Port St. Lucie, Florida Impact Fees

Port St. Lucie applies its own fee schedule: municipal fees plus the St. Lucie County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $14,152.00 per unit (rates sourced July 18, 2026). 4 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Port St. Lucie impact fees by project type

Port St. Lucie: Single-Family Impact Fees

A new single-family home in Port St. Lucie pays at least $14,152.00 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Connection Fee (SFR - Port St. Lucie) ($5,705.00), Sewer Connection Fee (SFR - Port St. Lucie) ($5,222.00) and Parks Impact Fee (SFR) ($2,356.00).

County School/Educational Impact Fee (SFR), County Library Impact Fee (SFR), County Road/Transportation Impact Fee (SFR), and County Fire/EMS Impact Fee (SFR) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$5,705.00
  • Water Connection Fee (SFR - Port St. Lucie)
    Port St. Lucie
    PSL Utility Systems water capacity/reservation charge $5,705/ERC = Treatment Plant Capacity $4,925 (City Code Sec 61.11) + Line Capacity $780 (Sec 61.24). PSLUSD Fee Schedule rev 10/02/2025. Additional: 5/8" meter install $1,320 + backflow $394. Updated from prior $7,256 (older customer-service guide). SFR = 1 ERC.
    $5,705.00
Sewer$5,222.00
  • Sewer Connection Fee (SFR - Port St. Lucie)
    Port St. Lucie
    PSL Utility Systems wastewater capacity/reservation charge $5,222/ERC = Treatment Plant Capacity $3,250 (Sec 61.11) + Line Capacity $1,972 (Sec 61.24). PSLUSD Fee Schedule rev 10/02/2025. Updated from prior $8,258 (older guide). SFR = 1 ERC.
    $5,222.00
City$3,225.00
  • Parks Impact Fee (SFR)
    Port St. Lucie
    City of PSL Parks impact fee, SFR $2,356 (Development Impact Fees schedule eff 6/30/2025-6/29/2026, rev 5/1/2025). CORRECTED from $1,541 which was the multifamily rate. Mobile home = $1,904.
    $2,356.00
  • Public Buildings Impact Fee (SFR)
    Port St. Lucie
    City of PSL Public Buildings impact fee, SFR $516 (DIF schedule eff 6/30/2025-6/29/2026). CORRECTED from $337 which was the multifamily rate. Mobile home = $417.
    $516.00
  • Law Enforcement Impact Fee (SFR)
    Port St. Lucie
    City of PSL Law Enforcement impact fee, SFR $353 (DIF schedule eff 6/30/2025-6/29/2026). CORRECTED from $227 which was the multifamily rate. Mobile home = $298.
    $353.00
County$0.00
  • County School/Educational Impact Fee (SFR)
    St. Lucie County School Board
    Educational/School impact fee, countywide (collected within PSL). Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
    Requires confirmation
  • County Library Impact Fee (SFR)
    St. Lucie County
    County Library impact fee (by zone; PSL is served by county library system). Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
    Requires confirmation
  • County Road/Transportation Impact Fee (SFR)
    St. Lucie County
    County Road/Multi-Modal impact fee — schedule has a City of Port St. Lucie benefit-zone rate; PSL also administers a Mobility Plan. Phase IV eff 1/1/2026 (Ord. 25-027). Image-based schedule — amount + which applies unconfirmed. VERIFY: PSL Planning 772-871-5212 / county 772-462-1954.
    Requires confirmation
  • County Fire/EMS Impact Fee (SFR)
    St. Lucie County Fire District
    Fire/EMS impact fee for St. Lucie County Fire District (serves PSL). Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
    Requires confirmation
Total (Port St. Lucie): $14,152.00
Sources last checked July 18, 2026Official fee schedules:Port St. Lucie St. Lucie County School Board St. Lucie County St. Lucie County Fire District
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in St. Lucie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port St. Lucie: Multifamily Impact Fees

A new multifamily unit in Port St. Lucie pays at least $13,032.00 per unit in impact fees (rates sourced July 18, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Parks Impact Fee ($1,541.00), Public Buildings Impact Fee ($337.00) and Law Enforcement Impact Fee ($227.00).

