrial)
    Northwest of I-95
    City of Port St. Lucie
    City of Port St. Lucie mobility fee, $0.74 per sq ft of industrial space (assembly, fabrication, manufacturing, research and development, trades, utilities) in the Northwest of I-95 assessment area, per the 2022 Mobility Fee Schedule (City Code Table 159.108.1, Ordinances 21-75 and 22-87, effective October 1, 2022), for developments without a city credit agreement. Highest of 3 assessment areas (East, Southwest and Northwest of I-95). Warehouse, storage and distribution uses pay different rates. Charged in addition to the St. Lucie County roads impact fee.
    $0.74/sq ft
  • Public Buildings Impact Fee (City of Port St. Lucie, Industrial)
    City of Port St. Lucie public buildings impact fee, charged per 1,000 sq ft of gross floor area at the nonresidential rate effective June 30, 2026 through June 29, 2027. Charged in addition to the St. Lucie County public buildings impact fee.
    $0.20/sq ft
  • Law Enforcement Impact Fee (City of Port St. Lucie, Industrial)
    City of Port St. Lucie law enforcement impact fee, charged per 1,000 sq ft of gross floor area at the nonresidential rate effective June 30, 2026 through June 29, 2027. Charged in addition to the St. Lucie County law enforcement impact fee.
    $0.16/sq ft
  • Parks Impact Fee (City of Port St. Lucie, Industrial)
    Not levied on nonresidential development: the City of Port St. Lucie parks impact fee is charged on dwelling units only.
    $0.00
County$0.78/sq ft
Total (Port St. Lucie): $1.88/sq ft + $12,402.00 one-time (≈ $106,452.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Port St. Lucie Utility Systems Department City of Port St. Lucie
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in St. Lucie County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port St. Lucie: Office Impact Fees

Office development in Port St. Lucie pays $6.53 per square foot in impact fees, plus $12,402.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to about $175,661.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,705.00 one-time), Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,222.00 one-time) and Water Meter Installation Fee (PSL Utility Systems) — 1" meter ($1,475.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Port St. Lucie Impact Fee Schedule
Water$7,180.00 one-time
  • Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    Port St. Lucie Utility Systems water reservation (capacity) charge, $5,705 per ERC (treatment plant capacity $4,925 plus line capacity $780), Fiscal Year 2026-27 fee schedule. Nonresidential ERCs are assigned by estimated demand; the amount shown is the 1 ERC minimum. Properties in a special assessment or utility service area pay a reduced new-construction charge. Meter installation and backflow assembly installation fees by meter size are additional.
    $5,705.00 one-time
  • Water Meter Installation Fee (PSL Utility Systems) — 1" meter
    City of Port St. Lucie Utility Systems Department
    Port St. Lucie Utility Systems meter installation fee for a 1 inch meter (City Code Sec. 61.05), Fiscal Year 2026-27 fee schedule. Charged in addition to the water and wastewater reservation (capacity) charges. Meters larger than 2 inches are purchased and installed by the applicant, and a backflow prevention assembly installation fee by meter size also applies.
    $1,475.00 one-time
Sewer$5,222.00 one-time
  • Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    Port St. Lucie Utility Systems wastewater reservation (capacity) charge, $5,222 per ERC (treatment plant capacity $3,250 plus line capacity $1,972), Fiscal Year 2026-27 fee schedule. Nonresidential ERCs are assigned by estimated demand; the amount shown is the 1 ERC minimum. Properties in a special assessment or utility service area pay a reduced new-construction charge. Meter installation and backflow assembly installation fees by meter size are additional.
    $5,222.00 one-time
City$3.50/sq ft
  • Mobility Fee (City of Port St. Lucie, Office)
    Northwest of I-95
    City of Port St. Lucie
    City of Port St. Lucie mobility fee, $2.85 per sq ft of office space (general, professional, bank, medical and dental office) in the Northwest of I-95 assessment area, per the 2022 Mobility Fee Schedule (City Code Table 159.108.1, Ordinances 21-75 and 22-87, effective October 1, 2022), for developments without a city credit agreement. Highest of 3 assessment areas (East, Southwest and Northwest of I-95). Free-standing medical office pays a different rate. Charged in addition to the St. Lucie County roads impact fee.
    $2.85/sq ft
  • Law Enforcement Impact Fee (City of Port St. Lucie, Office)
    City of Port St. Lucie law enforcement impact fee, charged per 1,000 sq ft of gross floor area at the nonresidential rate effective June 30, 2026 through June 29, 2027. Charged in addition to the St. Lucie County law enforcement impact fee.
    $0.36/sq ft
  • Public Buildings Impact Fee (City of Port St. Lucie, Office)
    City of Port St. Lucie public buildings impact fee, charged per 1,000 sq ft of gross floor area at the nonresidential rate effective June 30, 2026 through June 29, 2027. Charged in addition to the St. Lucie County public buildings impact fee.
    $0.29/sq ft
  • Parks Impact Fee (City of Port St. Lucie, Office)
    Not levied on nonresidential development: the City of Port St. Lucie parks impact fee is charged on dwelling units only.
    $0.00
County$3.03/sq ft
  • County Roads/Multimodal Impact Fee (St. Lucie County, Office)
    St. Lucie County roads (multi-modal) impact fee at the City of Port St. Lucie rate, for general office, per 1,000 sq ft, effective October 1, 2026 (Ordinance 2025-27, 2025 impact fee study); a further scheduled step takes effect October 1, 2027. Charged countywide, including within the cities. Eligible projects may qualify for the county's Targeted Industry Program.
    $1.68/sq ft
  • County Fire/EMS Impact Fee (St. Lucie County, Office)
    St. Lucie County fire/EMS impact fee, charged per 1,000 sq ft of general office, based on the 2022 fire/EMS impact fee study adopted September 6, 2022 and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities.
    $0.70/sq ft
  • County Public Buildings Impact Fee (St. Lucie County, Office)
    St. Lucie County public buildings impact fee, charged per 1,000 sq ft of general office, based on the county's 2022 impact fee study and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities.
    $0.48/sq ft
  • County Law Enforcement Impact Fee (St. Lucie County, Office)
    St. Lucie County law enforcement impact fee, charged per 1,000 sq ft of general office, based on the county's 2022 impact fee study and printed on the county schedule for October 1, 2026 through September 30, 2027. Charged countywide, including within the cities.
    $0.17/sq ft
  • County Parks Impact Fee (St. Lucie County, Office)
    County parks impact fee is not levied on nonresidential development (residential-only).
    $0.00
  • County Library Impact Fee (St. Lucie County, Office)
    County library impact fee is not levied on nonresidential development (residential-only).
    $0.00
Total (Port St. Lucie): $6.53/sq ft + $12,402.00 one-time (≈ $175,661.50 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Port St. Lucie Utility Systems Department City of Port St. Lucie
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in St. Lucie County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port St. Lucie Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Port St. Lucie Impact Fee FAQs

What are the total impact fees for a single-family home in Port St. Lucie, Florida?

A new single-family home in Port St. Lucie pays $31,021.39 per unit in combined impact fees (rates sourced October 27, 2026).

How much are commercial impact fees in Port St. Lucie?

Commercial development in Port St. Lucie pays $10.18 per square foot in impact fees, plus $12,402.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $521,617.00 for a 50,000 sq ft building.

Does Port St. Lucie charge its own impact fees?

Yes. Port St. Lucie levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Port St. Lucie, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the St. Lucie County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000