IMPACTFEES.ORG

Port St. Lucie, Florida Impact Fees

Port St. Lucie applies its own fee schedule: municipal fees plus the St. Lucie County-levied fees that apply inside city limits. Combined, a new single-family home pays $24,043.89 per unit (rates sourced July 28, 2026). The full breakdown is below.

Port St. Lucie impact fees by project type

Port St. Lucie: Single-Family Impact Fees

A new single-family home in Port St. Lucie pays $24,043.89 per unit in impact fees (rates sourced July 28, 2026). Of that, St. Lucie County-levied fees account for $9,891.89 and municipal or utility fees for $14,152.00.

The largest line items are County School/Educational Impact Fee (SFR) ($6,786.00), Water Connection Fee (SFR - Port St. Lucie) ($5,705.00) and Sewer Connection Fee (SFR - Port St. Lucie) ($5,222.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$5,705.00
  • Water Connection Fee (SFR - Port St. Lucie)
    Port St. Lucie
    PSL Utility Systems water capacity/reservation charge $5,705/ERC = Treatment Plant Capacity $4,925 (City Code Sec 61.11) + Line Capacity $780 (Sec 61.24). PSLUSD Fee Schedule rev 10/02/2025. Additional: 5/8" meter install $1,320 + backflow $394. Updated from prior $7,256 (older customer-service guide). SFR = 1 ERC.
    $5,705.00
Sewer$5,222.00
  • Sewer Connection Fee (SFR - Port St. Lucie)
    Port St. Lucie
    PSL Utility Systems wastewater capacity/reservation charge $5,222/ERC = Treatment Plant Capacity $3,250 (Sec 61.11) + Line Capacity $1,972 (Sec 61.24). PSLUSD Fee Schedule rev 10/02/2025. Updated from prior $8,258 (older guide). SFR = 1 ERC.
    $5,222.00
City$3,225.00
  • Parks Impact Fee (SFR)
    Port St. Lucie
    City of PSL Parks impact fee, SFR $2,356 (Development Impact Fees schedule eff 6/30/2025-6/29/2026, rev 5/1/2025). CORRECTED from $1,541 which was the multifamily rate. Mobile home = $1,904.
    $2,356.00
  • Public Buildings Impact Fee (SFR)
    Port St. Lucie
    City of PSL Public Buildings impact fee, SFR $516 (DIF schedule eff 6/30/2025-6/29/2026). CORRECTED from $337 which was the multifamily rate. Mobile home = $417.
    $516.00
  • Law Enforcement Impact Fee (SFR)
    Port St. Lucie
    City of PSL Law Enforcement impact fee, SFR $353 (DIF schedule eff 6/30/2025-6/29/2026). CORRECTED from $227 which was the multifamily rate. Mobile home = $298.
    $353.00
County$9,891.89
  • County School/Educational Impact Fee (SFR)
    St. Lucie County School Board
    SLC County Educational/School impact fee = $6,786 per SF dwelling, eff 1/1/2026. Collected within PSL, forwarded to school district. Source: county 1/1/2026 rate sheet.
    $6,786.00
  • County Road/Transportation Impact Fee (SFR)
    City of PSL zone, SF <2,400 sq ft
    St. Lucie County
    SLC County Road Impact Fee, City of PSL benefit zone, SF <2,400 sqft = $2,060, eff 1/1/2026 (2,400-3,499 $2,519; 3,500+ $2,564). PSL ALSO levies its own Mobility fee (separate city record). Source: county 1/1/2026 rate sheet.
    $2,060.00
  • County Fire/EMS Impact Fee (SFR)
    St. Lucie County Fire District
    SLC County Fire/EMS impact fee = $650 per SF dwelling, eff 1/1/2026. St. Lucie County Fire District serves PSL. Source: county 1/1/2026 rate sheet.
    $650.00
  • County Library Impact Fee (SFR)
    St. Lucie County
    SLC County Library impact fee = $395.89 per SF dwelling, eff 1/1/2026. PSL served by county library system. Source: county 1/1/2026 rate sheet.
    $395.89
Total (Port St. Lucie): $24,043.89
Sources last checked July 28, 2026Official fee schedules:Port St. Lucie St. Lucie County School Board St. Lucie County St. Lucie County Fire District

Where in St. Lucie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Port St. Lucie: Multifamily Impact Fees

A new multifamily unit in Port St. Lucie pays $18,565.50 per unit in impact fees (rates sourced July 28, 2026). Of that, St. Lucie County-levied fees account for $5,533.50 and municipal or utility fees for $13,032.00.

