Fort Pierce impact fees by project type
Fort Pierce: Single-Family Impact Fees
A new single-family home in Fort Pierce pays at least $7,925.00 per unit in impact fees (rates sourced July 18, 2026). Of that, St. Lucie County-levied fees account for $3,225.00 and municipal or utility fees for $4,700.00.
The largest line items are Sewer/Wastewater Connection Fee (FPUA) ($2,850.00), County Parks Impact Fee (SFR) ($2,356.00) and Water Connection Fee (FPUA) ($1,850.00).
County Fire/EMS Impact Fee (SFR), County Library Impact Fee (SFR), County School/Educational Impact Fee (SFR), and County Road/Transportation Impact Fee (SFR) are set by the county and have no published standard rate. City of Fort Pierce Impact Fees (Ch. 113) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (FPUA)$1,850.00Fort Pierce Utilities Authority (FPUA)FPUA water Capital Improvement Charge (CIC) $1,850/ERC; SFR = 1 ERC (5/8" meter minimum). Res. UA 2018-10, eff 12/1/2018 — current (no newer CIC resolution posted as of 7/2026). GRCs suspended for developments in FPUA territory.
- Sewer/Wastewater Connection Fee (FPUA)$2,850.00Fort Pierce Utilities Authority (FPUA)FPUA wastewater CIC $2,850/ERC; SFR = 1 ERC (5/8" meter minimum); ERC LOS = 240 GPD. Res. UA 2018-10, eff 12/1/2018 — current. 10% of each WW CIC funds Island WRF relocation.
- City of Fort Pierce Impact Fees (Ch. 113)Requires confirmationCity of Fort PierceCity impact fees under Municode Ch. 113. MORATORIUM on imposition/collection of city impact fees within the Fort Pierce Redevelopment Area (CRA) through 11/3/2026 (Ord. 25-033, extended Nov 2025) → $0 inside CRA. Outside CRA, Ch. 113 fees apply — amounts VERIFY (Municode JS-rendered; City Planning 772-467-3737).
- County Parks Impact Fee (SFR)$2,356.00St. Lucie CountyCountywide Parks impact fee, SFR $2,356 (collected within Fort Pierce per FY25 county annual report). Phase IV eff 1/1/2026. Confirmed via City of PSL published DIF schedule; county schedule PDF image-based.
- County Public Buildings Impact Fee (SFR)$516.00St. Lucie CountyCountywide Public Buildings impact fee, SFR $516 (collected in Fort Pierce per FY25 report). Phase IV eff 1/1/2026. County schedule PDF image-based; confirmed via PSL DIF schedule.
- County Law Enforcement Impact Fee (SFR)$353.00St. Lucie CountyCountywide Law Enforcement impact fee, SFR $353. Phase IV eff 1/1/2026. County schedule PDF image-based; confirmed via PSL DIF schedule.
- County Fire/EMS Impact Fee (SFR)Requires confirmationSt. Lucie County Fire DistrictFire/EMS impact fee for St. Lucie County Fire District. Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: slcfd.com / 772-462-1954.
- County Library Impact Fee (SFR)Requires confirmationSt. Lucie CountyCounty Library impact fee (by zone). Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
- County School/Educational Impact Fee (SFR)Requires confirmationSt. Lucie County School BoardEducational/School impact fee, countywide, forwarded to School Board. Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: stlucie.k12.fl.us / 772-462-1954.
- County Road/Transportation Impact Fee (SFR)Requires confirmationSt. Lucie CountyCounty Road/Multi-Modal impact fee, City of Fort Pierce benefit zone. Phase IV eff 1/1/2026 (2025 Multi-Modal Study, Ord. 25-027). Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
Where in St. Lucie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Pierce: Multifamily Impact Fees
A new multifamily unit in Fort Pierce pays at least $5,238.00 per unit in impact fees (rates sourced July 18, 2026). Of that, St. Lucie County-levied fees account for $2,105.00 and municipal or utility fees for $3,133.00.
The largest line items are Sewer/Wastewater Connection Fee (FPUA) (MF) ($1,900.00), County Parks Impact Fee (MF) ($1,541.00) and Water Connection Fee (FPUA) (MF) ($1,233.00).