Water Connection Fee (USA/SAD Area - 5/8" meter) and Sewer Connection Fee (USA/SAD Area - Low Pressure) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

County School/Educational Impact Fee (MF), County Road/Transportation Impact Fee (MF), County Fire/EMS Impact Fee (MF), and County Library Impact Fee (MF) are set by the county and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$5,705.00
  • Water Connection Fee (USA/SAD Area - 5/8" meter)
    Port St. Lucie
    PSL Utility Systems water capacity/reservation $5,705/ERC = Treatment Plant $4,925 (Sec 61.11) + Line $780 (Sec 61.24). PSLUSD Fee Schedule rev 10/02/2025. Updated from prior $7,256. MF charged per ERC; per-unit ERC/master-meter factor VERIFY (772-873-6400).
    $5,705.00Requires confirmation
Sewer$5,222.00
  • Sewer Connection Fee (USA/SAD Area - Low Pressure)
    Port St. Lucie
    PSL Utility Systems wastewater capacity/reservation $5,222/ERC = Treatment Plant $3,250 (Sec 61.11) + Line $1,972 (Sec 61.24). PSLUSD Fee Schedule rev 10/02/2025. Updated from prior $8,258. MF per-unit ERC factor VERIFY (772-873-6400).
    $5,222.00Requires confirmation
City$2,105.00
  • Parks Impact Fee
    Port St. Lucie
    City of PSL Parks impact fee, MF $1,541/unit (DIF schedule eff 6/30/2025-6/29/2026, rev 5/1/2025). SFR = $2,356; Mobile = $1,904.
    $1,541.00
  • Public Buildings Impact Fee
    Port St. Lucie
    City of PSL Public Buildings impact fee, MF $337/unit (DIF schedule eff 6/30/2025-6/29/2026). SFR = $516; Mobile = $417.
    $337.00
  • Law Enforcement Impact Fee
    Port St. Lucie
    City of PSL Law Enforcement impact fee, MF $227/unit (DIF schedule eff 6/30/2025-6/29/2026). SFR = $353; Mobile = $298.
    $227.00
County$0.00
  • County School/Educational Impact Fee (MF)
    St. Lucie County School Board
    Educational/School impact fee (MF), countywide (collected within PSL). Phase IV eff 1/1/2026. Image-based — amount unconfirmed. VERIFY: 772-462-1954.
    Requires confirmation
  • County Road/Transportation Impact Fee (MF)
    St. Lucie County
    County Road/Multi-Modal impact fee (MF) — PSL benefit-zone rate; PSL also has a Mobility Plan. Phase IV eff 1/1/2026 (Ord. 25-027). Image-based — amount + which applies unconfirmed. VERIFY: PSL 772-871-5212 / county 772-462-1954.
    Requires confirmation
  • County Fire/EMS Impact Fee (MF)
    St. Lucie County Fire District
    Fire/EMS impact fee (MF) for SLC Fire District (serves PSL). Phase IV eff 1/1/2026. Image-based — amount unconfirmed. VERIFY: 772-462-1954.
    Requires confirmation
  • County Library Impact Fee (MF)
    St. Lucie County
    Library impact fee (MF; PSL served by county library system). Phase IV eff 1/1/2026. Image-based — amount unconfirmed. VERIFY: 772-462-1954.
    Requires confirmation
Total (Port St. Lucie): $13,032.00
Sources last checked July 18, 2026Official fee schedules:Port St. Lucie St. Lucie County School Board St. Lucie County St. Lucie County Fire District
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in St. Lucie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port St. Lucie: Commercial Impact Fees

Commercial development in Port St. Lucie pays $5.07 per square foot in impact fees, plus $10,927.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $264,188.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,705.00 one-time), Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,222.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Commercial) ($2.41/sq ft).