The largest line items are Water Connection Fee (USA/SAD Area - 5/8" meter) (MF) ($5,705.00), Sewer Connection Fee (USA/SAD Area - Low Pressure) (MF) ($5,222.00) and County School/Educational Impact Fee (MF) ($3,470.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$5,705.00
  • Water Connection Fee (USA/SAD Area - 5/8" meter) (MF)
    Port St. Lucie
    VERIFIED 8/3/2026. PSL USA/SAD water connection $5,705.00 per ERC = WTP Capacity $4,925 (Sec 61.11) + Water Line Capacity $780 (Sec 61.24), unchanged on the fee schedule Rev 04/16/2026 (PSLUSD 85-100). MF ERC QUESTION RESOLVED by the city's published ERC Determination Table (PSLUSD Doc 23, per Code 61.11): MF NON-master-metered = 1.0 ERC → $5,705/unit (this record's individually-metered 5/8" framing); MF MASTER-metered 2BR or >750 sf = 0.9 ERC → $5,134.50/unit (1BR ≤750 sf = 0.5 ERC → $2,852.50). Canonical 2BR/1,000sf master-metered unit would be $5,134.50 — this record carries the individually-metered value per its name.
    $5,705.00
Sewer$5,222.00
  • Sewer Connection Fee (USA/SAD Area - Low Pressure) (MF)
    Port St. Lucie
    VERIFIED 8/4/2026 (PSLUSD No. 85-100, Rev 4/16/2026): wastewater reservation $3,250.00/ERC treatment (Sec. 61.11) + $1,972.00/ERC line capacity (Sec. 61.24) = $5,222/ERC. ⚠️ Low-pressure grinder equipment ($15,825–$16,183/system) is ADDITIONAL. (772) 871-5330.
    $5,222.00
City$2,105.00
  • Parks Impact Fee (MF)
    Port St. Lucie
    City of PSL Parks impact fee, MF $1,541/unit (DIF schedule eff 6/30/2025-6/29/2026, rev 5/1/2025). SFR = $2,356; Mobile = $1,904.
    $1,541.00
  • Public Buildings Impact Fee (MF)
    Port St. Lucie
    City of PSL Public Buildings impact fee, MF $337/unit (DIF schedule eff 6/30/2025-6/29/2026). SFR = $516; Mobile = $417.
    $337.00
  • Law Enforcement Impact Fee (MF)
    Port St. Lucie
    City of PSL Law Enforcement impact fee, MF $227/unit (DIF schedule eff 6/30/2025-6/29/2026). SFR = $353; Mobile = $298.
    $227.00
County$5,533.50
  • County School/Educational Impact Fee (MF)
    St. Lucie County School Board
    SLC County Educational/School impact fee (MF) = $3,470 per unit, eff 1/1/2026. Collected within PSL. Source: county 1/1/2026 rate sheet.
    $3,470.00
  • County Road/Transportation Impact Fee (MF)
    City of PSL zone, MF 4+ stories 750-1,499 sq ft
    St. Lucie County
    SLC County Road Impact Fee (MF), City of PSL zone, 4+ stories 750-1,499 sqft = $1,131, eff 1/1/2026 (1-3 story $1,589). PSL also levies its own Mobility fee. Source: county 1/1/2026 rate sheet.
    $1,131.00
  • County Fire/EMS Impact Fee (MF)
    St. Lucie County Fire District
    SLC County Fire/EMS impact fee (MF, 3+ stories) = $637 per unit, eff 1/1/2026 (1-2 story $502). SLC Fire District serves PSL. Source: county 1/1/2026 rate sheet.
    $637.00
  • County Library Impact Fee (MF)
    St. Lucie County
    SLC County Library impact fee (MF, 3+ stories) = $295.50 per unit, eff 1/1/2026 (1-2 story $288). PSL served by county library. Source: county 1/1/2026 rate sheet.
    $295.50
Total (Port St. Lucie): $18,565.50
Sources last checked July 28, 2026Official fee schedules:Port St. Lucie St. Lucie County School Board St. Lucie County St. Lucie County Fire District

Where in St. Lucie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours.

Port St. Lucie: Commercial Impact Fees

Commercial development in Port St. Lucie pays $5.07 per square foot in impact fees, plus $10,927.00 in one-time water and sewer connection fees (rates sourced July 28, 2026).

For a 50,000 sq ft building, that comes to about $264,188.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,705.00 one-time), Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,222.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Commercial) ($2.41/sq ft).