County Fire/EMS Impact Fee (MF), County Road/Transportation Impact Fee (MF), County School/Educational Impact Fee (MF), and County Library Impact Fee (MF) are set by the county and have no published standard rate. City of Fort Pierce Impact Fees (Ch. 113) (MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (FPUA) (MF)$1,233.00Fort Pierce Utilities Authority (FPUA)FPUA water CIC $1,850/ERC. Canonical MF unit (2BR/1,000 sqft = 200 GPD) = 0.667 ERC relative to SFR (300 GPD) → $1,233. Res. UA 2018-10, eff 12/1/2018 (current). Master-metered complexes billed on total ERCs (= units × 0.667).
- Sewer/Wastewater Connection Fee (FPUA) (MF)$1,900.00Fort Pierce Utilities Authority (FPUA)FPUA wastewater CIC $2,850/ERC. Canonical MF unit 0.667 ERC (200 GPD / 300 GPD SFR) → $1,900. Res. UA 2018-10, eff 12/1/2018 (current).
- City of Fort Pierce Impact Fees (Ch. 113) (MF)Requires confirmationCity of Fort PierceCity impact fees under Municode Ch. 113. MORATORIUM within Fort Pierce Redevelopment Area (CRA) through 11/3/2026 (Ord. 25-033) → $0 inside CRA. Outside CRA, Ch. 113 MF fees apply — VERIFY (Municode JS-rendered; 772-467-3737).
- County Parks Impact Fee (MF)$1,541.00St. Lucie CountyCountywide Parks impact fee, MF $1,541/unit (collected in Fort Pierce per FY25 report). Phase IV eff 1/1/2026. County schedule PDF image-based.
- County Public Buildings Impact Fee (MF)$337.00St. Lucie CountyCountywide Public Buildings impact fee, MF $337/unit. Phase IV eff 1/1/2026. County schedule PDF image-based.
- County Law Enforcement Impact Fee (MF)$227.00St. Lucie CountyCountywide Law Enforcement impact fee, MF $227/unit. Phase IV eff 1/1/2026. County schedule PDF image-based.
- County Fire/EMS Impact Fee (MF)Requires confirmationSt. Lucie County Fire DistrictFire/EMS impact fee (MF). Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
- County Road/Transportation Impact Fee (MF)Requires confirmationSt. Lucie CountyRoad/Multi-Modal impact fee (MF), City of Fort Pierce zone. Phase IV eff 1/1/2026 (Ord. 25-027). Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
- County School/Educational Impact Fee (MF)Requires confirmationSt. Lucie County School BoardEducational/School impact fee (MF), countywide. Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
- County Library Impact Fee (MF)Requires confirmationSt. Lucie CountyLibrary impact fee (MF). Phase IV eff 1/1/2026. Image-based schedule — amount unconfirmed. VERIFY: 772-462-1954.
Where in St. Lucie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Pierce: Commercial Impact Fees
Commercial development in Fort Pierce pays $8.54 per square foot in impact fees, plus $11,750.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $438,511.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capital Improvement Charge (FPUA) — 1" meter ($7,125.00 one-time), Water Capital Improvement Charge (FPUA) — 1" meter ($4,625.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Commercial) ($6.84/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Government Buildings Impact Fee (City of Fort Pierce, Commercial), Transportation Impact Fee (City of Fort Pierce, Commercial), and Solid Waste Impact Fee (City of Fort Pierce, Commercial) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capital Improvement Charge (FPUA) — 1" meter$4,625.00 one-timeFPUA water CIC $1,850/ERC × 2.5 ERC (1" meter minimum) = $4,625. Res. UA 2018-10. Canonical default meter. Nonres CIC based on estimated flow; meter minimums 5/8"=1, 1"=2.5, 1.5"=5, 2"=8 ERC; >2" by estimate.
- Sewer Capital Improvement Charge (FPUA) — 1" meter$7,125.00 one-timeFPUA wastewater CIC $2,850/ERC × 2.5 ERC (1" meter minimum) = $7,125. Res. UA 2018-10. Canonical default meter. Meter minimums 5/8"=1, 1"=2.5, 1.5"=5, 2"=8 ERC.