View the full fee schedule
Water$5,705.00 one-time
  • Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems (PSLUSD) water reservation charge per ERC = Treatment Plant Capacity $4,925 (Code §61.11) + Line Capacity $780 (§61.24) = $5,705/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs assigned by estimated demand — no published meter→ERC table (meter install fees separate: 1"=$1,320). 1-ERC minimum entered as default; multiply by ERC count for larger. SFR=1 ERC.
    $5,705.00 one-time
Sewer$5,222.00 one-time
  • Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems wastewater reservation charge per ERC = Treatment Plant Capacity $3,250 (Code §61.11) + Line Capacity $1,972 (§61.24) = $5,222/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs by estimated demand; no published meter→ERC table. 1-ERC minimum entered as default. SFR=1 ERC.
    $5,222.00 one-time
City$0.96/sq ft
County$4.11/sq ft
Total (Port St. Lucie): $5.07/sq ft + $10,927.00 one-time (≈ $264,188.50 at 50,000 sq ft)
Sources last checked July 18, 2026

Where in St. Lucie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port St. Lucie: Industrial Impact Fees

Industrial development in Port St. Lucie pays $1.06 per square foot in impact fees, plus $10,927.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 50,000 sq ft building, that comes to about $64,089.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,705.00 one-time), Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,222.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Industrial) ($0.44/sq ft).

View the full fee schedule
Water$5,705.00 one-time
  • Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems (PSLUSD) water reservation charge per ERC = Treatment Plant Capacity $4,925 (Code §61.11) + Line Capacity $780 (§61.24) = $5,705/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs assigned by estimated demand — no published meter→ERC table (meter install fees separate: 1"=$1,320). 1-ERC minimum entered as default; multiply by ERC count for larger. SFR=1 ERC.
    $5,705.00 one-time
Sewer$5,222.00 one-time
  • Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems wastewater reservation charge per ERC = Treatment Plant Capacity $3,250 (Code §61.11) + Line Capacity $1,972 (§61.24) = $5,222/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs by estimated demand; no published meter→ERC table. 1-ERC minimum entered as default. SFR=1 ERC.
    $5,222.00 one-time
City$0.35/sq ft
County$0.72/sq ft
Total (Port St. Lucie): $1.06/sq ft + $10,927.00 one-time (≈ $64,089.50 at 50,000 sq ft)
Sources last checked July 18, 2026

Where in St. Lucie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Port St. Lucie: Office Impact Fees

Office development in Port St. Lucie pays $3.47 per square foot in impact fees, plus $10,927.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).

For a 25,000 sq ft building, that comes to about $97,686.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,705.00 one-time), Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC ($5,222.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Office) ($1.49/sq ft).

View the full fee schedule
Water$5,705.00 one-time
  • Water Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems (PSLUSD) water reservation charge per ERC = Treatment Plant Capacity $4,925 (Code §61.11) + Line Capacity $780 (§61.24) = $5,705/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs assigned by estimated demand — no published meter→ERC table (meter install fees separate: 1"=$1,320). 1-ERC minimum entered as default; multiply by ERC count for larger. SFR=1 ERC.
    $5,705.00 one-time
Sewer$5,222.00 one-time
  • Sewer Reservation/Capacity Charge (PSL Utility Systems) — 1 ERC
    PSL Utility Systems wastewater reservation charge per ERC = Treatment Plant Capacity $3,250 (Code §61.11) + Line Capacity $1,972 (§61.24) = $5,222/ERC. PSLUSD Fee Schedule rev 10/2/2025. Nonres ERCs by estimated demand; no published meter→ERC table. 1-ERC minimum entered as default. SFR=1 ERC.
    $5,222.00 one-time
City$0.62/sq ft
County$2.85/sq ft
Total (Port St. Lucie): $3.47/sq ft + $10,927.00 one-time (≈ $97,686.50 at 25,000 sq ft)
Sources last checked July 18, 2026

Where in St. Lucie County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Port St. Lucie

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Port St. Lucie, Florida?

A new single-family home in Port St. Lucie pays at least $14,152.00 per unit in combined impact fees (rates sourced July 18, 2026). 4 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Port St. Lucie?

Commercial development in Port St. Lucie pays $5.07 per square foot in impact fees, plus $10,927.00 in one-time water and sewer connection fees, about $264,188.50 for a 50,000 sq ft building.

Does Port St. Lucie charge its own impact fees?

Yes. Port St. Lucie levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Port St. Lucie, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the St. Lucie County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000