View the full fee schedule
Water$5,705.00 one-time
  • Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems (PSLUSD) water reservation charge per ERC = Treatment Plant Capacity $4,925 (Code §61.11) + Line Capacity $780 (§61.24) = $5,705/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs assigned by estimated demand — no published meter→ERC table (meter install fees separate: 1"=$1,320). 1-ERC minimum entered as default; multiply by ERC count for larger. SFR=1 ERC.
    $5,705.00 one-time
Sewer$5,222.00 one-time
  • Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems wastewater reservation charge per ERC = Treatment Plant Capacity $3,250 (Code §61.11) + Line Capacity $1,972 (§61.24) = $5,222/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs by estimated demand; no published meter→ERC table. 1-ERC minimum entered as default. SFR=1 ERC.
    $5,222.00 one-time
City$0.96/sq ft
County$4.11/sq ft
Total (Port St. Lucie): $5.07/sq ft + $10,927.00 one-time (≈ $264,188.50 at 50,000 sq ft)
Sources last checked July 28, 2026

Where in St. Lucie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port St. Lucie: Industrial Impact Fees

Industrial development in Port St. Lucie pays $1.06 per square foot in impact fees, plus $10,927.00 in one-time water and sewer connection fees (rates sourced July 28, 2026).

For a 50,000 sq ft building, that comes to about $64,089.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,705.00 one-time), Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,222.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Industrial) ($0.44/sq ft).

View the full fee schedule
Water$5,705.00 one-time
  • Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems (PSLUSD) water reservation charge per ERC = Treatment Plant Capacity $4,925 (Code §61.11) + Line Capacity $780 (§61.24) = $5,705/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs assigned by estimated demand — no published meter→ERC table (meter install fees separate: 1"=$1,320). 1-ERC minimum entered as default; multiply by ERC count for larger. SFR=1 ERC.
    $5,705.00 one-time
Sewer$5,222.00 one-time
  • Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems wastewater reservation charge per ERC = Treatment Plant Capacity $3,250 (Code §61.11) + Line Capacity $1,972 (§61.24) = $5,222/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs by estimated demand; no published meter→ERC table. 1-ERC minimum entered as default. SFR=1 ERC.
    $5,222.00 one-time
City$0.35/sq ft
County$0.72/sq ft
Total (Port St. Lucie): $1.06/sq ft + $10,927.00 one-time (≈ $64,089.50 at 50,000 sq ft)
Sources last checked July 28, 2026

Where in St. Lucie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port St. Lucie: Office Impact Fees

Office development in Port St. Lucie pays $3.47 per square foot in impact fees, plus $10,927.00 in one-time water and sewer connection fees (rates sourced July 28, 2026).

For a 25,000 sq ft building, that comes to about $97,686.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,705.00 one-time), Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,222.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Office) ($1.49/sq ft).

View the full fee schedule
Water$5,705.00 one-time
  • Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems (PSLUSD) water reservation charge per ERC = Treatment Plant Capacity $4,925 (Code §61.11) + Line Capacity $780 (§61.24) = $5,705/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs assigned by estimated demand — no published meter→ERC table (meter install fees separate: 1"=$1,320). 1-ERC minimum entered as default; multiply by ERC count for larger. SFR=1 ERC.
    $5,705.00 one-time
Sewer$5,222.00 one-time
  • Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems wastewater reservation charge per ERC = Treatment Plant Capacity $3,250 (Code §61.11) + Line Capacity $1,972 (§61.24) = $5,222/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs by estimated demand; no published meter→ERC table. 1-ERC minimum entered as default. SFR=1 ERC.
    $5,222.00 one-time
City$0.62/sq ft
County$2.85/sq ft
Total (Port St. Lucie): $3.47/sq ft + $10,927.00 one-time (≈ $97,686.50 at 25,000 sq ft)
Sources last checked July 28, 2026

Where in St. Lucie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Port St. Lucie

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Port St. Lucie, Florida?

A new single-family home in Port St. Lucie pays $24,043.89 per unit in combined impact fees (rates sourced July 28, 2026).

How much are commercial impact fees in Port St. Lucie?

Commercial development in Port St. Lucie pays $5.07 per square foot in impact fees, plus $10,927.00 in one-time water and sewer connection fees, about $264,188.50 for a 50,000 sq ft building.

Does Port St. Lucie charge its own impact fees?

Yes. Port St. Lucie levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Port St. Lucie, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the St. Lucie County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000