- Parks & Recreation Impact Fee (City of Fort Pierce, Commercial)$0.00City of Fort Pierce Parks & Recreation impact fee, Code §113-15 — assessed from RESIDENTIAL new development only. Confirmed $0 for nonres.
- Government Buildings Impact Fee (City of Fort Pierce, Commercial)Requires confirmationCity of Fort Pierce Government Buildings impact fee, Code §113-16 (applies to nonres). Dollar amount set by separate city resolution (Tindale-Oliver 2007 methodology, CPI-indexed) — not codified, not posted online. IMPOSITION/COLLECTION SUSPENDED within the city's Urban Infill & Redevelopment Area (CRA) through 11/3/2026 (Ord. 22-035, extended Ord. 25-033) = $0 inside CRA; outside CRA fee applies at resolution rate. Also note city Stormwater fee §113-18 is impervious-area based (excluded from DB). VERIFY amount: City Planning 772-467-3737.
- Transportation Impact Fee (City of Fort Pierce, Commercial)Requires confirmationCity of Fort Pierce Transportation impact fee, Code §113-19 (applies to nonres; separate from county road fee). Amount set by city resolution — not codified/posted. CRA collection moratorium through 11/3/2026. VERIFY: 772-467-3737.
- Solid Waste Impact Fee (City of Fort Pierce, Commercial)Requires confirmationCity of Fort Pierce Solid Waste impact fee, Code §113-17 (applies to nonres). Amount set by city resolution (not codified/posted online). CRA collection moratorium through 11/3/2026. VERIFY: 772-467-3737.
- County Roads/Multimodal Impact Fee (St. Lucie County, Commercial)$6.84/sq ftSt. Lucie County multi-modal (roads) impact fee, Code §24-258 (Ord. 2025-27). Fort Pierce mainland benefit-zone column, eff 10/1/2025 (steps up 10/1/2026 & 10/1/2027 — recheck). Applies countywide incl. municipalities (§24-5), collected by city. Row: ITE 821 Retail/shopping center 40,000-150,000 sfgla (GLA).
- County Public Buildings Impact Fee (St. Lucie County, Commercial)$0.71/sq ftSt. Lucie County Public Buildings impact fee, Code §24-211 (2022 study; Oct 1 2025 rate; countywide). Row: Retail under 100,000 sf, per 1,000 sf.
- County Fire/EMS Impact Fee (St. Lucie County, Commercial)$0.62/sq ftSt. Lucie County Fire/EMS Protection impact fee, Code §24-55 (2022 study; Jan 1 2026 countywide-assessment schedule, flat rate). Applies countywide incl. municipalities. Row: Retail under 100,000 sf, per 1,000 sf GFA.
- County Law Enforcement Impact Fee (St. Lucie County, Commercial)$0.36/sq ftSt. Lucie County Law Enforcement impact fee, Code §24-95 (2022 study; Oct 1 2024 final phase-in rate, flat thereafter; countywide, sheriff). Row: Retail under 100,000 sf, per 1,000 sf.
- County Library Impact Fee (St. Lucie County, Commercial)$0.00St. Lucie County Library impact fee, Code §24-130 — RESIDENTIAL-ONLY; adopted schedule has no nonresidential rows. Confirmed $0 for nonres.
- County Parks Impact Fee (St. Lucie County, Commercial)$0.00St. Lucie County Parks impact fee, Code §24-172 — RESIDENTIAL-ONLY; adopted schedule (Oct 1 2025) has no nonresidential land-use rows. Confirmed $0 for nonres.
Where in St. Lucie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Pierce: Industrial Impact Fees
Industrial development in Fort Pierce pays $1.47 per square foot in impact fees, plus $11,750.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 50,000 sq ft building, that comes to at least $85,112.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capital Improvement Charge (FPUA) — 1" meter ($7,125.00 one-time), Water Capital Improvement Charge (FPUA) — 1" meter ($4,625.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Industrial) ($1.19/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Government Buildings Impact Fee (City of Fort Pierce, Industrial), Transportation Impact Fee (City of Fort Pierce, Industrial), and Solid Waste Impact Fee (City of Fort Pierce, Industrial) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capital Improvement Charge (FPUA) — 1" meter$4,625.00 one-timeFPUA water CIC $1,850/ERC × 2.5 ERC (1" meter minimum) = $4,625. Res. UA 2018-10. Canonical default meter. Nonres CIC based on estimated flow; meter minimums 5/8"=1, 1"=2.5, 1.5"=5, 2"=8 ERC; >2" by estimate.
- Sewer Capital Improvement Charge (FPUA) — 1" meter$7,125.00 one-timeFPUA wastewater CIC $2,850/ERC × 2.5 ERC (1" meter minimum) = $7,125. Res. UA 2018-10. Canonical default meter. Meter minimums 5/8"=1, 1"=2.5, 1.5"=5, 2"=8 ERC.
- Parks & Recreation Impact Fee (City of Fort Pierce, Industrial)$0.00City of Fort Pierce Parks & Recreation impact fee, Code §113-15 — residential-only. Confirmed $0 for nonres.
- Government Buildings Impact Fee (City of Fort Pierce, Industrial)Requires confirmationCity of Fort Pierce Government Buildings impact fee, Code §113-16. Amount set by city resolution (not codified/posted). CRA collection moratorium through 11/3/2026. VERIFY: 772-467-3737.
- Transportation Impact Fee (City of Fort Pierce, Industrial)Requires confirmationCity of Fort Pierce Transportation impact fee, Code §113-19. Amount by city resolution (not posted). CRA collection moratorium through 11/3/2026. VERIFY: 772-467-3737.
- Solid Waste Impact Fee (City of Fort Pierce, Industrial)Requires confirmationCity of Fort Pierce Solid Waste impact fee, Code §113-17. Amount by city resolution (not posted). CRA collection moratorium through 11/3/2026. VERIFY: 772-467-3737.
- County Roads/Multimodal Impact Fee (St. Lucie County, Industrial)$1.19/sq ftSt. Lucie County multi-modal (roads) impact fee, Code §24-258 (Ord. 2025-27). Fort Pierce mainland benefit-zone column, eff 10/1/2025 (steps up 10/1/2026 & 10/1/2027). Applies countywide (§24-5). Row: ITE 110 General industrial, per 1,000 sf.
- County Public Buildings Impact Fee (St. Lucie County, Industrial)$0.11/sq ftSt. Lucie County Public Buildings impact fee, Code §24-211 (Oct 1 2025 rate, countywide). Row: General industrial, per 1,000 sf.
- County Fire/EMS Impact Fee (St. Lucie County, Industrial)$0.09/sq ftSt. Lucie County Fire/EMS impact fee, Code §24-55 (Jan 1 2026 schedule, countywide flat). Row: General industrial, per 1,000 sf.
- County Law Enforcement Impact Fee (St. Lucie County, Industrial)$0.07/sq ftSt. Lucie County Law Enforcement impact fee, Code §24-95 (Oct 1 2024 rate, countywide). Row: General industrial, per 1,000 sf.
- County Parks Impact Fee (St. Lucie County, Industrial)$0.00St. Lucie County Parks impact fee, Code §24-172 — RESIDENTIAL-ONLY, no nonres rows. Confirmed $0 for nonres.
- County Library Impact Fee (St. Lucie County, Industrial)$0.00St. Lucie County Library impact fee, Code §24-130 — RESIDENTIAL-ONLY, no nonres rows. Confirmed $0 for nonres.
Where in St. Lucie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Fort Pierce: Office Impact Fees
Office development in Fort Pierce pays $5.38 per square foot in impact fees, plus $11,750.00 in one-time water and sewer connection fees (rates sourced July 18, 2026).
For a 25,000 sq ft building, that comes to at least $146,134.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Capital Improvement Charge (FPUA) — 1" meter ($7,125.00 one-time), Water Capital Improvement Charge (FPUA) — 1" meter ($4,625.00 one-time) and County Roads/Multimodal Impact Fee (St. Lucie County, Office) ($4.02/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Transportation Impact Fee (City of Fort Pierce, Office), Solid Waste Impact Fee (City of Fort Pierce, Office), and Government Buildings Impact Fee (City of Fort Pierce, Office) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Capital Improvement Charge (FPUA) — 1" meter$4,625.00 one-timeFPUA water CIC $1,850/ERC × 2.5 ERC (1" meter minimum) = $4,625. Res. UA 2018-10. Canonical default meter. Nonres CIC based on estimated flow; meter minimums 5/8"=1, 1"=2.5, 1.5"=5, 2"=8 ERC; >2" by estimate.
- Sewer Capital Improvement Charge (FPUA) — 1" meter$7,125.00 one-timeFPUA wastewater CIC $2,850/ERC × 2.5 ERC (1" meter minimum) = $7,125. Res. UA 2018-10. Canonical default meter. Meter minimums 5/8"=1, 1"=2.5, 1.5"=5, 2"=8 ERC.
- Parks & Recreation Impact Fee (City of Fort Pierce, Office)$0.00City of Fort Pierce Parks & Recreation impact fee, Code §113-15 — residential-only. Confirmed $0 for nonres.
- Transportation Impact Fee (City of Fort Pierce, Office)Requires confirmationCity of Fort Pierce Transportation impact fee, Code §113-19. Amount by city resolution (not posted). CRA collection moratorium through 11/3/2026. VERIFY: 772-467-3737.
- Solid Waste Impact Fee (City of Fort Pierce, Office)Requires confirmationCity of Fort Pierce Solid Waste impact fee, Code §113-17. Amount by city resolution (not posted). CRA collection moratorium through 11/3/2026. VERIFY: 772-467-3737.
- Government Buildings Impact Fee (City of Fort Pierce, Office)Requires confirmationCity of Fort Pierce Government Buildings impact fee, Code §113-16. Amount set by city resolution (not codified/posted). CRA collection moratorium through 11/3/2026. VERIFY: 772-467-3737.
- County Roads/Multimodal Impact Fee (St. Lucie County, Office)$4.02/sq ftSt. Lucie County multi-modal (roads) impact fee, Code §24-258 (Ord. 2025-27). Fort Pierce mainland benefit-zone column, eff 10/1/2025 (steps up 10/1/2026 & 10/1/2027). Applies countywide incl. municipalities (§24-5). Row: ITE 710 General office, per 1,000 sf.
- County Fire/EMS Impact Fee (St. Lucie County, Office)$0.70/sq ftSt. Lucie County Fire/EMS impact fee, Code §24-55 (Jan 1 2026 schedule, countywide flat). Row: General office, per 1,000 sf.
- County Public Buildings Impact Fee (St. Lucie County, Office)$0.48/sq ftSt. Lucie County Public Buildings impact fee, Code §24-211 (Oct 1 2025 rate, countywide). Row: General office, per 1,000 sf.
- County Law Enforcement Impact Fee (St. Lucie County, Office)$0.17/sq ftSt. Lucie County Law Enforcement impact fee, Code §24-95 (Oct 1 2024 rate, countywide). Row: General office, per 1,000 sf.
- County Library Impact Fee (St. Lucie County, Office)$0.00St. Lucie County Library impact fee, Code §24-130 — RESIDENTIAL-ONLY, no nonres rows. Confirmed $0 for nonres.
- County Parks Impact Fee (St. Lucie County, Office)$0.00St. Lucie County Parks impact fee, Code §24-172 — RESIDENTIAL-ONLY, no nonres rows. Confirmed $0 for nonres.
Where in St. Lucie County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Fort Pierce
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Fort Pierce, Florida?
A new single-family home in Fort Pierce pays at least $7,925.00 per unit in combined impact fees (rates sourced July 18, 2026). 5 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Fort Pierce?
Commercial development in Fort Pierce pays $8.54 per square foot in impact fees, plus $11,750.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $438,511.50 for a 50,000 sq ft building. 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Fort Pierce charge its own impact fees?
Yes. Fort Pierce levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Fort Pierce, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the St. Lucie County impact fees page.